Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 7 of 8  Not logged in ELOG logo
Entry  Monday, October 07, 2024, 13:16, Aaron Schmidt, Ta#68, HP-SIS, ITE, TM2, 45447-26, 45235-16, Ready, Ta#68 Target Description ITE-TM2-Ta#68-HP-SIS_Target_Loading_Data.pdf
 Ta#68 HP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.0254mm (0.0010") avg Measured. 
Entry  Wednesday, July 10, 2013, 18:41, John Wong, SiC#29, HP-FEBIAD-CTL, ITE, TM4, 38481-6, 39956-4, Spent, SiC#29 - Target description SiC#29_density_measurements_final.xlsx
Wednesday, July 10, 2013, 18:32 
SiC#29 HP-FEBIAD-CTL target description: 
Total SiC foils = 510 discs 
Entry  Tuesday, May 30, 2017, 15:15, Laura Lambert, SiC#36, HP-FEBIAD-CTL, , TM2, 41369-10, , Ready, SiC#36 target description SiC#36_Target_Description.JPG
 Tuesday, May 30, 2017, 15:12
See attachment for target description.

 
Entry  Friday, September 23, 2011, 17:03, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished 
Friday, September 23, 2011, 16:54:

    Cu-gaskets used for leak checking target had a leak rate of about  10-8  10-9 atm cc/sec. Replaced
with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
    The target can not hold high voltage when it is sitting
    Reply  Monday, October 17, 2011, 14:45, John Wong, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished EE_after_teststand.jpgSiC#26_specification.png


    
        
            Anders Mjos wrote:
        
        
            
            Friday, September 23, 2011, 16:54:
Entry  Thursday, October 11, 2012, 11:41, John Wong, NiO#1, HP-FEBIAD, ITE, TM4, 38481-7, 39069-1/10(lid), Spent, NiO target description  
(Should have posted this before my long vacation... Anyway, it's for documentation)
Thursday, October 11, 2012, 11:38
 
Entry  Tuesday, December 11, 2012, 15:44, Anders Mjos, SiC, HP-FEBIAD, ITW, TM4, na, na (old style fittings), Ready, Test target for the Conditioning Station 
 The target has been used for operator training previously at the ISAC Test Stand.

    9-pin connector was completed and grounded
    RH gripper arms added to the heat shield

Further documentation
on DocuShare
Entry  Friday, August 30, 2013, 14:45, John Wong, NiO#2, HP-FEBIAD, , , 39530-6, 39069-4, Spent, NiO target description 
Friday, August 30, 2013, 14:38 
NiO/Ni#2                                            
Average
Entry  Wednesday, April 30, 2014, 16:36, John Wong, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, , Spent, SiC#30 Target description  SiC#30_density_measurements.xlsx
Wednesday, April 30, 2014, 15:16
Note:
This target was built in 2011.  The endcaps were replaced after they got vaporized in Evap#1 during the sintering process, and the target
Entry  Thursday, September 24, 2015, 13:42, Laura Lambert, SiC#32, HP-FEBIAD, , , 39530-5, , Ready, SiC#32 target description elog_snapshot.JPG
 Thursday, September 24, 2015, 11:46
See attachment for target description.

 
Entry  Friday, October 07, 2016, 16:27, John Wong, SiC#35, HP-FEBIAD, , , 39530-9, , Ready, SiC35 Target description  SiC35_target_description.JPG
Friday, October 07, 2016, 16:28
See attachment for the target description

 
Entry  Wednesday, September 27, 2017, 09:14, Laura Lambert, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, , Ready, SiC#37 target description Target_Description.JPG
 Wednesday, September 27, 2017, 09:13
See attachment for target description.

 
Entry  Friday, October 11, 2019, 09:26, Darwin Ortiz Rosales, SiC#38, HP-FEBIAD, , TM2, 42464-4, , Ready, Target SiC#38 Description SiC#38.PNG
Friday, October 11, 2019, 09:25
See attached picture for description.
 
Entry  Friday, November 29, 2019, 10:53, Darwin Ortiz Rosales, SiC#39, HP-FEBIAD, , TM2, 42464-3, , Ready, Target SiC#39 Description SiC#39_description.PNGSiC39_SEM.pdf
Friday, December 06, 2019, 15:34
Added SEM images (see attachment#2) - JW

 
Entry  Wednesday, May 25, 2022, 10:15, Darwin Ortiz Rosales, SiC#42, HP-FEBIAD, , , 44692-9, , Ready, Target SiC#42 Description Description-SiC#42.png
Wednesday, May 25, 2022, 10:15 
Entry  Monday, June 20, 2022, 10:35, Darwin Ortiz Rosales, SiC#43, HP-FEBIAD, , , 42464-1, , Ready, Target SiC#43 Description 
Monday, June 20, 2022, 10:33 
Entry  Tuesday, August 16, 2022, 09:48, Darwin Ortiz Rosales, SiC#44, HP-FEBIAD, , , 37978-1, , Ready, Target SiC#44 Description 
Tuesday, August 16, 2022, 09:47 
Entry  Friday, June 14, 2024, 14:16, Darwin Ortiz Rosales, TiC#7, HP-FEBIAD, , , 45447-5, 45235-15, Ready, TiC#7_Description TiC#7.png
Please note that this target comes in a Graphite cartridge.
Entry  Tuesday, September 03, 2024, 16:11, Darwin Ortiz Rosales, TiC#8, HP-FEBIAD, , , 45447-2, , Ready, TiC#8_Description TiC#8_(2).png
This was back-up target
Entry  Friday, March 11, 2016, 10:18, Laura Lambert, Ta # 47, , ITE, TM4, , , Spent, Ta # 47 target desscription 
Friday, March 11, 2016, 10:13 
Ta#47 LP-SIS [new small center block] target description:
Total Ta foils = 470
ELOG V2.9.2-2455