ID Date Author Category Type Specific Subjectdown Text Attachments
  227   Thursday, July 27, 2017, 09:34 Keith C NgDevelopmentOtherOthertest 2test 2   
  1   Wednesday, June 29, 2011, 15:27 John Wong   testblah blah blah....   
  246   Thursday, November 01, 2018, 13:57 Keith C NgOtherOtherOthernuclear venillation in hot cells not workingRandomly checked on the nuclear ventilation
for the Meson Hall Hotcells and discovered
they were not running again (both magnahelic
  
  35   Wednesday, May 30, 2012, 15:39 Isaac EarleRepairTarget 1TargetWest Side Manipulator Removed from Hot Cell The west side manipulator was removed
from the hot cell using the new manipulator
removal frame.  The operation went smoothly
 IMG_0227.JPGIMG_0231.JPGIMG_0238.JPGIMG_0241.JPG 
  24   Tuesday, March 27, 2012, 13:14 Isaac EarleRepairTarget 1TargetWater removal from T1 monolithAll water was removed from the base of
the target hole in the T1 monolith using
a suction tube device and wypalls.  Video
 downstream.jpgsouth.jpgupstream.jpgM13.jpg 
  151   Wednesday, April 22, 2015, 09:46 Isaac EarleDevelopmentTarget 1TargetWater Sensors Installed on T1 Monolith Four water sensors have been installed
on top of the T1 monolith.  These water
sensors were wired and brought to the area
 T1_Water_Sensors.jpgIMG_4859.JPGIMG_4860.JPG 
  99   Friday, January 17, 2014, 15:41 Isaac EarleStandard OperationTarget 1TargetWater Purged from T1 & T2 TargetsWater was purged from the T1 and T2 targets
using compressed air.  The water is
stored in a labeled bucket on the BL1A blocks
  
  133   Wednesday, January 07, 2015, 17:27 Isaac EarleRepairTarget 2Water LeakWater Leaks at T2 Cooling PackageThe T2 cooling package was visually inspected
today after blocks were removed.  With
the cooling package off the following leaks
  
  100   Monday, January 20, 2014, 11:51 Isaac EarleRepairTarget 2Water LeakWater Leak from Meson Hall Mezzanine Near T2 A water leak developed this morning
from a city water supply line at a hose connection
near the T2 expansion tank.  Water was
  
  33   Thursday, May 24, 2012, 18:26 Isaac EarleRepairTarget 2CoolingWater Leak From T2 Cooling Package (Disconnected from Target) Today I noticed a "NOT OK"
signal from T2 water expansion tank warning
level sensor.  I checked the water level
  
  101   Wednesday, January 22, 2014, 15:41 Isaac EarleStandard OperationTarget 2Water LeakWater Drained From Suck Tube Released After approval from RPG, the water
drained from the suck tube, which was stored
in a bucket in the RH lab active sink area,
  
  107   Tuesday, March 25, 2014, 18:24 Isaac EarleDevelopmentTarget 2Water LeakWater Detecting Sensor Install at T1 & T2Water detecting strips were installed around
the T1 and T2 areas today with Doug Preddy
and contractors from SMT Research.  Four
 9x 
  231   Thursday, December 07, 2017, 13:54 Isaac EarleDevelopmentOtherOtherWaste pails transferred from warm cell storage bunker to rad waste pitSix 5 gallon pails were transferred this
morning from a temporary storage bunker in
the Warm Cell to the Rad Waste Pit for long
 IMG_0102.JPGIMG_6285.JPGIMG_0102.JPGIMG_6285.JPG 
  171   Thursday, August 27, 2015, 15:47 Isaac EarleRepairOtherWater LeakWarm Cell Water Window Seal Replacement UpdateSince the previous E-Log the following
tasks have been completed:
- Panel spacer rods installed at
  
  170   Wednesday, August 19, 2015, 12:10 Isaac EarleRepairOtherOtherWarm Cell Water Window Seal Replacement StatusThe following tasks were completed over
the past 2 weeks:
- Aquarium Technology Ltd. (UK) was
 6x 
  173   Monday, September 28, 2015, 11:33 Isaac EarleRepairOtherWater LeakWarm Cell Water Window Repair CompleteThe warm cell water window tanks were filled
on September 17 after 2 weeks of curing time.
 A water leak was found coming from
  
  272   Wednesday, February 17, 2021, 10:39 Isaac EarleDevelopmentOtherUCNUCN Target Cask TestingA trial run of remote removal of the UCN
target was performed using the shielded target
cask (TTA0335) developed in 2020.  The
 8x 
  8   Friday, January 06, 2012, 15:37 Isaac EarleMaintenanceTarget 2TargetTransferred M20 beam blocker to hot cellUncovered T2 monolith and transferred M20BB to hot cell using flask.   
  333   Tuesday, October 17, 2023, 10:16 Eric LaheMaintenanceOtherActive SumpTesting the Remote Handling Lab Active Sump Level SensorThe level sensor for the active sump in
the RH lab was tested.
The level sensor is working properly
  
  2   Thursday, June 30, 2011, 16:47 John WongDevelopmentTarget 1TargetTesting Elogblah blah blah.... fjda;jfeowifjoajglfa;nafg   