Thursday, March 25, 2021, 08:11, Aaron Schmidt, , , , , , , , Test Stand Tripped. (Water leak)
|
Lot's of water visually present in the chamber.
Wednesday, March 24, 2021, 13:17: Water lines purged.
Vent & wipe out the water inside the chamber. Setup a fan to aid in drying. Manually purge the water from the RP1 Scroll pump through the exhaust.
Thursday, March 25, 2021, 08:06: Gradually open each line to check the water blocks & fittings for a visual leak. Open the ballast plug on RP1, as well as manually purge the water from the RP1 Scroll pump through the exhaust again.
Thursday, March 25, 2021, 08:34: Leak found on FS#3 - Left Coil return (G) water block.
Thursday, March 25, 2021, 09:15: FEBIAD assembly & L-Coil line removed.
Thursday, March 25, 2021, 11:38: Re-connect RP1 to the exhaust port & re-insert the ballast plug.
Thursday, March 25, 2021, 11:40: RP1 Ok. CG1A & CG1 B around 0.048T & dropping. Chamber still open.
Indium gasket installed on G, C-Seal on E.
Friday, March 26, 2021, 08:21: Roughing.
Friday, March 26, 2021, 09:08: Vacuum @ 2.001 T. Opened FS#3 waterline. Quick test.
Friday, March 26, 2021, 09:11: Vacuum @ 1.901 T. No observable spike on CG1.
Friday, March 26, 2021, 09:12: Close FS#3 & purge
Friday, March 26, 2021, 09:27: Quickly open ballast plug.
Friday, March 26, 2021, 09:30: Re-insert plug.
Friday, March 26, 2021, 09:38: CG1 @ 2.253 T.
Friday, March 26, 2021, 09:41: Close BV1A & B.
Friday, March 26, 2021, 09:45: Manually purge water from the RP1 Scroll pump through the exhaust.
Friday, March 26, 2021, 09:51: Re-open BV1A & B.
Friday, March 26, 2021, 10:17: Close BV1A & B. Manually purge water from the RP1 Scroll pump through the exhaust.
Friday, March 26, 2021, 10:26: Close the exhaust & give the pump time to recover.
Friday, March 26, 2021, 10:36: Briefly vent the chamber to 30 T. Re-open BV1A & B.
Friday, March 26, 2021, 11:20: Vacuum @ 1.706T. Open FS#3. Allow to fill with water, then close off. No observable spike on CG1.
Friday, March 26, 2021, 11:25: Opened ballast cap. Close BV1A & B.
Friday, March 26, 2021, 11:26: Close ballast.
Friday, March 26, 2021, 11:29: Briefly vent the chamber to 30 T. Re-open BV1A & B.
Friday, March 26, 2021, 12:11: Vacuum @ 2.75T. Close BV1A & B. Vent chamber to setup a fan.
Monday, March 29, 2021, 09:00: LD & He attached. LD#2 as supplied via Vacuum group.
Monday, March 29, 2021, 09:01: Sniffer set. Leak Rate @ 2.0E-07 to 2.3E-07 atm-cc/sec
Monday, March 29, 2021, 09:03: Pressurize (E)(G) to 75 PSI.
Monday, March 29, 2021, 09:05: No major spike seen on LD.
Monday, March 29, 2021, 09:06: Pressurize (E)(G) to 100 PSI.
Monday, March 29, 2021, 09:09: No major spike seen on LD. Purge He from the lines.
Monday, March 29, 2021, 09:12: Roughing.
Monday, March 29, 2021, 09:22: Opened ballast cap to release water vapour while roughing.
Monday, March 29, 2021, 09:42: Closed the ballast cap. Purge cycle RP1 on & off for the next hour or so.
To purge cycle RP1 for water vapour. Close BV1A & B. Disconnect exhaust line from RP1 & open the upper ballast. Close PV1, Vent with TSG:VV1A till the line reaches atmosphere with dry nitrogen.
Close VV1 & open PV1. Water should spew out of the exhaust. Rough the backing lines down. Open BV1A & B to rough then chamber. Repeat leaving the upper ballast open.
Monday, March 29, 2021, 14:00: Purge RP1. Close upper ballast, re-connect exhaust.
Monday, March 29, 2021, 14:36: TP1B on.
Monday, March 29, 2021, 19:47: TP1A on.
Monday, March 29, 2021, 19:55: IG1 on.
Tuesday, March 30, 2021, 08:52: Vacuum @ 4.48e-06T.
LD to TP1B base @ 1.4E-08 to 1.9E-08 atm-cc/sec.
Tuesday, March 30, 2021, 08:58: He @ 55 PSI
Tuesday, March 30, 2021, 09:04: LD to TP1B base @ 2.4E-08 atm-cc/sec.
Tuesday, March 30, 2021, 09:12: Reconnect FS#3 to DI.
Tuesday, March 30, 2021, 09:14: Opened FS#3 w/ DI
Tuesday, March 30, 2021, 09:20: Vacuum @ 4.40e-06T.
Tuesday, March 30, 2021, 09:33: FS#2, 4, & 5 open. Vacuum ok @ 4.40e-06T
Tuesday, March 30, 2021, 09:34: Power/sources on.
Tuesday, March 30, 2021, 09:37: Auto-ramping TGHT / TBHT to 200 / 100 A @ 2 A per min.
Tuesday, March 30, 2021, 12:12: Auto-ramping TGHT / TBHT to 350 / 125 A @ 2 A per min.
Tuesday, March 30, 2021, 13:50: Vacuum @ 4.66e-06T. Auto-ramping TGHT / TBHT to 450 / 150 A @ 2 A per min.
Tuesday, March 30, 2021, 21:59: Vacuum @ 5.01e-06T. TGHT / TBHT @ 393 / 150 A. Reset Auto-ramping TGHT / TBHT to 550 / 200 A @ 2 A per min.
Wednesday, March 31, 2021, 11:46: IV4 opened. Optics & HV power switched on.
Wednesday, March 31, 2021, 11:52: HV check ok. Optics reset. BIAS / EE / EZL @ 1 / 0.1 / 1 kV. Coil @ 4 A. Anode @ 100 V
Wednesday, March 31, 2021, 11:54: Optics remain on. HV & coil back to 0. Ready to run once the Vacuum returns to a reasonable level. Vacuum @ 5.45e-06T.
Wednesday, March 31, 2021, 15:05: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min. |
Monday, June 15, 2015, 14:07, Anders Mjos, , , , , , , Problems/Solutions, Test Stand Source Tray installed
|
Monday, June 15, 2015
Remaining items to do
- ANODE wire not yet attached
- FEBIAD COILS not yet reconfigured
Tuesday, June 16, 2015:
Coils reconfigured. See attached photo.
|
Tuesday, December 13, 2011, 14:10, Aurelia Laxdal, , , , , , , , Test Stand IOC reboot
|
Evgeniy rebooted the ISAC Test Stand IOC. Re-started EPICS at the Test Stand.
Found all 4 turbo pumps off and their backing valves closed. Re-started the pumps. |
Monday, May 14, 2012, 15:36, Aurelia Laxdal, , , , , , , , Test Stand - IOC reboot
|
Did a local IOC reboot to cure to white-out. The test stand is now operational. |
Tuesday, October 02, 2018, 13:39, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps w/ stoppage
|
Silver bolts used on Coil, TGHT, & TBHT.
End caps in target
Tuesday, October 02, 2018, 13:36: Roughing.
Tuesday, October 02, 2018, 13:37: Doors sealed.
Tuesday, October 02, 2018, 14:10: Turbos on.
Due to potential power & cooling loss. Shutdown vac.
Wednesday, October 03, 2018, 07:34: Chamber Turbos off.
Wednesday, October 03, 2018, 10:58: Beam line Turbos off. Closed both PV1 & PV2 & turned off both roughing pumps.
Thursday, October 11, 2018, 10:37: RGA on. Strip tools re-opened.
Thursday, October 11, 2018, 10:43: Waterlines opened. No response on RGA. Vacuum stable @ 3.40e-07T.
Thursday, October 11, 2018, 10:48: Power on.
Thursday, October 11, 2018, 10:49: Opened manual valve in gas control to operate small pump. Vacuum spike into Xe-05T range.
Thursday, October 11, 2018, 10:51: Very gradual opening on source gas control. Pump ineffective.
Thursday, October 11, 2018, 10:52: SV5 not opened yet. Open SV2. Vacuum spike noted.
Thursday, October 11, 2018, 10:53: SV5 opened/closed very quickly. Allow stabilization. Alternate between SV5 & SV2 until stable.
Thursday, October 11, 2018, 10:58: SV5 closed. Open SV4. Vacuum spike noted up to 3.3e-05T.
Thursday, October 11, 2018, 11:30: All Gas lines opened.
Thursday, October 11, 2018, 11:36: Sources on.
Thursday, October 11, 2018, 11:43: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Thursday, October 11, 2018, 11:46: IV4 opened. Error / closed / red. Fix. IV4 re-opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.9 |
3.96 |
TBHT |
21.7 |
3.09 |
COIL + EE |
22.0 |
5.15 |
TGHT |
22.2 |
5.83 |
Thursday, October 11, 2018, 12:08: Auto-ramping TGHT / TBHT to 300 / 200 A @ 2A per min
Friday, October 12, 2018, 08:07: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Friday, October 12, 2018, 08:13: Optics reset.Can Diagnostics re-cfg.
Friday, October 12, 2018, 10:49: Anode @ 200 V.
Friday, October 12, 2018, 10:50: Coil @ 10 A. Vacuum @ 6.25e-07T
Friday, October 12, 2018, 10:53: Coil @ 20 A. Vacuum @ 6.27e-07T
Friday, October 12, 2018, 10:56: Coil @ 30 A. Vacuum @ 6.27e-07T
Friday, October 12, 2018, 10:58: Coil @ 40 A. Vacuum @ 6.34e-07T
Friday, October 12, 2018, 11:00: Coil @ 50 A. Vacuum @ 6.34e-07T
Friday, October 12, 2018, 11:01: Auto-ramping TBHT to 300 A @ 2A per min.
Friday, October 12, 2018, 11:06: TBHT @ 300 A.
Friday, October 12, 2018, 11:51: Nothing found on Mass or wire scans?
Friday, October 12, 2018, 11:52: Anode set to 0 V.
Friday, October 12, 2018, 11:54: Still nothing found on wire scans.
Fernando:
Friday, October 12, 2018, 12:56: Anode leakage current is 6.105 mA on the readback with AV@200V Coil@0A TGHT@580A TBHT@310
Friday, October 12, 2018, 12:59 : This is very low anode lakage current. It should be on the bulk of 100 mA.
Friday, October 12, 2018, 12:59: Ramping up TBHT to 320 A @ 2A per min while keeping the AV@200 V. STOP
Aaron: Anode / Cathode BIAS PS polarity requires a reversal. John Chow notified. To be reversed Monday after 11am.
Friday, October 12, 2018, 13:24: Continue auto-ramping TBHT to 320 A @ 2A per min.
Friday, October 12, 2018, 13:30: TBHT 320 A / Read back @ 313.1 A.
Friday, October 12, 2018, 13:34: Wire & mass scans
Friday, October 12, 2018, 13:54: Anode to 0 V. Coil to 50 A.
Monday, October 15, 2018, 07:14: Auto-cooling. Coil to 0 A.
Monday, October 15, 2018, 11:54: Sources/power off. IV4 closed |
Monday, October 22, 2018, 11:07, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps
|
Restarted post power outage.
Water & Turbos on.
Monday, October 22, 2018, 10:55: Power / sources on. MB1?
Monday, October 22, 2018, 11:07: Open gas lines slowly.
Monday, October 22, 2018, 11:11: Gas lines all opened. Vacuum @ 2.37e-06T & decreasing.
Tuesday, October 23, 2018, 08:00: MB1 PS on.
Tuesday, October 23, 2018, 08:03: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Tuesday, October 23, 2018, 08:08: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.
Tuesday, October 23, 2018, 08:10: Epics lost. Communication error. Internet loss.
Tuesday, October 23, 2018, 08:21: Auto ramp found halted in communication loss. Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min restarted from 14.0A.
Tuesday, October 23, 2018, 08:23: Anode @ 200 V.
Tuesday, October 23, 2018, 08:28: Optics set. IV4 opened.
Tuesday, October 23, 2018, 13:03: Auto-ramping TBHT / 320 A @ 2A per min.
Tuesday, October 23, 2018, 14:00: Coil @ 50 A. TBHT @ 330 A.
Tuesday, October 23, 2018, 14:30: Mass scans ok. TBHT back @ 320.
Emittance rig not calibrating?
Wednesday, October 24, 2018, 08:17 : E-rig drive motor PS re-plugged in. Switched on. E-rig calibrated & ready.
FM:
Wednesday, October 24, 2018, 12:40 : Vacuum 6.52e-7T. Auto-ramping TBHT to 320 A @ 2A per min.
Wednesday, October 24, 2018, 13:02 : Auto-ramping finished. Anode Current@8.54mA. Vaccum ok @ 6.86E-7T
Wednesday, October 24, 2018, 13:40 : Vacuum 6.58e-7T. Auto-ramping TBHT to 340 A @ 2A per min.
Wednesday, October 24, 2018, 13:55 : Auto-ramping finished. Anode Current@19.53mA. Vaccum ok @ 6.67E-7T
Wednesday, October 24, 2018, 15:18 : Vacuum 6.68e-7T. Auto-ramping TBHT to 350 A @ 2A per min.
Wednesday, October 24, 2018, 15:27: Auto-ramping finished. Anode Current@41.51mA. Vaccum ok @ 6.82E-7T
Thursday, October 25, 2018, 08:27: IG6 Tripped off around 3am this morning. Attempts to restart, unsuccessful.
Thursday, October 25, 2018, 08:29: IV4 Closed. Vacuum group notified..
Thursday, October 25, 2018, 08:40: Filament burnt out. Vac group switched on IG6 secondary filament.
Thursday, October 25, 2018, 08:44: IV4 re-opened. Optics reset.
Friday, October 26, 2018, 13:49: Auto-ramping TBHT / 360 A @ 1A per min.
Friday, October 26, 2018, 14:08:
TBHT @ 359.0 A / 3.074 V.
Anode @ 200 V / 94.017 - 95.238 mA.
Friday, October 26, 2018, 14:34: Mass & wire scans complete w/ screen shots on the word doc (FEBIAD COIL TEST 6-3 Caps in).
Sunday, October 28, 2018, 13:19: Remotely connect to check the status. Something happened around midnight. See attached screenshots.
It seems there is no bias. EPICS control whiteout. Not sure how to proceed. Leaving evreything as is. |
Monday, October 15, 2018, 14:23, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps
|
Anode / Cathode BIAS PS polarity reversed by John Chow. PS: Negative
Monday, October 15, 2018, 14:12: Power/sources on
Monday, October 15, 2018, 14:17: RGA on.
Monday, October 15, 2018, 14:22: Gas-lines opened. Vacuum ok @ 4.38e-07T
Monday, October 15, 2018, 14:29: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Monday, October 15, 2018, 14:30: Optics on
Monday, October 15, 2018, 14:33: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Monday, October 15, 2018, 14:35: Anode @ 200 V.
Monday, October 15, 2018, 14:36: IV4 Open.
Tuesday, October 16, 2018, 06:33: Auto-ramping TBHT to 320 A @ 2A per min.
Tuesday, October 16, 2018, 07:15: Coil @ 50 A.
Tuesday, October 16, 2018, 14:40: FC6 Auto range & Polarity set. Mass scans work now.
FM
Wednesday, October 17, 2018, 10:02 : Auto-ramping TBHT to 330 A @ 2A per min.
Wednesday, October 17, 2018, 13:21: Auto-ramping TBHT to 340 A @ 2A per min.
Wednesday, October 17, 2018, 13:45: Increasing TBHT voltage from 3.001 to 3.5 to avoid voltage limitation when increasing the current
Wednesday, October 17, 2018, 13:48: Auto-ramping TBHT to 345 A @ 2A per min.
Wednesday, October 17, 2018, 13:54: FC0 start decreasing once the ramp up finished. Vacuum ok @ 5.17e-7T.
Wednesday, October 17, 2018, 17:16: FC0 stable. Probably outgassing. Vacuum ok @ 5.37e-T
Wednesday, October 17, 2018, 17:16: Auto-ramping TBHT to 350 A @ 2A per min.
Wednesday, October 17, 2018, 17:30: Ramping finished. FC0 decreasing again. Vacuum ok @5.57e-7T
Wednesday, October 17, 2018, 17:51: Potassium signal seems to be decreasing and now the Argon is slightly higher than Potassium.
Wednesday, October 17, 2018, 17:51: Mass optimized for 40Ar, which is shown in the mass scan as ~39.52. Dipole current=102.2736 A
Wednesday, October 17, 2018, 17:52: Starting steerers an einzel lense tuning to increase FC6 signal. Will continue tomorrow
FM
Thursday, October 18, 2018, 08:03: FC0 signal is stable now. Auto-ramping TBHT to 355 A @ 2A per min.
Thursday, October 18, 2018, 08:08 Ramping finished. Vacuum ok @5.26e-7T. Anode current=65 mA.
Thursday, October 18, 2018, 09:55: FC0 looks stable now. Manually tapping 2 A to have TBHT=357A.
Thursday, October 18, 2018, 11:40: Vaccum ok @ 4.56e-7T
Thursday, October 18, 2018, 16:25: Vacuum ok @ 5.28e-7T
Thursday, October 18, 2018, 16:26: Manually tapping 2 A to have TBHT=359A.
Thursday, October 18, 2018, 17:29: Steerers, einzel lens and dipole tune to increase signal on FC6. Argon current=4 nA. Total source current=54 nA.
Thursday, October 18, 2018, 17:37: Coil to 50A.
Thursday, October 18, 2018, 17:47: Closing Neon valve.
Thursday, October 18, 2018, 17:57: Closing Argon valve.
Thursday, October 18, 2018, 19:51: Assuming 720 nA entering the source (from Brad). Efficiency measurement = 0.44%
Thursday, October 18, 2018, 19:52: Opening valves.
Thursday, October 18, 2018, 19:54: Vaccum ok @ 5.46e-7T
FM
Friday, October 19, 2018, 08:27: Manually tapping 1 A to have TBHT=360.
Friday, October 19, 2018, 08:39: FC6 is stable. Closing Neon Valve.
Friday, October 19, 2018, 08:44: FC6 is stable. Closing Argon Valve.
Friday, October 19, 2018, 09:13: TBHT@360A, AV=150V. Efficiency measurement = 0.41%
Friday, October 19, 2018, 09:16: Opening the valves.
Friday, October 19, 2018, 09:40: FC6 stable. Carefully increasing AV (anode voltage) to 200V keeping an eye on the AC (anode current). |
Monday, October 29, 2018, 11:03, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, Done, Test FEBIAD w/ Silver bolts & sealed end caps
|
Restarting FEBIAD
Monday, October 29, 2018, 10:56: Restart roughing & Turbo pumps.
Monday, October 29, 2018, 11:03: Ion gauges on.
Monday, October 29, 2018, 11:10: Power on
Monday, October 29, 2018, 11:12: Gas lines opened to pump down with TS. Vacuum @ 1.20e-05T.
Monday, October 29, 2018, 11:20: RGA restarted.
Tuesday, October 30, 2018, 07:24: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V.
Tuesday, October 30, 2018, 07:26: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.
Tuesday, October 30, 2018, 07:31: Optics set.
Tuesday, October 30, 2018, 07:32 : IV4 Opened.
Tuesday, October 30, 2018, 08:50: Auto ramping aborted. While the source does increment, the actual power supply does not. It's not actually ramping.
Tuesday, October 30, 2018, 08:51: Unable to bump up the coil either. Tapping down the all the voltage to 0.
Tuesday, October 30, 2018, 08:55: IV4 closed. Gases closed.
Tuesday, October 30, 2018, 08:57: Power shut off & restarted.
Tuesday, October 30, 2018, 09:01: Gases re-opened.
Tuesday, October 30, 2018, 09:03: Sources switched on. Manually bumped up TGHT & TBHT. No response.
Tuesday, October 30, 2018, 09:04: Gases closed. Sources off.
Tuesday, October 30, 2018, 10:41: IV4 Opened.
Tuesday, October 30, 2018, 10:47: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. Voltage limits reset for the TGHT, TBHT, & Coil. Responses given
Tuesday, October 30, 2018, 10:49: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.
Tuesday, October 30, 2018, 10:55: Optics reset.
Tuesday, October 30, 2018, 11:01: Gases reopened. Vacuum @ 4.52e-07T.
Wednesday, October 31, 2018, 06:59: Auto-ramping TBHT to 330 A @ 2A per min.
Wednesday, October 31, 2018, 07:00: Coil @ 50 A.
Wednesday, October 31, 2018, 10:57 : Mass & wire scans appear ok.
FM:
Wednesday, October 31, 2018, 12:10 : Auto-ramping TBHT to 340 A @ 1A per min.
Wednesday, October 31, 2018, 12:49 : Vacuum @ 5.90e-07T.
Wednesday, October 31, 2018, 12:54 : Auto-ramping TBHT to 350 A @ 1A per min.
Wednesday, October 31, 2018, 15:25 : Vacuum @ 6.03E-7T.
Wednesday, October 31, 2018, 15:28 : Auto-ramping TBHT to 360 A @ 1A per min.
Wednesday, October 31, 2018, 15:34 : Changing Gain in FC0 from 33 nA to 100 nA
Wednesday, October 31, 2018, 15:42 : Increasing Gain in FC0 from 100 nA to 1 uA.
Voltage drop from 200 to 196 V. The anode is current limited. Increasing the current limit on the anode from 100 mA to 110 mA .
Voltage back to 200 V
FM
Thursday, November 01, 2018, 11:35 : Optics set to the previous tune. Check entry 688.
Anode set to 150 V. FC6 stable
Thursday, November 01, 2018, 11:37 Closing Neon Valve
Thursday, November 01, 2018, 12:38 : FC6 stable. Closing Argon valve.
Thursday, November 01, 2018, 13:05 : Assuming 720 nA entering the source (from Brad). Efficiency measurement = 0.96%. Almost a factor of two larger than previous measurement with the same conditions!
Thursday, November 01, 2018, 13:08 : Opening the valves
Thursday, November 01, 2018, 15:41 : FC6 stable 5.38e-9A. Closing neon valve.
Thursday, November 01, 2018, 16:50 : FC6 stable overall 5.33e-9A. Closing argon Valve
Thursday, November 01, 2018, 18:42 : FC6 stable 1.44e-10A. efficiency= 0.72%
Opening gas valves
FM
Friday, November 02, 2018, 09:39 : Increasing AV to 200V.
Friday, November 02, 2018, 09:47 : Increasing anode current to 150 mA.
Friday, November 02, 2018, 18:01 : Coil sweep from 0-80 A for AV=25,50 completed. Efficiencies of 0.035 % and 0.34% respectively.
Leaving the cathode hot to continue test tomorrow morning.
Saturday, November 03, 2018, 18:01: Coil sweep from 0-80 A for AV=75,100 completed. Efficiencies of 0.56 % and 0.77% respectively.
Sunday, November 04, 2018, 09:01 : Anode current increased from 56 to around 95 mA overnight under the same conditions. This could indicate a cleaner surface on the cathode and hence a better emission or, the anode cathode distance is reducing fue to the thermal expansion.
Cooling down manually TBHT to 300 A @ 2A per min.
Monday, November 05, 2018, 09:00: Short on TBHT appeared around 8 am. Investigate.
Monday, November 05, 2018, 09:15: Auto-cooling TGHT / TBHT @ 2 A per min.
Monday, November 05, 2018, 14:22: Gas lines closed.
Monday, November 05, 2018, 14:32: Sources/power off.
Monday, November 05, 2018, 14:40: Short confirmed up top. RGA off.
Monday, November 05, 2018, 14:43: IV4 closed/reset, Ion gauge off, Turbos off. |
Thursday, November 08, 2018, 10:54, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps
|
Silver bolts used on Coil, TGHT, & TBHT. Back panel opened for new gas bottles.
Thursday, November 08, 2018, 10:52: Roughing
Thursday, November 08, 2018, 10:53: Doors sealed.
Thursday, November 08, 2018, 14:10: Turbo pumps started.
Thursday, November 08, 2018, 14:15: Ion gauge on.
Thursday, November 08, 2018, 14:23: RGA on.
Friday, November 09, 2018, 07:38: Waterlines opened. No response on RGA. Vacuum ok @ 5.18e-07T
Friday, November 09, 2018, 07:44 : Slowly start opening gas lines. Opened / closed SV5 initially, no response. Note* Opened SV3 with SV5 closed. Massive spike seen in vacuum.
Friday, November 09, 2018, 07:55 : SV3 opened / closed in conjunction with SV5 until stable vacuum reached. Begin opening SV4 w/ SV5 closed.
Friday, November 09, 2018, 08:09 : SV3 & SV4 opened with SV5, Stable vacuum reached. Begin opening SV2/SV1 w/ SV5 closed.
Friday, November 09, 2018, 08:15: All gas lines opened. Sources on.
Friday, November 09, 2018, 08:22: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. IV4 opened. Optics switched on.
Friday, November 09, 2018, 08:40: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min. Loop to max values, increase of 0A until vacuum gets below 1.0e-06T. Vacuum 1.12e-06T.
Friday, November 09, 2018, 10:45: The vacuum wouldn't drop below 1.12e-06T. Ramping halted and gas lines closed. Vacuum dropped to 7.48e-07T. Gas lines opened again. Vacuum stable around 1.12e-06T. Significant Argon noted on RGA.
Friday, November 09, 2018, 10:52: Auto-ramping TGHT / TBHT to 450 / 200 A @ 2A per min. Vacuum increment limit increased to 2.0e-06T
Tuesday, November 13, 2018, 08:32: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Tuesday, November 13, 2018, 11:08: Mass scans ok. Auto-ramping TBHT to 330 A @ 2A per min.
FM
Tuesday, November 13, 2018, 16:44: The anode drain current has increased 17mA since 11:23 am, however FC0 is still decreasing. I will keep monitoring to see if the behaviour of the anode drain current continues once FC0 has stabilized. If the anode drain current keeps increasing maybe we will observe the same failure from the previous FEBIAD.
FM
Wednesday, November 14, 2018, 11:02 FC0 is stable but the anode drain current is still increasing and now is at 85 mA. It started at ~52mA. From the strip tool it seems to be a 2-hour period where the anode drain current is stable.
Wednesday, November 14, 2018, 16:14 : Magnet tune for 40Ar. TMS:MB1=101.56126 A
Coil=50 A. FC6=19.37 nA
Wednesday, November 14, 2018, 16:16 : Closing Neon valve.
Wednesday, November 14, 2018, 16:26 : FC6=13.77 nA.
Wednesday, November 14, 2018, 16:27: Closing Argon valve
Wednesday, November 14, 2018, 17:10: 0.119 nA.
Wednesday, November 14, 2018, 17:15 Assuming the 720 nA from Brad (I will recompute this value based on the new bottles). Efficiency with both gasses open= 2.67375% . Efficiecy with Argon bottle only=1.84%. Anode drain current~87.5mA
Wednesday, November 14, 2018, 17:53: When opening the Neon valve, the vacuum reached ~1e-5 T and the test stand tripped. Ion source off, high voltage and some of the optics as well. Leaving the test stand as is.
Wednesday, November 14, 2018, 17:58: Note to myself: How am i gonna take an efficiency measurement if every time I turned the gas valves the vacuum will increase to 1e-5 T.
Thursday, November 15, 2018, 08:33: Sources at zero. Bring values to 0 before restarting. Reset optics.
Thursday, November 15, 2018, 08:45: Power to sources off. Open the back & double check gas bottles. All are tight.
Thursday, November 15, 2018, 09:35: All gas bottles opened.
Thursday, November 15, 2018, 09:58: Power/sources reset/on.
Thursday, November 15, 2018, 10:04: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. IV4 opened.
Thursday, November 15, 2018, 10:05: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Thursday, November 15, 2018, 10:07: Optics reset.
FM
Thursday, November 15, 2018, 18:46: Coil to 50 A.
Friday, November 16, 2018, 08:40: Emittance Rig reset & calibrated.
FM
Friday, November 16, 2018, 11:30 : Auto-ramping TBHT to 310 A @ 1A per min.
Friday, November 16, 2018, 16:28 Friday, November 16, 2018, 16:28 : Gain in FC0 seems off. Reading on FC0 was 2.8e-8A but reading on FC6 was 4.5e-8A. In the last mass scan, I add up the highest peaks above 1e-9A and the values was roughly 7e-8A. Switching the gain to 94uA in FCO shows 8.32e-8 A. This seems a better reading than before.
Friday, November 16, 2018, 16:30 Changing gacin on FC0 from 1 uA to 94 uA.
FM
Monday, November 19, 2018, 09:34 : Scanning from 0-450 V and recording Anode drain current.
IG1 reading is 3.01e-6 T.
Monday, November 19, 2018, 10:01 : When Moving away FC0, the optics goes yellow. Not sure which interlock is activated.
AS
Optics tripped during FC0 removal. Vacuum spikes also detected on IG1 & IG6. No response on RGA.
Monday, November 19, 2018, 11:17: RGA providing no data. Stop, restart, multiple times.
Monday, November 19, 2018, 11:25: RGA shut down. No response from and attempt to restart.
Monday, November 19, 2018, 11:30: FC0 opened. Optics tripped. Vacuum increased on IG6 up to 7.9e-06T & IG1 increased to 4.4e-06T. Shut again to avoid tripping the entire system as the vacuum climbed.
Monday, November 19, 2018, 11:34: Auto-cooling @ 2A per min. Ramp down & trouble shoot after.
Monday, November 19, 2018, 14:11: Tap down HV on sources to 0V. Close & reset IV4. After closing IV4, spike in Vacuum on IG6 noted. Drop in vacuum on IG1 noted. |
Tuesday, February 28, 2012, 10:29, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Test FEBIAD at ISAC test statnd
|
|
Saturday, August 11, 2012, 16:18, Pierre Bricault, , , , , , , , Test FEBIAD anode biased at 120 V
|
The ramp up finished.
I have 3.35E-6 Amp out of the source on FC0.
Vacuum 4.3 E-7 T increase Coil current to 40 A. No effect on vac.
Increase coil to 50 A. Vacuum still good.
I will continue from home.. |
Saturday, August 11, 2012, 13:34, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, In progress, Test FEBIAD anode bias 120 V
|
|
Monday, June 22, 2020, 07:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Test FEBIAD (Fernando)
|
Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!
Monday, June 22, 2020, 08:45: Roughing.
Monday, June 22, 2020, 09:17: Turbo pumps on.
Monday, June 22, 2020, 09:22: Ion gauge on.
Tuesday, June 23, 2020, 07:37: Waterlines opened. Vacuum ok @ 1.60e-06T. Power / Sources on.
Tuesday, June 23, 2020, 07:45: Turned on "mini-pump" Open SV1.
Tuesday, June 23, 2020, 08:01: Open SV3 & SV4. (NOTE* Do not Open SV2).
Tuesday, June 23, 2020, 08:14: Close SV1. Turn off "Mini pump". Slowly open and close SV5. Unplug mini-pump.
Open w/ SV3 & SV4.
Tuesday, June 23, 2020, 08:16: SV5 left open w/ SV3 & SV4. Vacuum Stabilizing @ 2.32e-06T & dropping.
Tuesday, June 23, 2020, 08:20: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4 A per min. Coil @ 20 A. IV4 open
Tuesday, June 23, 2020, 08:28: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 50 V.
Tuesday, June 23, 2020, 08:29: Optics on.
Tuesday, June 23, 2020, 09:59: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.
Tuesday, June 23, 2020, 12:59: Coil @ 50 A. Anode @ 100 vV. Vacuum @ 3.71e-06T
Tuesday, June 23, 2020, 13:10: Auto-ramping TBHT to 280 A @ 2 A per min.
Tuesday, June 23, 2020, 13:36: Mass, wire, & Emittance scans taken.
|
Tuesday, April 05, 2022, 14:01, Aaron Schmidt, Test FEBIAD TM2-2022, LP-FEBIAD, ITW, TM2, , 42752-5, , Test FEBIAD & TS operation
|
Tuesday, April 05, 2022, 13:57: Roughing. BV1B.
Tuesday, April 05, 2022, 14:04: BV1A on.
Tuesday, April 05, 2022, 14:28: TP1B on.
Tuesday, April 05, 2022, 14:36: TP1A on.
Tuesday, April 05, 2022, 14:46: IG1 on.
Wednesday, April 06, 2022, 07:42: Vacuum @ 2.50e-06T.
Wednesday, April 06, 2022, 07:44: Waterlines opened. Vacuum Remains stable.
Wednesday, April 06, 2022, 07:59: Cage fully closed up. Power/sources on.
Wednesday, April 06, 2022, 08:00: COIL / TGHT / TBHT @ 10 A manually. Check - Ok.
Wednesday, April 06, 2022, 08:02: Anode @ 50V - Ok.
Wednesday, April 06, 2022, 08:04: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Check - Ok.
Wednesday, April 06, 2022, 08:10: BIAS / EE / EZL @ 10 / -1 / 10 kV.
Wednesday, April 06, 2022, 08:16: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Ok. Vacuum @ 2.39e-06T.
Wednesday, April 06, 2022, 08:46: 1/2 hour. Stable.
Wednesday, April 06, 2022, 08:50: All sources off. PS off. Open Cage.
Wednesday, April 06, 2022, 08:54: Begin cycling source gas control.
Wednesday, April 06, 2022, 08:57: SV5 open.
Wednesday, April 06, 2022, 08:58: SV3 & SV4 open. Vacuum stable @2.32e-06T.
Wednesday, April 06, 2022, 09:02: Cage closed. Sources / PS on. IV4 open.
Wednesday, April 06, 2022, 09:04: Auto-ramping TGHT / TBHT to 350 / 150 @ 2 A per min.
Wednesday, April 06, 2022, 09:05: Anode @ 50 V. Coil @ 10 A.
Wednesday, April 06, 2022, 09:10: Optics set.
Wednesday, April 06, 2022, 11:37: Gas lines closed. Abort ramping. TGHT / TBHT @ 306 / 150 A. HV lockout. Open cage.
***Gas bottles are not in the old configuration*** No gas.
Wednesday, April 06, 2022, 11:50: Begin Auto-cooling @ 2 A per min.
Thursday, April 07, 2022, 08:13: IG1 off. Turbo pumps off. Power off.
Thursday, April 07, 2022, 09:17: Venting.
|
Wednesday, March 21, 2018, 14:11, Fernando Maldonado, , LP-FEBIAD, , , 395530-3, 42752-2, In progress, Test FEBIAD 10x
|
Tests on coil, temperature and the use of silver bolts.
(3) Vented silver bolts on the TBHT and (2) Full silver bolts on the coil
Wednesday, March 21, 2018, 14:10: Roughing.
Wednesday, March 21, 2018, 14:30: Turbo pumps on.
Wednesday, March 21, 2018, 14:35: Ion gauge on.
Wednesday, March 21, 2018, 14:42: RGA on.
Thursday, March 22, 2018, 06:52: Waterlines opened: Vacuum stable @ 3.04e-07T
Thursday, March 22, 2018, 06:53: Power/sources on.
Thursday, March 22, 2018, 06:56: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.9 |
3.61 |
TBHT |
21.6 |
2.80 |
COIL + EE |
21.7 |
4.59 |
TGHT |
22.0 |
5.23 |
Thursday, March 22, 2018, 07:00: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Thursday, March 22, 2018, 07:04 : BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Thursday, March 22, 2018, 07:05: Optics on.
Thursday, March 22, 2018, 11:32: Out gassing noted. TBHT @ 200 A . TGHT @ 472 A. Ramping rate slowed automatically. Vacuum @ 3.03e-06T.
Thursday, March 22, 2018, 14:42: Out gassing continued. TGHT @ 570A. Auto ramping TGHT / TBHT to 580 / 250 A @ undefined rate according to vacuum. Vacuum @ 3.03e-06T
Friday, March 23, 2018, 08:11: Auto ramping TBHT from 250 A to 290 A @ 2A per min. TGHT @ 580 A.
Friday, March 23, 2018, 10:20: Anode @ 100V & 8.5mA.
Friday, March 23, 2018, 10:28: Coil @ 50 A
Friday, March 23, 2018, 10:34: Anode @ 200V & 11 mA.
Friday, March 23, 2018, 13:08: RGA froze. Restart RGA
Sunday, March 25, 2018, 20:34 Vacuum stable @ 4.3e-07T .
Sunday, March 25, 2018, 20:34: TBHT @ 290 A. TGHT @ 580 A.
Sunday, March 25, 2018, 20:34 : Coil @ 50 A ^ 0.5 V
Sunday, March 25, 2018, 20:34 : Increasing Coil to 60 A
Sunday, March 25, 2018, 20:43: Vacuum seemed to increase to 4.4e-07T.
Monday, March 26, 2018, 06:45: Optics on. Vacuum stable @ 4.38e-07T
Fernando
Wednesday, March 28, 2018, 08:31: Optics on. Vacuum stable @ 3.57e-7T
Wednesday, March 28, 2018, 16:2: After increasing the coil current to to 75, A the coil voltage started to show an oscillating behaviour. (see image ttached)
When increased to 80 A the oscillatory behaviour increases. Reducing the current to 65A and then increasing it to 70 A showed a steady behaviour
Thursday, March 29, 2018, 15:51: Ramping down EZL, BIAS, and TGHT for the long weekend
Tuesday, April 03, 2018, 09:14: Vaccum at 1.77e-7T
Tuesday, April 03, 2018, 09:14 : Auto ramping TGHT / TBHT to 550/ 250A @ 2A per min.
Tuesday, April 03, 2018, 09:18 : BIAS / EZL / EE @ 30 / 13 / 1.5 kV
Tuesday, April 03, 2018, 09:23 : Optics on
Wednesday, April 04, 2018, 08:39: Ramping TBHT to 290A @ 2A per min. TGHT remains @ 550 A
Friday, April 6, 2018, afternoon: Due to inconsistencies on EPICS, Carla and I Change the Anode power supply to local in order to monitor the leakage current with a multimeter.
Monday, April 9, 2018, afternoon: TBHT@350A and TGHT@550A
PS went current limited at AnodeBias=300V and show 3A on the PS Screen, the multimeter read the same.
Ramp down to 0 V 0A on PS. PS shows 0.01V
PS goes to limited current even at 2V.
Tuesday, April 10, 2018, 09:10: Problem persists even at lower TBHG (330A).
The output cable was removed and the power power supply seemed to behave better. This could mean that there is a short inside the unit, in the past the anode cable had melted into the cup.
Planning to ramp down the TBHT and see if the behaviour remains. If it does, I would ask to remove the unit for inspection.
Tuesday, April 10, 2018, 09:32 : Ramping down TBHTH to 250A
Tuesday, April 10, 2018, 13:07 : Same behaviour. Cooling procedure started to see if the issue is still present, anf if it does remove unit for inspection
Wednesday, April 11, 2018, 06:44: RGA, power/sources confirmed off. IV4 closed. Ion gauge & turbos off.
Wednesday, April 18, 2018, 13:00: Post use comparison of the coil - A.S
1) Used coil from this FEBIAD = 1.999mΩ ***
2) Unused coil A = 2.421mΩ
3) unused coil B = 2.451mΩ |
Thursday, August 09, 2012, 13:08, Pierre Bricault, , , , , , , , Test FEBIAD
|
Waiting Rick for the fitting on the vacuum pump. |
Sunday, August 12, 2012, 21:50, Pierre Bricault, , , , , , , In progress, Test FEBIAD
|
Lost communication with EPICS. Came in reset the ...
So far no luck.
|
Thursday, August 16, 2012, 10:41, Pierre Bricault, , , , , , , In progress, Test FEBIAD
|
Ray is finishing the electrical modifications for the FEBIAD with the biased cathode.
We found the source of the sparks. The disconnected target heater cables were resting on the Einzel lens cap.
|
Tuesday, April 17, 2018, 09:59, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, , , Test FEBIAD
|
New assembly & target. Same silver bolts.
Tuesday, April 17, 2018, 09:56: Roughing.
Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.
See* elog entry for roughing pump issue 04/17/2018
Wednesday, April 18, 2018, 08:57: Turbo pumps on.
Friday, April 20, 2018, 13:45: Power/sources on. RGA restarted
Friday, April 20, 2018, 13:46: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.1 |
3.61 |
TBHT |
24.2 |
2.80 |
COIL + EE |
23.9 |
5.06 |
TGHT |
24.1 |
5.72 |
Friday, April 20, 2018, 13:50: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Friday, April 20, 2018, 13:56: BIAS / EZL / EE @ 30 / 13 / 1.5 kV . Spark @ Bias 28 kV knocked out RGA.
Friday, April 20, 2018, 13:59: RGA restarted.
Friday, April 20, 2018, 14:03: Optics on. Set
Friday, April 20, 2018, 14:40: Auto cooling TGHT / TBHT from 97 A @ 4A per min. Odd noise on (BIAS*) PS
Friday, April 20, 2018, 14:44: BIAS / EZL / EE @ 0 / 0 / 0 kV . Sources being turned off except TBHT and TGHT.
Monday, April 23, 2018, 10:46: FEBIAD TEST halted. See BIAS PS issue.
Tuesday, April 24, 2018, 10:46: Power off.
Tuesday, April 24, 2018, 10:48: RGA off.
Tuesday, April 24, 2018, 10:49: Ion gauge TSG:IG1 & Evap side turbos off,
Tuesday, April 24, 2018, 10:50: Ion gauge TMS:IG6 & beam side turbos off.
Tuesday, April 24, 2018, 10:54: Waterlines purged.
|
Thursday, April 07, 2022, 11:19, Aaron Schmidt, Test FEBIAD TM2-2022, , ITW, TM2, , 42752-5, , Test FEBAID & TS operation
|
Gas system switched on manually to use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25: Roughing.
Thursday, April 07, 2022, 11:17: TP1B on.
Thursday, April 07, 2022, 12:55: TP1A on.
Thursday, April 07, 2022, 14:42: SV5 on. Power / sources on.
Thursday, April 07, 2022, 14:44: IV4 open. Optics on. Vacuum @ 2.7e-06T.
Thursday, April 07, 2022, 14:47: System check:
TGHT / TBHT @ 10 A. Coil @ 10A.
BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Anode @ 50V
OK. Set.
Thursday, April 07, 2022, 14:49: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Thursday, April 07, 2022, 14:51: BIAS / EE / EZL @ 0 kV. Anode @ 0V
Friday, April 08, 2022, 05:44: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min.
Friday, April 08, 2022, 05:51: BIAS / EE / EZL @ 20 / -1.0 / 7.5 kV.
Coil @ 20 A, Anode @ 100 V.
Friday, April 08, 2022, 10:01: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.
BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Friday, April 08, 2022, 11:15: TBHT @ 290 A.
Friday, April 08, 2022, 12:09: Mass & wire scans complete. HV to 0kV. Anode to to V. Auto cooling @ 1 A per min. Coil @ 0 A.
Monday, April 11, 2022, 07:25: Auto-ramping TGHT /TBHT to 580 / 290 A @ 2 A per min.
Monday, April 11, 2022, 13:48: BIAS / EE / EZL 30 / -1.5 / 13 kV. Mass & wire scans started.
Wire scans good.
Monday, April 11, 2022, 13:58: Controller for TP6 is dead. Literally smokes if you try to use it.
Monday, April 11, 2022, 14:05: HV to 0 kV / Off. IV4 closed. Anode & Coil to 0.
Tuesday, April 12, 2022, 07:14: Vacuum instability noted. 2 spikes to 4.6e-06T. Back to 2.48e-06T. BIAS / EE / EZL 30 / -1.5 / 13 kV. IV4 opened. Coil to 10 A. Anode to 100 V Optics standard tune set.
Mass & wire scans started.
Tuesday, April 12, 2022, 08:16: FM tune used. Mass & wire scans ok. Minor vacuum instability continues. Begin auto-cooling @ 2 A per min.
Tuesday, April 12, 2022, 08:27: Coil, Anode off. HV off. Closed SV5. Closed IV4
|
|