727
|
Monday, June 03, 2019, 14:13 |
Aaron Schmidt | | | | TM4 | 395530-3 | 42752-5 | Done | TMS:TP6 Turbo pump issue. (Ok now) | Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud
hum / buzz sound. The vacuum pressure is |
|
731
|
Tuesday, June 11, 2019, 14:33 |
Aaron Schmidt | Test FEBIAD | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | ISAC Source tray re-installed w/ optics tray. | Tuesday, June 11, 2019, 14:33: Roughing.
Wednesday, June 12, 2019,
08:18: Venting to install FEBIAD. |
|
543
|
Friday, September 30, 2016, 11:11 |
Aaron Schmidt | SiC#35 | HP-FEBIAD | ITW | TM2 | 39530-9 | 41120-8 | Done | Conditioning SiC#35 | Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01:
Roughing stopped. RP1 failure. Breaker tripped. |
6x |
330
|
Friday, August 30, 2013, 15:09 |
Anders Mjos | NiO#2 | HP-FEBIAD | ITE | TM3 | 39530-6 | 39069-4 | Done | Conditioning of NiO#2 | Friday, August 30, 2013, 15:09 : Turbos
stopped in preparation for installation.
Friday, August 30, 2013, 16:22: Venting |
|
333
|
Monday, September 16, 2013, 17:07 |
Anders Mjos | NiO#2 | HP-FEBIAD | ITE | TM3 | 39530-6 | 39069-4 | Done | Conditioning NiO#2 take 2 | The GE on the Source tray and EE on the
target was cleaned. The target will be conditioned
again to verify if sparking has been reduced. |
|
559
|
Wednesday, January 18, 2017, 09:23 |
Aaron Schmidt | Ta Test | LP-FEBIAD | | | 39530-3 | | In progress | Tri-Coil FEBIAD for testing | Wednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41:
Turbo pumps started. |
12x |
607
|
Friday, October 06, 2017, 12:14 |
Aaron Schmidt | SiC#37 | HP-FEBIAD | ITE | TM4 | 39530-10 | 41751-4 | In progress | Conditioning SiC#37 | NOTE* : The right coil terminal terminates
into the heat shield. DO NOT TURN ON COIL.
Friday, October 06, 2017, 12:12: |
9x |
610
|
Friday, October 13, 2017, 15:53 |
Aaron Schmidt | SiC#37 | HP-FEBIAD | ITE | TM4 | 39530-10 | 41751-4 | In progress | Conditioning SiC#37 (ii) | Previous short fixed. Grid clamp removed.
Grid tack welded.
Friday, October 13, 2017, 15:49: |
10x |
497
|
Friday, March 04, 2016, 14:23 |
Anders Mjos | Target tube only | LP-SIS | ITW | TM2 | 39459-2 | 41120-10 | In progress | Conditiong Heat Shield for UC#15 | Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos
started |
|
499
|
Wednesday, March 16, 2016, 09:59 |
Anders Mjos | Target tube only | | | TM1 | 39459-2 | 40898-2 | In progress | Conditiong Heat Shield for UC#15 | Back up heat shield for UC#15
Wednesday, March 16, 2016, 09:58:
Roughing |
|
337
|
Friday, September 27, 2013, 11:41 |
Anders Mjos | Ta#41 | HP-SIS | ITW | TM4 | 39069-5 | 38817-10 | Done | Ta#41 Conditioning | Friday, September 27, 2013, 11:41: Roughing
Friday, September 27, 2013, 12:08:
Turbos started |
|
402
|
Friday, August 29, 2014, 14:52 |
Anders Mjos | Ta#44 | HP-SIS | ITE | TM4 | 38817-9 | 40316-11 | Done | Conditioning Ta#44 | Friday, August 29, 2014, 14:51: Roughing
Friday, August 29, 2014, 15:11: Starting
turbos. |
|
446
|
Monday, May 25, 2015, 14:40 |
Anders Mjos | SiC#31 | HP-SIS | ITW | TM4 | 38817-7 | | In progress | SiC#31 Conditioning | Monday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos
started. |
|
431
|
Monday, March 16, 2015, 18:53 |
Anders Mjos | Ta#45 | HP-SIS | ITE | TM4 | 38817-5 | | In progress | Conditioning Ta#45 | Monday, March 16, 2015, 18:53: Started
turbos
Monday, March 16, 2015, 19:00: Turbos |
|
98
|
Thursday, May 17, 2012, 13:24 |
John Wong | SiC#27 | HP-SIS | ITE | TM4 | 38817-3 | | Problems/Solutions | Solid residues found on EE | Thursday, May 17, 2012, 13:15
After the test-stand, the EE was
removed for inspection. It was discovered |
|
649
|
Friday, March 16, 2018, 08:15 |
Aaron Schmidt | Nb#8 | HP-SIS | ITW | TM2 | 38817-2 | 42738-12 | In progress | Conditioning Nb#08 | Friday, March 16, 2018, 08:42: Roughing.
Friday, March 16, 2018, 10:34: Turbo
pumps started. |
6x |
3
|
Wednesday, September 14, 2011, 15:40 |
Anders Mjos | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | TaC#1 installed and pumping down. | Wednesday, September 14, 2011, 15:39: Vacuum
at 1.3e-5 torr
Thursday, September 15, 2011, 08:59: |
|
6
|
Friday, September 16, 2011, 12:39 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | HV conditioning | Started the HV conditioning: TSG:BIAS=30kV
and TSH:EE=-700V. |
|
7
|
Monday, September 19, 2011, 09:11 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | Started target and tube heaters. | Heaters conditioning went fine: 580A and
230A.
Did a mass scan: |
|
8
|
Tuesday, September 20, 2011, 19:00 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | Done | Finished testing TaC#1 | Tuesday, September 20, 2011:
Did another mass scan today at 5:40.
Saved as: plotdump-local-clean.txt Sept 20 |
|
|