|
ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
304
|
Tuesday, May 21, 2013, 19:38 |
Friedhelm Ames | | | | | | | Problems/Solutions | magnet power supply water leak | The cyclotron operators discovered a water
leak in the magnet power supply. The water
is valved off and the power is off. A fault |
|
|
303
|
Tuesday, May 21, 2013, 15:50 |
Rick Maharaj | CTL Febiad | | | | | | | Cooling Water Turned On | Cooling water turned on when vacuum reading
5.54e-06 T. Vacuum steadily increasing. Ion
gauge reading steadily decreasing now reading |
|
|
302
|
Tuesday, May 21, 2013, 15:14 |
Rick Maharaj | CTL Febiad | | | | | | | Turbos Started | Turbos started |
|
|
301
|
Tuesday, May 21, 2013, 14:58 |
Rick Maharaj | CTL Febiad | | | | | | | CTL Febiad Installed | Ceramic coated coil development target
removed. CTL Febiad target installed.
Roughing chamber. |
|
|
300
|
Tuesday, May 21, 2013, 10:09 |
Rick Maharaj | | | | | | | | Test stand Vented | Turbos stopped, waterlines flushed, chamber
vented |
|
|
299
|
Thursday, May 09, 2013, 15:28 |
Anders Mjos | | | | | | | Problems/Solutions | TSGRP1 showing signs of reduced performance | TSG:CG1A and TSG:CG1B shows an increase
in vacuum.
See attached archived data for details. |
|
|
298
|
Wednesday, May 08, 2013, 08:52 |
Anders Mjos | | | | | | | Problems/Solutions | TMS and TPS P/S problems | Wednesday, May 08, 2013, 08:52: TMS:CB5
found off this morning. Switched back on.
Wednesday, May 08, 2013, 12:14: Lost |
|
|
297
|
Friday, May 03, 2013, 14:32 |
Anders Mjos | | | | | | | Problems/Solutions | Cathode PS cable reconnected |
|
|
|
296
|
Thursday, April 25, 2013, 13:32 |
Anders Mjos | Empty | LP-FEBIAD | | | Tube Only | 38307-9 | In progress | FEBIAD Coil test | Same target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54:
Roughing |
|
|
295
|
Thursday, April 18, 2013, 13:50 |
Anders Mjos | Ta#40 | HP-SIS | ITE | TM4 | 38295-4 | | Done | Ta#40 stored under vacuum | Target installed at the Test Stand after
an inspection in the lab. EE was cleand.
All bolts torqued to 130 in lbs |
|
|
294
|
Tuesday, April 16, 2013, 08:59 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP2 found in timeout / fault state | Tuesday, April 16, 2013, 08:59
The turbo was found in fault state
this morning. Based on data from IG6 the |
|
|
293
|
Thursday, April 11, 2013, 08:49 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 Power Supply operational |
|
|
|
292
|
Wednesday, April 10, 2013, 12:14 |
Anders Mjos | Ta#40 | HP-SIS | ITE | TM4 | 38295-4 | | Done | Conditioning Ta#40 | Wednesday, April 10, 2013, 12:13:
Stopped turbos in preparation for venting
the chamber. |
|
|
291
|
Tuesday, April 09, 2013, 16:21 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak at MB1 Power Supply |
|
|
|
290
|
Tuesday, April 02, 2013, 15:19 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak at MB1 Power Supply | See
Cyclotron e-fault 6637
|
|
|
289
|
Thursday, March 28, 2013, 13:55 |
Anders Mjos | Empty | | | | | | In progress | Pumping down empty chamber | Thursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36:
Starting turbos (vacuum at ~0.100 T) |
|
|
288
|
Monday, March 25, 2013, 16:50 |
Sebastian Raeder | | | | | | | Problems/Solutions | RFQ powersupplies removed - Anode PS still connected to ground | The powersupplies added to the teststand
for operation of the IGLIS source have been
removed from the HV cage as well as the RFQ |
|
|
287
|
Monday, March 25, 2013, 11:39 |
Anders Mjos | Ta#39 | LP-SIS | ITW | TM1 | | | Done | Ta#39 commissioning | Target installed with 130 in lbs torque
on all bolts.
Monday, March 25, 2013, 11:36: Roughing |
|
|
286
|
Thursday, March 21, 2013, 15:05 |
Sebastian Raeder | SiC#28 | | ITE | TM4 | | | Done | 2nd heating of SiC#28 LP-RFQ - short resolved |
|
|
|
285
|
Tuesday, March 19, 2013, 19:13 |
Sebastian Raeder | | | | | | | Problems/Solutions | 9 Pin connector rewired to match wiring in TM4 | The 9 Pin connector was rewired in the
ISAC teststand to match the wiring in TM4
The wiring from the connection board |
|