Thursday, March 25, 2021, 08:11, Aaron Schmidt, , , , , , , , Test Stand Tripped. (Water leak)
|
|
Monday, June 15, 2015, 14:07, Anders Mjos, , , , , , , Problems/Solutions, Test Stand Source Tray installed
|
Monday, June 15, 2015
Remaining items to do
ANODE wire not yet attached
FEBIAD COILS not yet reconfigured
Tuesday, June 16, 2015: |
Tuesday, December 13, 2011, 14:10, Aurelia Laxdal, , , , , , , , Test Stand IOC reboot
|
Evgeniy rebooted the ISAC Test Stand IOC. Re-started EPICS at the Test Stand.
Found all 4 turbo pumps off and their backing valves closed. Re-started the pumps. |
Monday, May 14, 2012, 15:36, Aurelia Laxdal, , , , , , , , Test Stand - IOC reboot
|
Did a local IOC reboot to cure to white-out. The test stand is now operational. |
Tuesday, October 02, 2018, 13:39, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps w/ stoppage
|
Silver bolts used on Coil, TGHT, & TBHT.
End caps in target
Tuesday, October 02, 2018, 13:36: Roughing. |
Monday, October 22, 2018, 11:07, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps
|
Restarted post power outage.
Water & Turbos on.
Monday, October 22, 2018, 10:55: Power / sources on. MB1? |
Monday, October 15, 2018, 14:23, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps
|
Anode / Cathode BIAS PS polarity reversed by John Chow. PS: Negative
Monday, October 15, 2018, 14:12: Power/sources on
Monday, October 15, 2018, 14:17: RGA on. |
Monday, October 29, 2018, 11:03, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, Done, Test FEBIAD w/ Silver bolts & sealed end caps
|
Restarting FEBIAD
Monday, October 29, 2018, 10:56: Restart roughing & Turbo pumps.
Monday, October 29, 2018, 11:03: Ion gauges on. |
Thursday, November 08, 2018, 10:54, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps
|
Silver bolts used on Coil, TGHT, & TBHT. Back panel opened for new gas bottles.
Thursday, November 08, 2018, 10:52: Roughing
Thursday, November 08, 2018, 10:53: Doors sealed. |
Tuesday, February 28, 2012, 10:29, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Test FEBIAD at ISAC test statnd
|
|
Saturday, August 11, 2012, 16:18, Pierre Bricault, , , , , , , , Test FEBIAD anode biased at 120 V
|
The ramp up finished.
I have 3.35E-6 Amp out of the source on FC0.
Vacuum 4.3 E-7 T increase Coil current to 40 A. No effect on vac. |
Saturday, August 11, 2012, 13:34, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, In progress, Test FEBIAD anode bias 120 V
|
|
Monday, June 22, 2020, 07:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Test FEBIAD (Fernando)
|
Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!
Monday, June 22, 2020, 08:45: Roughing.
Monday, June 22, 2020, 09:17: Turbo pumps on. |
Tuesday, April 05, 2022, 14:01, Aaron Schmidt, Test FEBIAD TM2-2022, LP-FEBIAD, ITW, TM2, , 42752-5, , Test FEBIAD & TS operation
|
Tuesday, April 05, 2022, 13:57: Roughing. BV1B.
Tuesday, April 05, 2022, 14:04: BV1A on.
Tuesday, April 05, 2022, 14:28: TP1B on. |
Wednesday, March 21, 2018, 14:11, Fernando Maldonado, , LP-FEBIAD, , , 395530-3, 42752-2, In progress, Test FEBIAD 10x
|
Tests on coil, temperature and the use of silver bolts.
(3) Vented silver bolts on the TBHT and (2) Full silver bolts on the coil
Wednesday, March 21, 2018, 14:10: Roughing. |
Thursday, August 09, 2012, 13:08, Pierre Bricault, , , , , , , , Test FEBIAD
|
Waiting Rick for the fitting on the vacuum pump. |
Sunday, August 12, 2012, 21:50, Pierre Bricault, , , , , , , In progress, Test FEBIAD
|
Lost communication with EPICS. Came in reset the ...
So far no luck.
|
Thursday, August 16, 2012, 10:41, Pierre Bricault, , , , , , , In progress, Test FEBIAD
|
Ray is finishing the electrical modifications for the FEBIAD with the biased cathode.
We found the source of the sparks. The disconnected target heater cables were resting on the Einzel lens cap.
|
Tuesday, April 17, 2018, 09:59, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, , , Test FEBIAD
|
New assembly & target. Same silver bolts.
Tuesday, April 17, 2018, 09:56: Roughing.
Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed. |
Thursday, April 07, 2022, 11:19, Aaron Schmidt, Test FEBIAD TM2-2022, , ITW, TM2, , 42752-5, , Test FEBAID & TS operation
|
Gas system switched on manually to use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25: Roughing.
Thursday, April 07, 2022, 11:17: TP1B on. |
|