747
|
Friday, July 19, 2019, 13:48 |
Fernando Maldonado | | | | | | | Problems/Solutions | RMP0A and FC6 gains signal redirection to another channel | After submitting a fault report (FR - ISAC
Fault 12461) a Work Permit was issued (WP
- C2019-07-19-1), |
|
748
|
Sunday, July 28, 2019, 14:22 |
Luca Egoriti | P2N - 1 | HP-FEBIAD | ITE | TM2 | p2n - test1 | p2n - test1 | Problems/Solutions | p2n heating test 3 | Friday. July 26th 2019
A new electrical configuration of
the test stand was decided and installed. |
|
749
|
Tuesday, July 30, 2019, 12:19 |
Luca Egoriti | P2N - 1 | HP-FEBIAD | ITE | TM2 | | | Problems/Solutions | p2n heating test - target inspection | The p2n target was taken out of the test
stand for inspection. Comments and measurements
on the container below: |
|
751
|
Wednesday, August 07, 2019, 08:18 |
Luca Egoriti | P2N - 1 | | ITE | TM2 | | | Problems/Solutions | p2n heating test 4 | Tuesday, August 06, 2019, 16:00
Start ramp up to 300+300 = 600 A
|
|
752
|
Wednesday, August 07, 2019, 15:19 |
Fernando Maldonado | | | | | | | Problems/Solutions | Test stand inspection | Wednesday, August 07, 2019, 15:12:
Arthur helped inspected the electric connections
on the TS. |
|
754
|
Tuesday, August 13, 2019, 12:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | Replace RP1 | Tuesday, August 13, 2019, 11:55: Close
PV1. Turn off RP1.
Tuesday, August 13, 2019, 12:02: |
|
755
|
Thursday, August 15, 2019, 16:33 |
Fernando Maldonado | | | | | | | Problems/Solutions | 9-pin connection modification | Thursday, August 15, 2019, 16:17: Q FT
undone to remove the connection to the 9-pin
The idea is to change the cables |
|
756
|
Thursday, August 29, 2019, 14:47 |
Fernando Maldonado | | | | | | Ferran's heat shield | Problems/Solutions | Rewiring-Baking out | Thursday, August 29, 2019, 14:47 : Changing
back to the nominal wiring
Thursday, August 29, 2019, 17:01: |
|
757
|
Monday, September 16, 2019, 10:05 |
Fernando Maldonado | | | | | | | Problems/Solutions | Alignment pin reinstalled | Monday, September 16, 2019, 10:03:
The rightmost alignment pin has been reinstalled
(see picture attached). It was previously |
|
759
|
Thursday, September 26, 2019, 11:30 |
Aaron Schmidt | | | | | | | Problems/Solutions | Replace CANBUS board TSG:CB1 | Thursday, September 26, 2019, 11:28: The
control board to TSG:CB1 was removed and
replaced. |
|
763
|
Wednesday, October 23, 2019, 09:51 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak in Magnet PS | Wednesday, October 23, 2019, 09:50:
Fault: 12797
WP: C2019-10-23-2 |
|
764
|
Friday, October 25, 2019, 12:04 |
Anders Mjos | | | | | | | Problems/Solutions | ISG:TP1A found stopped | Restarted TP. Note that CG1A is above 50
mTorr. CG1B shows 15 mTorr |
|
765
|
Monday, October 28, 2019, 09:24 |
Fernando Maldonado | | | | | | | Problems/Solutions | TSG:CG1A checked with local reader | Monday, October 28, 2019, 09:22: The local
reader indicated 42 mTorr while EPICS showed
51mTorr. |
|
766
|
Wednesday, October 30, 2019, 14:50 |
Fernando Maldonado | | | | | | | Problems/Solutions | Cathode bias mode configuration | Wednesday, October 30, 2019, 14:49: John
C. changed the polarity of the anode power
supply to negative, and Fernando M. rewired |
|
767
|
Thursday, October 31, 2019, 11:37 |
Fernando Maldonado | | | | | | | Problems/Solutions | Probing anode bias supply on the service cap | Thursday, October 31, 2019, 10:41: Cage
removed. Tape put on the limit switches.
Anode interlock bypassed. |
|
768
|
Thursday, October 31, 2019, 13:22 |
Fernando Maldonado | | | | | | | Problems/Solutions | 9pin connector not fully in contact with baseplate | Thursday, October 31, 2019, 13:20: After
inspecting the interior, the 9 pin bracket
was found not making full contact with the |
|
773
|
Wednesday, November 27, 2019, 16:01 |
Fernando Maldonado | | | | | | | Problems/Solutions | New Controller for TP6 | Wednesday, November 27, 2019, 15:31: During
HV tests, bias was around 55kV when a spark
occur and almost immediately the controller |
|
776
|
Friday, January 03, 2020, 11:56 |
Anders Mjos | | | | | | | Problems/Solutions | Upgrading BIAS Power Supply | A new power supply was installed today
by John Chow. Due to differences in pin configuration
of the controls, a change to the cabling |
|
778
|
Tuesday, January 21, 2020, 13:45 |
Aaron Schmidt | | | | | | | Problems/Solutions | RGA Communications error | Tuesday, January 21, 2020, 13:42: The RGA
was unable to connect. Typically connects
on COM4, however it did not register. RGA |
|
779
|
Thursday, January 23, 2020, 16:05 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum tripped due to PLC/EPICS for for the new BIAS | Thursday, January 23, 2020, 16:05: Restarting
vacuum and TPs |
|