Entry  Thursday, September 24, 2015, 13:42, Laura Lambert, SiC#32, HP-FEBIAD, , , 39530-5, , Ready, SiC#32 target description elog_snapshot.JPG
 Thursday, September 24, 2015, 11:46
See attachment for target description.

 
Entry  Wednesday, September 27, 2017, 09:14, Laura Lambert, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, , Ready, SiC#37 target description Target_Description.JPG
 Wednesday, September 27, 2017, 09:13
See attachment for target description.

 
Entry  Friday, June 06, 2014, 14:09, John Wong, UCx#9, LP-SIS, , , 39165-9, , Ready, UCx#9 - Target description  UCx#9_target_description_1.JPG
 Friday, June 06, 2014, 14:08
See attachment for the target description

 
Entry  Thursday, April 11, 2013, 14:30, John Wong, Ta#39, LP-SIS, ITW, TM1, 39165-7, , Spent, Ta#39 target description 
Ta#38 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
Entry  Wednesday, September 12, 2012, 01:53, John Wong, Nb#7, LP-SIS, , , 39165-6, , Spent, Nb#7 target description Nb#7_target_description.jpg
 Wednesday, September 12, 2012, 02:10
Nb#7 target description: 
Total Nb foils = 400 discs
Entry  Thursday, May 30, 2013, 16:58, John Wong, UCx#6, LP-SIS, , TM1, 39165-6, 39230-8, Spent, UCx#6 - target description  UCx#6_specifications.PNG
 Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment #1. 
The target is currently undergoing the final conditioning in the Evaporator#1.
Entry  Wednesday, August 29, 2012, 14:52, John Wong, UCx#5, LP-SIS, ITW, TM4, 39165-5, , Failed, UCx#5 target description  UCx#5_specifications.PNG
Wednesday, August 29, 2012, 14:50
UCx#5 target description, see attachment#1
The target is currently undergoing the final conditioning in the Evaporator #1. 
Entry  Friday, June 01, 2012, 11:43, John Wong, Ta#38, LP-SIS, ITW, TM1, 39165-2, 38633-2, Spent, Ta#38 target description Ta_38_EE_deposit.JPGTa#38_EE.PNGTa#38_CE.PNG
Ta#38 LP-SIS target description: 
Total Ta foils = 400
Foil thickness = 0.025mm
Entry  Tuesday, July 15, 2014, 11:01, Laura Lambert, UCx # 10, LP-SIS, ITE, TM4, 39165-10, , Ready, UCx#10 Target Description UCx_10_target_description.PNG
Tuesday, July 15, 2014, 10:58
See attachment for target description 
Entry  Thursday, September 25, 2014, 16:01, Laura Lambert, Ta#44, HP-SIS, ITE, TM4, 38817-9, 40316-11, Ready, Ta#44 target description 
Thursday, September 25, 2014, 15:59
Ta#44 HP-SIS target description:
Total Ta foils = 400
Entry  Monday, March 31, 2014, 15:02, John Wong, TiC#4, HP-SIS, , , 38817-8, 39956-10, Spent, Target Description  TiC#4_description.JPG
 Monday, March 31, 2014, 15:00
Target consists of 360 discs of TiC + graphite foils. 
Total length = 11.7cm 
Entry  Wednesday, April 29, 2015, 15:39, Laura Lambert, SiC#31, HP-SIS, , , 38817-7, , Ready, SiC#31 Target description final_density_measurements.JPGdensity_measurements.xlsxSiC_density_Jan_10_'14_cast_-_Copy.xlsxSiC_density_Oct_31_'14_cast.xlsx
 Wednesday, April 29, 2015, 15:30
SiC#31 HP-SIS target description: 
Total SiC foils = 520 discs 
Entry  Wednesday, April 01, 2015, 11:27, Laura Lambert, Ta # 45, HP-SIS, , , 38817-5, , In Use, Ta#45 target description 
 Wednesday, April 01, 2015, 11:25
Ta#45 HP-SIS target description:
Total Ta foils = 400
Entry  Thursday, May 24, 2012, 11:04, John Wong, SiC#27, HP-SIS, ITE, TM4, 38817-3, 39069-2, Spent, HP-SIS SiC27 target description SiC#27_specification.png
 Thursday, May 24, 2012, 10:34
SiC#27- HPSIS target description: 
Total SiC foils = 240 discs
Entry  Wednesday, July 06, 2011, 14:29, John Wong, Nb/Spare, HP-SIS, , , 38817-2, , In progress, Target ready for Assembly 
Target oven w.o# 38817-2:
inner diameter: left = 18.29mm, right = 18.16mm.
Filled with 400 foils Nb (16pk, 5 foils/pk).  
Entry  Friday, October 25, 2013, 17:35, John Wong, Ta#41, HP-SIS, ITW, TM4, 38817-10, , Spent, Ta#41 target description 
Friday, October 25, 2013, 17:35
Ta#41 HP-SIS target description:
Total Ta foils = 400
Entry  Thursday, June 16, 2011, 17:26, John Wong, Nb, HP-SIS, , , 38817-1, , Spent, Target is ready and stored in cabinet  
 Thu Jun 16 17:21:10 2011
Two targets of Nb-HP-SIS are complete and ready to be installed in the heat shields:
-----------------------------------------------------------------------------------
Entry  Friday, July 20, 2012, 11:39, John Wong, UCx#4, LP-SIS, ITW, TM1, 38634-9, 36833-4, Spent, UCx#4 target description UCx#4_specfications.PNG
Friday, July 20, 2012, 11:35
UCx#4 target description, see attachment#1
The target is assembled and stored in the Ar-glove box.  It will be transported to the South Hotcell on July 31, 2012.
Entry  Tuesday, August 09, 2011, 14:31, John Wong, UCx#2, LP-SIS, ITW, TM1, 38634-8, 38633-5, Spent, UCx#2 run is finished. broke_screwhead.jpgUCx#2.jpg
UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm
Entry  Friday, August 30, 2013, 12:08, John Wong, UCx#7, LP-SIS, ITW, TM1, 38634-7, 39230-4, Spent, UCx#7 - target description UCx#7_specifications.PNG
Friday, August 30, 2013, 12:06
UCx#7 target specification, see attachment #1.
The target is assembled and going online soon.