Wednesday, October 12, 2011, 13:14, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target removed
|
Anders Mjos wrote: |
Anders Mjos wrote: |
Aurelia Laxdal wrote: |
Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.
|
Monday, October 03, 2011, 13:45: Venting.
|
Monday, October 03, 2011, 14:45
- Target was visually inspected and found to be ready to go online.
- No burn marks found on the 9-pin connectors.
- Pumping down. Target will be stored under vacuum for now. Target is scheduled to go to Hot Cell on Oct. 20th. Electrical connections (target/tube heater + coil) are not connected
|
Wednesday, October 12, 2011, 13:15: Venting
Wednesday, October 12, 2011, 14:15: Target brought back to lab for inspection and final check. |
Thursday, October 13, 2011, 15:42, Anders Mjos, Training , HP-FEBIAD, , , , , Problems/Solutions, Target ready to be heated
|
Rick Maharaj wrote: |
test stand vented
|
Thursday, October 13, 2011, 15:40: Pumping down
Friday, October 14, 2011, 10:00: Cooling water is on. Pressure increase from 8e-7 to 3e-6 torr. Venting.
Friday, October 14, 2011, 11:10: Replaced seals on cooling lines with new silver plated SS seals. Pumping down.
Friday, October 14, 2011, 13:25: Cooling water is on. Vacuum at 1.35e-6 torr.
Monday, October 17, 2011, 09:00: Vacuum at 5.4e-7 torr. target ready to be heated. |
Thursday, August 23, 2012, 11:39, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 installed
|
Thursday, August 23, 2012, 11:38: NiO#1 installed.
Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.
Thursday, August 23, 2012, 11:54: Roughing.
Thursday, August 23, 2012, 12:12 : Starting turbos.
Thursday, August 23, 2012, 12:16 : TP1B at speed.
Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.
Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5
Thursday, August 23, 2012, 12:22: Vacuum at 2E-5
Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7 |
Friday, August 24, 2012, 08:28, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, NiO#1 installed
|
Anders Mjos wrote: |
Thursday, August 23, 2012, 11:38: NiO#1 installed.
Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.
Thursday, August 23, 2012, 11:54: Roughing.
Thursday, August 23, 2012, 12:12 : Starting turbos.
Thursday, August 23, 2012, 12:16 : TP1B at speed.
Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.
Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5
Thursday, August 23, 2012, 12:22: Vacuum at 2E-5
Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7
|
Friday, August 24, 2012, 08:28: Opened water lines. No response in vacuum. Stable at 3.1E-7 |
Monday, August 27, 2012, 13:21, Aurelia Laxdal, NiO#1, HP-FEBIAD, ITE, TM4, , , In progress, HV conditioning at Test Stand
|
Did HV conditioning up to TSG:BIAS=30kV, TSH=EE=-600V
Turned off the HV for Kazuya to check the connection/output of the TSG:TGHT Xantrex power supply. |
Tuesday, August 28, 2012, 16:57, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, Updates for NiO#1 at Test Stand
|
Tested the power supplies and locked up the HV cage.
Turned on the HV: 30kV.
Tomorrow we'll start up the heaters: 580A for the target and 280-300A for the tube. |
Wednesday, August 29, 2012, 11:34, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 heating startup & few checks
|
Friedhelm checked the voltage across R4 from ISK4563D-rev2.pdf. It shows 50 kOhms with the power supplies off and everything connected according to the drawing. With the Anode PS On and set at 20V, we could see the same readback on EPICS and on the meter.
Then started the heater ramping: auto ramp 2A/min.
We'd be watching the vacuum carefully during this process. Also the setup is such that:
- the target and tube heaters are only incremented if the vacuum is less than 5e-6Torr
- and if the vacuum exceeds 2e-5Torr the last increment of the target and tube heater is backed off.
Pierre asked for the 2e-5Torr limit to be changed to 8e-6Torr.
Anders asked to stop the heating at 500A to take a temperature measurement.
Raising the target heater from 500A to 580A.
Did a mass scan at TGHT=580A & TBHT=280A: Plotdump-local-clean.txt Aug29 12 19-53-16.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html |
Thursday, August 30, 2012, 14:34, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 updates
|
Did another mass scan at 280A for the ionizer:
Plotdump-local-clean.txt Aug30 12 14-28-14.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html
Ramping up the TBHT from 280A -> 290A
And from 290A -> 300A:
Plotdump-local-clean.txt Aug30 12 16-40-29.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html |
Thursday, August 30, 2012, 16:51, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, NiO#1 cooldown started
|
Started the cooldown. |
Friday, August 31, 2012, 11:12, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , Done, Finished testing NiO#1
|
Turned off the HV and the optics in the first section. Couldn't turn off the optics in the second section: left a message for Evgeniy.
Also TMS:RP2 is very noisy. Talked to Edi D. from vacuum group. He would work on it this afternoon. E-Fault#6282 |
Friday, August 31, 2012, 11:39, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, Venting vacuum chamber - source change
|
Friday, August 31, 2012, 11:39: Stopped turbos.
Friday, August 31, 2012, 13:06: Venting.
Friday, August 31, 2012, 13:23: Water lines purged.
Friday, August 31, 2012, 13:25 : Vented |
Thursday, September 20, 2012, 15:52, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training
|
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
Thursday, September 20, 2012, 16:29: Starting turbos
Thursday, September 20, 2012, 16:38 : Turbos at speed
Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr
|
Friday, September 21, 2012, 08:20, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training
|
Anders Mjos wrote: |
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
Thursday, September 20, 2012, 16:29: Starting turbos
Thursday, September 20, 2012, 16:38 : Turbos at speed
Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr
|
Friday, September 21, 2012, 08:19: Cooling water on. Vacuum stable at 2.3E-7 torr. |
Monday, October 01, 2012, 10:41, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, SiC-HP-FEBIAD for operator training - Source ON
|
Turned the source back ON. Heaters are ramping up. |
Wednesday, October 03, 2012, 13:50, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, Training updates
|
On Monday October 1, the HP-FEBIAD source was turned ON again, to complete the operator training. The last session was yesterday and for the time being the ISAC operators can play with the source when time allows, and from the ISAC Control room. For this purpose the source will be kept on this week and also over the week-end. |
Thursday, October 25, 2012, 11:13, Anders Mjos, Test, HP-FEBIAD, , , , , In progress, Venting chamber for installation of TiC#3
|
Thursday, October 25, 2012, 11:11: Vacuum at 1.3E-7 T
Thursday, October 25, 2012, 11:12: Turbos off
Thursday, October 25, 2012, 11:50: Venting |
Monday, November 05, 2012, 14:42, Anders Mjos, Test SiC, HP-FEBIAD, , , , , Done, Pumping down
|
Monday, November 05, 2012, 14:41: Roughing
Monday, November 05, 2012, 14:58: Started turbos
Monday, November 05, 2012, 15:06 : Turbos at speed
Monday, November 05, 2012, 15:068: Vacuum at 2.2E-5 T
Wednesday, November 07, 2012, 08:26: Cooling water open. Vacuum stable at 1.8E-7 T |
Monday, November 19, 2012, 10:20, Aurelia Laxdal, Test-SiC, HP-FEBIAD, , , , , , Preparations for E-Fault#6389 investigations
|
Prepared the Test Stand for Controls to investigate E-Fault#6389.
Evgeniy increased the current limit on the power supply TSH:TGHT from 2 rotations to 7 rotations, after talking to Ray Dube.
I turned on the HV at 30kV and started the Auto-ramping. |
Thursday, November 22, 2012, 12:52, Aurelia Laxdal, Test-SiC, HP-FEBIAD, , , , , , E-Fault#6389 re-directed to PS
|
Evgeniy and Kazuya investigated the problem with TSH:TGHT readbacks and they came to the conclusion that the PS is faulty, and the PLC reads correctly the signal sent by the PS. Kazuya is redirecting the E-Fault from Controls to PS.
Ray Dube estimated few weeks (4-6) to send the PS offsite for repairs. This needs to be scheduled. For the time being, one can use the Test Stand with the PS setpoints, displayed on its front panel, as a reference. |
Wednesday, May 29, 2013, 12:10, Anders Mjos, CTL FEBIAD, HP-FEBIAD, , , 38481-5, , Done, CTL Test
|
Wednesday, May 29, 2013, 12:09: Debiased to insert temp logger
Wednesday, May 29, 2013, 14:40: Temp logger installed
CH1 COIL
CH2 CTL Block
Wednesday, May 29, 2013, 14:51: Opening gas lines
Temperatures [deg C]
COIL: 190
CTL: 44
Wednesday, May 29, 2013, 15:31: Coil at 50A
Temperatures [deg C]
COIL: 212
CTL: 45
Thursday, May 30, 2013, 09:18: TGHT was voltage limited at about 570A. Increased voltage limit to 5.5V and raised current to 580A
Thursday, May 30, 2013, 09:20: Ramping TBHT to 280A
Thursday, May 30, 2013, 10:03
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, May 30, 2013, 10:07: Heard a noise from the vacuum chamber coinciding with a spike in vacuum on both gauges.
Monday, June 03, 2013, 08:54: Target debiased and gases off. Target cooling started in preparation for power outage tomorrow at 9am.
Wednesday, June 05, 2013, 09:57: Purging gas lines to vacuum chamber
Wednesday, June 05, 2013, 10:13: Target biased again. Started target heating.
Thursday, June 06, 2013, 13:23:
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, June 06, 2013, 16:45: TBHT increased ti 290A
Temperatures [deg C]
COIL: 230
CTL: 50
Friday, June 07, 2013, 08:40: Magnet found off. TPS:Q4 and TPS:Q2 found off.
Temperatures [deg C]
COIL: 227
CTL: 48
Friday, June 07, 2013, 14:21: Anode current limit increased to 500 mA. Adjusted magnet current. Increasing TBHT.
Friday, June 07, 2013, 16:24: TBHT at 296A
Temperatures [deg C]
COIL: 237
CTL: 50
Monday, June 10, 2013, 08:19
Temperatures [deg C]
COIL: 232
CTL: 49
Monday, June 10, 2013, 16:55: COIL at 60A
Temperatures [deg C]
COIL: 244
CTL: 49
Tuesday, June 11, 2013, 08:42: TBHT voltage limited this morning at 291A
Temperatures [deg C]
COIL: 242
CTL: 49
Tuesday, June 11, 2013, 11:02: COIL at 70A
Temperatures [deg C]
COIL: 256
CTL: 49
Tuesday, June 11, 2013, 15:49: COIL at 80A
Temperatures [deg C]
COIL: 272
CTL: 49
Wednesday, June 12, 2013, 08:19:
Short on TBHT - see attached photo.
T/C logger is is off.
Gas lines closed.
Cooling down target.
Target debiased.
Thursday, June 13, 2013, 08:37: Turbos stopped.
Thursday, June 13, 2013, 09:20: Water lines purged.
Thursday, June 13, 2013, 09:41: Venting
Thursday, June 13, 2013, 10:19: Target removed |
|