  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  156   Friday, August 10, 2012, 11:29 Pierre BricaultNA   N ANAIn progressTest FEBIADThe helium bottle was found empty.
Rick will refill it and hook the
leak detector on the system to find out
  
  167   Monday, August 13, 2012, 10:59 Pierre Bricault      Problems/SolutionsTest FEBIADThis morning I try to contact PS group
no one answer. Dan Louie is in vacation.
I went into the can diagnostics panel
  
  408   Friday, October 31, 2014, 14:57 Anders Mjos LP-FEBIAD  Tube only38307-9In progressTestFriday, October 31, 2014, 14:47: Starting
turbos
Friday, October 31, 2014, 14:57:
 test20141103.pngtest20141103-2.png 
  859   Monday, March 01, 2021, 16:13 Fernando Maldonado      DoneTemporary RGA installation Monday, March 01, 2021, 16:03: An
ExTorr RGA has been installed in the ISAC
test stand.
 EXTorr.PNG 
  92   Tuesday, May 15, 2012, 16:18 Aurelia LaxdalSiC#27HP-SISITETM4  In progressTarget/Ion source conditioningDid the HV conditioning up to 30kV and
started to ramp up the heaters to 580A and
230A.
  
  425   Tuesday, February 03, 2015, 14:33 Anders MjosEmptyLP-SIS    In progressTarget with new center block and new EE insulatorAlso with newly installed RGA
Tuesday, February 03, 2015, 14:33:
Roughing
 2015-02-04-1530trace.pngLP-SIS-newCenterBlock_Feb_05_2015.zip 
  20   Monday, October 03, 2011, 14:46 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget stored under vacuum

    

       
            
  
  21   Wednesday, October 12, 2011, 13:14 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget removed

    

       
            
  
  96   Thursday, May 17, 2012, 08:36 Anders MjosSiC#27HP-SISITETM4  DoneTarget removedThursday, May 17, 2012, 08:36: Turbo pumps
switched off in preparation of target removal.
Thursday, May 17, 2012, 08:51: Purging
  
  11   Friday, September 23, 2011, 16:42 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8In progressTarget ready to be heatedFriday, September 23, 2011, 16:4: Target
installed and roughing started.
Friday, September 23, 2011, 17:12:
  
  23   Thursday, October 13, 2011, 15:42 Anders MjosTraining HP-FEBIAD    Problems/SolutionsTarget ready to be heated

    

       
            
  
  101   Thursday, May 31, 2012, 15:43 Anders MjosTa#38LP-SISITWTM1  In progressTarget ready to be heatedThursday, May 31, 2012, 15:42: Roughing
Thursday, May 31, 2012, 16:01 : Starting
turbos
  
  224   Friday, October 26, 2012, 08:29 Anders MjosTiC#3LP-SISITWTM1  DoneTarget ready for conditioning

    

       
            
  
  18   Monday, October 03, 2011, 10:53 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8DoneTarget is ready to be removed. Turned off the HV and locked up the transformer.
Isolated the ion source box. The target is
under vacuum and the water is still on.
  
  266   Friday, January 11, 2013, 11:02 Anders MjosRFQ empty      Target installed, pumping downTarget installed with 120 in lbs torque
on target legs and on central support.
Friday, January 11, 2013, 11:01:
  
  271   Wednesday, January 16, 2013, 01:06 Sebastian RaederRFQ empty      Target installed - pumping downRFQ empty target installed
Wednesday, January 16, 2013, 01:05:
roughing started
  
  173   Thursday, August 16, 2012, 16:56 Anders Mjos      Problems/SolutionsTarget heater PS disconnected from controls.As per Ray Dube for the FEBIAD anode bias
test. The PS will need to be reconnected
before a target is run.
  
  568   Wednesday, January 25, 2017, 14:57 Aaron Schmidt    42218-1141751-6DoneTarget cleaning test LP-SIS Full Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

 LP-SIS_Full_Clean.docxOMEGA_OM-DAQPRO-5300_15-Feb-17_13.30.42.dlpTS-2017-02-09-10-40.rga 
  567   Wednesday, January 25, 2017, 14:56 Aaron Schmidt    42218-1441751-6DoneTarget cleaning test LP-SIS CC Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

 LP-SIS_CC_Clean.docxTS-2017-02-07-10-40.rgaOMEGA_OM-DAQPRO-5300_09-Feb-17_10.49.31.dlp 
  599   Monday, July 17, 2017, 10:04 Aaron Schmidt HP-SIS  42218-1042738-1 Target cleaning test HP-SIS Full Clean    HP-SIS_Full_Clean_(Short).docxTS-2017-07-27-10-40.rga 