99
|
Friday, January 17, 2014, 15:41 |
Isaac Earle | Standard Operation | Target 1 | Target | Water Purged from T1 & T2 Targets | Water was purged from the T1 and T2 targets
using compressed air. The water is
stored in a labeled bucket on the BL1A blocks |
|
151
|
Wednesday, April 22, 2015, 09:46 |
Isaac Earle | Development | Target 1 | Target | Water Sensors Installed on T1 Monolith | Four water sensors have been installed
on top of the T1 monolith. These water
sensors were wired and brought to the area |
|
24
|
Tuesday, March 27, 2012, 13:14 |
Isaac Earle | Repair | Target 1 | Target | Water removal from T1 monolith | All water was removed from the base of
the target hole in the T1 monolith using
a suction tube device and wypalls. Video |
|
35
|
Wednesday, May 30, 2012, 15:39 |
Isaac Earle | Repair | Target 1 | Target | West Side Manipulator Removed from Hot Cell | The west side manipulator was removed
from the hot cell using the new manipulator
removal frame. The operation went smoothly |
|
246
|
Thursday, November 01, 2018, 13:57 |
Keith C Ng | Other | Other | Other | nuclear venillation in hot cells not working | Randomly checked on the nuclear ventilation
for the Meson Hall Hotcells and discovered
they were not running again (both magnahelic |
|
1
|
Wednesday, June 29, 2011, 15:27 |
John Wong | | | | test | blah blah blah.... |
|
227
|
Thursday, July 27, 2017, 09:34 |
Keith C Ng | Development | Other | Other | test 2 | test 2 |
|