  Test-Stand, Page 23 of 53  Not logged in ELOG logo
ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  266   Friday, January 11, 2013, 11:02 Anders MjosRFQ empty      Target installed, pumping downTarget installed with 120 in lbs torque
on target legs and on central support.
Friday, January 11, 2013, 11:01:
  
  270   Tuesday, January 15, 2013, 16:10 Anders MjosRFQ empty      Turbos off

    

       
            
  
  274   Friday, January 18, 2013, 15:34 Anders Mjosempty      Pumping down empty chamberStarted roughing
Friday, January 18, 2013, 15:25:
Started turbos
  
  275   Friday, January 18, 2013, 15:57 Anders Mjos      Problems/SolutionsConductor bolts to be replacedAfter the last test at the test stand,
one of the conductor bolts (ITD0058) is damaged.
To prevent damage to the thread inserts,
 Model.jpgdamaged_bolt.JPG 
  276   Friday, January 18, 2013, 16:17 Anders MjosRFQ empty     In progressheating 

    
 Test_Stand_cooling_temp_data_2013-01-16.pdfTest_Stand_strip_tool_TGHT_CUR_2013-01-16.PNG 
  277   Monday, January 28, 2013, 12:56 Anders MjosEmpty      Venting For conductor bolt work
Monday, January 28, 2013, 12:56:
Turbos off
  
  278   Monday, January 28, 2013, 14:41 Anders MjosEmpty      Pumping downMonday, January 28, 2013, 14:41: Roughing
Monday, January 28, 2013, 15:35:
Starting turbos
  
  279   Tuesday, February 19, 2013, 08:28 Anders Mjos      Problems/SolutionsOpened all backing valves after scheduled site wide air outage    
  280   Tuesday, February 26, 2013, 08:32 Anders Mjos      Problems/SolutionsTMSTP2 timeout / faultTuesday, February 26, 2013, 08:24: Started
turbo
Tuesday, February 26, 2013, 08:24:
 Vacuum_2013-02-26.PNG 
  281   Monday, March 04, 2013, 09:11 Anders Mjos      Problems/SolutionsRestarted turobos after planned power outageStarted archivers
Started turbos
Switched on ion gauges
  
  282   Tuesday, March 19, 2013, 09:04 Anders Mjos      Problems/SolutionsVenting TMS section for replacement of TP2 by vacuum group 

    
  
  283   Tuesday, March 19, 2013, 12:34 Anders MjosSiC#28 ITETM4  DoneInstallation of SiC#28 LP-RFQTuesday, March 19, 2013, 12:32 : Turbos
off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting
 grab.n5HwXJ.png20130321_heating_and_signal.PNG 
  287   Monday, March 25, 2013, 11:39 Anders MjosTa#39LP-SISITWTM1  DoneTa#39 commissioningTarget installed with 130 in lbs torque
on all bolts.
Monday, March 25, 2013, 11:36: Roughing
  
  289   Thursday, March 28, 2013, 13:55 Anders MjosEmpty     In progressPumping down empty chamberThursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36:
Starting turbos (vacuum at ~0.100 T)
  
  290   Tuesday, April 02, 2013, 15:19 Anders Mjos      Problems/SolutionsWater leak at MB1 Power SupplySee
Cyclotron e-fault 6637
 
  
  291   Tuesday, April 09, 2013, 16:21 Anders Mjos      Problems/SolutionsWater leak at MB1 Power Supply 

    
  
  292   Wednesday, April 10, 2013, 12:14 Anders MjosTa#40HP-SISITETM438295-4 DoneConditioning Ta#40 Wednesday, April 10, 2013, 12:13:
Stopped turbos in preparation for venting
the chamber.
  
  293   Thursday, April 11, 2013, 08:49 Anders Mjos      Problems/SolutionsMB1 Power Supply operational 

    
  
  294   Tuesday, April 16, 2013, 08:59 Anders Mjos      Problems/SolutionsTMS:TP2 found in timeout / fault stateTuesday, April 16, 2013, 08:59
The turbo was found in fault state
this morning. Based on data from IG6 the
 TMS-TP2_Fault.pngTMS-IG6-RDVAC.png 
  295   Thursday, April 18, 2013, 13:50 Anders MjosTa#40HP-SISITETM438295-4 DoneTa#40 stored under vacuumTarget installed at the Test Stand after
an inspection in the lab. EE was cleand.
All bolts torqued to 130 in lbs
  