  23   Thursday, October 13, 2011, 15:42 Anders MjosTraining HP-FEBIAD    Problems/SolutionsTarget ready to be heated

Rick Maharaj wrote:

test stand vented

 Thursday, October 13, 2011, 15:40: Pumping down

Friday, October 14, 2011, 10:00: Cooling water is on. Pressure increase from 8e-7 to 3e-6 torr. Venting.

Friday, October 14, 2011, 11:10: Replaced seals on cooling lines with new silver plated SS seals. Pumping down.

Friday, October 14, 2011, 13:25: Cooling water is on. Vacuum at 1.35e-6 torr.

Monday, October 17, 2011, 09:00: Vacuum at 5.4e-7 torr. target ready to be heated.

  180   Thursday, August 23, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  In progressNiO#1 installed

Thursday, August 23, 2012, 11:38: NiO#1 installed.

Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.

Thursday, August 23, 2012, 11:54: Roughing.

Thursday, August 23, 2012, 12:12 : Starting turbos.

Thursday, August 23, 2012, 12:16 : TP1B at speed.

Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.

Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5

Thursday, August 23, 2012, 12:22: Vacuum at 2E-5

Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7

  182   Friday, August 24, 2012, 08:28 Anders MjosNiO#1HP-FEBIADITETM4  DoneNiO#1 installed

Anders Mjos wrote:

Thursday, August 23, 2012, 11:38: NiO#1 installed.

Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.

Thursday, August 23, 2012, 11:54: Roughing.

Thursday, August 23, 2012, 12:12 : Starting turbos.

Thursday, August 23, 2012, 12:16 : TP1B at speed.

Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.

Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5

Thursday, August 23, 2012, 12:22: Vacuum at 2E-5

Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7

 Friday, August 24, 2012, 08:28: Opened water lines. No response in vacuum. Stable at 3.1E-7

  183   Monday, August 27, 2012, 13:21 Aurelia LaxdalNiO#1HP-FEBIADITETM4  In progressHV conditioning at Test Stand

Did HV conditioning up to TSG:BIAS=30kV, TSH=EE=-600V

Turned off the HV for Kazuya to check the connection/output of the TSG:TGHT Xantrex power supply.

  185   Tuesday, August 28, 2012, 16:57 Aurelia Laxdal HP-FEBIADITETM4  In progressUpdates for NiO#1 at Test Stand

Tested the power supplies and locked up the HV cage.

Turned on the HV: 30kV.

Tomorrow we'll start up the heaters: 580A for the target and 280-300A for the tube.

  186   Wednesday, August 29, 2012, 11:34 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 heating startup & few checks

Friedhelm checked the voltage across R4 from ISK4563D-rev2.pdf. It shows 50 kOhms with the power supplies off and everything connected according to the drawing. With the Anode PS On and set at 20V, we could see the same readback on EPICS and on the meter.

Then started the heater ramping: auto ramp 2A/min.

We'd be watching the vacuum carefully during this process. Also the setup is such that:

- the target and tube heaters are only incremented if the vacuum is less than 5e-6Torr

- and if the vacuum exceeds 2e-5Torr the last increment of the target and tube heater is backed off.

Pierre asked for the 2e-5Torr limit to be changed to 8e-6Torr.

Anders asked to stop the heating at 500A to take a temperature measurement.

Raising the target heater from 500A to 580A.

Did a mass scan at TGHT=580A & TBHT=280A:  Plotdump-local-clean.txt Aug29 12 19-53-16.txt

http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html

  187   Thursday, August 30, 2012, 14:34 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 updates

Did another mass scan at 280A for the ionizer:

Plotdump-local-clean.txt Aug30 12 14-28-14.txt

http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html

Ramping up the TBHT from 280A -> 290A

 

And from 290A -> 300A:

Plotdump-local-clean.txt Aug30 12 16-40-29.txt

http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html

  188   Thursday, August 30, 2012, 16:51 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 cooldown started

Started the cooldown.

  190   Friday, August 31, 2012, 11:12 Aurelia Laxdal HP-FEBIADITETM4  DoneFinished testing NiO#1

Turned off the HV and the optics in the first section. Couldn't turn off the optics in the second section: left a message for Evgeniy.

Also TMS:RP2 is very noisy. Talked to Edi D. from vacuum group. He would work on it this afternoon. E-Fault#6282

  191   Friday, August 31, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  DoneVenting vacuum chamber - source change

Friday, August 31, 2012, 11:39: Stopped turbos.

Friday, August 31, 2012, 13:06: Venting.

Friday, August 31, 2012, 13:23: Water lines purged.

Friday, August 31, 2012, 13:25 : Vented

  207   Thursday, September 20, 2012, 15:52 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

Thursday, September 20, 2012, 15:50: Roughing

Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.

Thursday, September 20, 2012, 16:09: Roughing

Thursday, September 20, 2012, 16:29: Starting turbos

Thursday, September 20, 2012, 16:38 : Turbos at speed

Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr

 

  208   Friday, September 21, 2012, 08:20 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

Anders Mjos wrote:

Thursday, September 20, 2012, 15:50: Roughing

Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.

Thursday, September 20, 2012, 16:09: Roughing

Thursday, September 20, 2012, 16:29: Starting turbos

Thursday, September 20, 2012, 16:38 : Turbos at speed

Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr

 

 Friday, September 21, 2012, 08:19: Cooling water on. Vacuum stable at 2.3E-7 torr.

  218   Monday, October 01, 2012, 10:41 Aurelia Laxdal HP-FEBIAD    In progressSiC-HP-FEBIAD for operator training - Source ON

Turned the source back ON. Heaters are ramping up.

  219   Wednesday, October 03, 2012, 13:50 Aurelia Laxdal HP-FEBIAD    In progressTraining updates

On Monday October 1, the HP-FEBIAD source was turned ON again, to complete the operator training. The last session was yesterday and for the time being the ISAC operators can play with the source when time allows, and from the ISAC Control room. For this purpose the source will be kept on this week and also over the week-end.

  222   Thursday, October 25, 2012, 11:13 Anders MjosTestHP-FEBIAD    In progressVenting chamber for installation of TiC#3

Thursday, October 25, 2012, 11:11: Vacuum at 1.3E-7 T

Thursday, October 25, 2012, 11:12: Turbos off

Thursday, October 25, 2012, 11:50: Venting

  232   Monday, November 05, 2012, 14:42 Anders MjosTest SiCHP-FEBIAD    DonePumping down

Monday, November 05, 2012, 14:41: Roughing

Monday, November 05, 2012, 14:58: Started turbos

Monday, November 05, 2012, 15:06 : Turbos at speed

Monday, November 05, 2012, 15:068: Vacuum at 2.2E-5 T

Wednesday, November 07, 2012, 08:26: Cooling water open. Vacuum stable at 1.8E-7 T

  233   Monday, November 19, 2012, 10:20 Aurelia LaxdalTest-SiCHP-FEBIAD     Preparations for E-Fault#6389 investigations

Prepared the Test Stand for Controls to investigate E-Fault#6389.


Evgeniy increased the current limit on the power supply TSH:TGHT from 2 rotations to 7 rotations, after talking to Ray Dube.

I turned on the HV at 30kV and started the Auto-ramping.

  234   Thursday, November 22, 2012, 12:52 Aurelia LaxdalTest-SiCHP-FEBIAD     E-Fault#6389 re-directed to PS

Evgeniy and Kazuya investigated the problem with TSH:TGHT readbacks and they came to the conclusion that the PS is faulty, and the PLC reads correctly the signal sent by the PS.  Kazuya is redirecting the E-Fault from Controls to PS.

Ray Dube estimated few weeks (4-6) to send the PS offsite for repairs. This needs to be scheduled. For the time being, one can use the Test Stand with the PS setpoints, displayed on its front panel, as a reference.

  308   Wednesday, May 29, 2013, 12:10 Anders MjosCTL FEBIADHP-FEBIAD  38481-5 DoneCTL Test

Wednesday, May 29, 2013, 12:09: Debiased to insert temp logger

Wednesday, May 29, 2013, 14:40: Temp logger installed

CH1 COIL
CH2 CTL Block

Wednesday, May 29, 2013, 14:51: Opening gas lines

Temperatures [deg C]
COIL: 190
CTL:   44

Wednesday, May 29, 2013, 15:31: Coil at 50A

Temperatures [deg C]
COIL: 212
CTL:   45


Thursday, May 30, 2013, 09:18: TGHT was voltage limited at about 570A. Increased voltage limit to 5.5V and raised current to 580A

Thursday, May 30, 2013, 09:20: Ramping TBHT to 280A

Thursday, May 30, 2013, 10:03

Temperatures [deg C]
COIL: 227
CTL:   48

Thursday, May 30, 2013, 10:07: Heard a noise from the vacuum chamber coinciding with a spike in vacuum on both gauges.


Monday, June 03, 2013, 08:54: Target debiased and gases off. Target cooling started in preparation for power outage tomorrow at 9am.


Wednesday, June 05, 2013, 09:57: Purging gas lines to vacuum chamber

Wednesday, June 05, 2013, 10:13: Target biased again. Started target heating.


Thursday, June 06, 2013, 13:23:

Temperatures [deg C]
COIL: 227
CTL:   48

Thursday, June 06, 2013, 16:45: TBHT increased ti 290A

Temperatures [deg C]
COIL: 230
CTL:   50


Friday, June 07, 2013, 08:40: Magnet found off. TPS:Q4 and TPS:Q2 found off.

Temperatures [deg C]
COIL: 227
CTL:   48

Friday, June 07, 2013, 14:21: Anode current limit increased to 500 mA. Adjusted magnet current. Increasing TBHT.

Friday, June 07, 2013, 16:24: TBHT at 296A

Temperatures [deg C]
COIL: 237
CTL:   50


Monday, June 10, 2013, 08:19 

Temperatures [deg C]
COIL: 232
CTL:   49

Monday, June 10, 2013, 16:55: COIL at 60A

Temperatures [deg C]
COIL: 244
CTL:   49


Tuesday, June 11, 2013, 08:42: TBHT voltage limited this morning at 291A

Temperatures [deg C]
COIL: 242
CTL:   49

Tuesday, June 11, 2013, 11:02: COIL at 70A

Temperatures [deg C]
COIL: 256
CTL:   49

Tuesday, June 11, 2013, 15:49: COIL at 80A

Temperatures [deg C]
COIL: 272
CTL:   49


Wednesday, June 12, 2013, 08:19:
 Short on TBHT - see attached photo.
T/C logger is is off.
Gas lines closed.
Cooling down target.
Target debiased.


Thursday, June 13, 2013, 08:37: Turbos stopped.

Thursday, June 13, 2013, 09:20: Water lines purged.

Thursday, June 13, 2013, 09:41: Venting

Thursday, June 13, 2013, 10:19: Target removed

Attachment 1: Photo_2013-06-13_10_33_42_AM.jpg
Photo_2013-06-13_10_33_42_AM.jpg
  330   Friday, August 30, 2013, 15:09 Anders MjosNiO#2HP-FEBIADITETM339530-639069-4DoneConditioning of NiO#2

Friday, August 30, 2013, 15:09 : Turbos stopped in preparation for installation. 

Friday, August 30, 2013, 16:22: Venting

Friday, August 30, 2013, 17:08: Roughing with NiO#2

Friday, August 30, 2013, 17:27: Starting turbos

Friday, August 30, 2013, 17:35: Turbos at speed

Friday, August 30, 2013, 17:37:  Vacuum at 1.9 E-7 T


Monday, September 09, 2013, 14:04: Opened up water. Vacuum stable at 1.5E-7 T


Tuesday, September 10, 2013, 08:59: Pumping out the gas lines.

Tuesday, September 10, 2013, 09:10: Gas lines evacuated.

Tuesday, September 10, 2013, 09:23: TPS:IV4 opened

Tuesday, September 10, 2013, 10:06: TGHT PS was off. Debiased to access el cage.

Tuesday, September 10, 2013, 10:07: EZL/EE/BIAS: 15/2/30 kV 61/674/55 uA

Tuesday, September 10, 2013, 10:08: COIL/ANODE: 50A/200V

Tuesday, September 10, 2013, 10:09: Started target heat to TGHT/TBHT 250/230A

Tuesday, September 10, 2013, 15:12: Started target heat to TGHT 350A (TBHT remains at 230A)


Wednesday, September 11, 2013, 13:06: Heating TGHT to 500A


Thursday, September 12, 2013, 08:44: Heating TGHT to 580A

Thursday, September 12, 2013, 09:39: Heating TBHT to 260A

Thursday, September 12, 2013, 10:06: BIAS sparking occurred  at 9:48 TBHT:RDCUR at 256A. Gradually reduced TBHT:RDCUR to 254A. Sparking stopped after ~20 min. ANODE:RDCUR, EE:RDCUR and IG1:RDVAC showed correlated sparking responses. ANODE:RDCUR went to 0 mA and back up after sparking had stopped.

 Thursday, September 12, 2013, 10:30: Manually increased TBHT:RDCUR to 260A.

Thursday, September 12, 2013, 11:06: A jump in TBHT:RDVOLT and TBHT:RDCUR at 10:44. Reduced TBHT:RDCUR to 255A

Thursday, September 12, 2013, 12:10:  TPS:Q4 was taken out by a spark. Restarted.

Thursday, September 12, 2013, 12:19: EZL to 13 kV

Thursday, September 12, 2013, 13:14: TBHT:RDCUR to 260A

Thursday, September 12, 2013, 13:31: TBHT:RDCUR to 265A. Sparking returns. Lower to 260A


Friday, September 13, 2013, 10:51: Increased TBHT:RDCUR to 265A

Friday, September 13, 2013, 10:58 : Increased TBHT:RDCUR to 270A

Friday, September 13, 2013, 11:05: Some sparking. Lowered EE to 1kV

Friday, September 13, 2013, 11:07 : Increased TBHT:RDCUR to 275A

Friday, September 13, 2013, 11:15 : Increased TBHT:RDCUR to 280A

Friday, September 13, 2013, 11:24 : Increased TBHT:RDCUR to 290A. ANODE:RDCUR 8.5mA. FC0 1.3E-6 A

Friday, September 13, 2013, 11:53: SV5 and SV2 gas lines opened.

Friday, September 13, 2013, 12:05: A spark took out Q4. Restarted.

Friday, September 13, 2013, 12:07: Lowered TBHT:RDCUR to 285A

Friday, September 13, 2013, 13:03: Started mass scan.

Friday, September 13, 2013, 14:27: Lowered TBHT:RDCUR to 280A

Friday, September 13, 2013, 15:01 : Lowered TBHT:RDCUR to 270A


Monday, September 16, 2013, 08:00: Mass scan started. 

Monday, September 16, 2013, 09:00: Starting heater ramp down. 2A/min. Gas lines closed.

Monday, September 16, 2013, 13:30: Source off. Target debiased.

Monday, September 16, 2013, 13:56: Turbos stopped

Monday, September 16, 2013, 14:50: Venting.

Attachment 1: 2013-09-12_NiO#2_TBHT_jump.PNG
2013-09-12_NiO#2_TBHT_jump.PNG