  RH-Meson Hall, Page 1 of 18  Not logged in ELOG logo
ID Date Author Categorydown Type Specific Subject Text Attachments
  42   Thursday, June 21, 2012, 13:38 Isaac EarleStandard OperationTarget 2CoolingT2 Water Package Started The T2 water package was reconnected
to the target and started after being shut-off
since April 12, 2012.  The M9 and M20
  
  47   Tuesday, July 03, 2012, 13:23 Isaac EarleStandard OperationTarget 2TargetT2 Plug Block Replaced & Beam Blockers TestedThe T2 plug block was replaced and the
M9 and M20 beam blockers were tested.  The
plug block did not interfere with the travel
  
  49   Monday, July 09, 2012, 17:17 Isaac EarleStandard OperationTarget 1TargetBL1A Start-Up Prep - T1 & T2 targets switched to
"remote" control
 - Both target ladders were moved
  
  63   Thursday, November 22, 2012, 17:22 Isaac EarleStandard OperationTarget 1Active SumpRH Lab Active Sump Released On Wednesday November 21 at approximately
9am the level of the Remote Handling active
sump was inspected and found to be at approximately
  
  65   Tuesday, January 08, 2013, 09:27 Isaac EarleStandard OperationTarget 2TargetBL1A Air Amplifier turned off for duration of shutdown. The BL1A air amplifier
has been shut down by closing the air supply
  
  67   Friday, January 11, 2013, 15:48 Isaac EarleStandard OperationTarget 1TargetBL1A Tunnel Accessed The BL1A tunnel was accessed to drain
and sample T2 cooling package water.  A
puddle of water was noticed in the South
 IMG_0801.JPGIMG_0802.JPG 
  68   Monday, January 14, 2013, 16:55 Isaac EarleStandard OperationTarget 2TargetTarget Move & Damaged Profile MonitorThe T2-MK1 target (spare T2 target) was
transported from the hot cell to the storage
pit today.  
  
  70   Monday, January 21, 2013, 16:18 Isaac EarleStandard OperationTarget 2TargetT2 Cooling Package Water ReleasedThe T2 cooling package water was drained
to the BL1A active sump, refilled, cycled,
and drained again.  Samples of T2 cooling
  
  77   Friday, April 12, 2013, 13:28 Isaac EarleStandard OperationTarget 1CoolingCooling Packages Leak Tight The T1 and T2 expansion tanks were
filled on Monday April 8th.  There was
no change in the level when inspected today
  
  79   Wednesday, April 17, 2013, 16:43 Isaac EarleStandard OperationTarget 2TargetT2 target installed; Vacuum leak-tight; Monitors OK; T2 ready for beamThe T2-MK2 target was transferred from
the storage pit to the beam line yesterday
(April 16th).  The field was measured
  
  80   Wednesday, April 17, 2013, 16:45 Isaac EarleStandard OperationTarget 1TargetT1-MK1 Target Leak Checked The T1-MK1 target was leak checked
on April 15th at the T1 monolith by Ron Kuramoto
and Edi Dalla Valle.  No leaks were
  
  89   Wednesday, September 25, 2013, 14:05 Isaac EarleStandard OperationTarget 1Active SumpRH Lab Active Sump Level Sensor InspectedA notification was received that the RH
lab active sump level sensor is due for annual
inspection.  The sensor was tested and
  
  97   Wednesday, January 15, 2014, 15:38 Isaac EarleStandard OperationTarget 2Water LeakSuck Tube Drained and RinsedThe suck tube vessel was drained, rinsed,
and transported to the active sink area in
the Meson Hall Hot Cell Lab.  There
 IMG_1276.JPGIMG_1291.JPGIMG_1295.JPGIMG_1296.JPGIMG_1297.JPG 
  98   Friday, January 17, 2014, 10:10 Isaac EarleStandard OperationTarget 1CoolingT1/T2 Cooling Packages & Air Amplifier Shut Off In preparation for Edi to vent the
BL1A vacuum volume, the T1 and T2 cooling
packages were both shut off.  They will
  
  99   Friday, January 17, 2014, 15:41 Isaac EarleStandard OperationTarget 1TargetWater Purged from T1 & T2 TargetsWater was purged from the T1 and T2 targets
using compressed air.  The water is
stored in a labeled bucket on the BL1A blocks
  
  101   Wednesday, January 22, 2014, 15:41 Isaac EarleStandard OperationTarget 2Water LeakWater Drained From Suck Tube Released After approval from RPG, the water
drained from the suck tube, which was stored
in a bucket in the RH lab active sink area,
  
  102   Thursday, February 06, 2014, 17:05 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 Cooling Package Filters ChangedWater was drained from the T1 and T2 cooling
packages, samples taken, and delivered to
RPG.
  
  103   Thursday, February 13, 2014, 14:27 Isaac EarleStandard OperationTarget 2TargetT2 Target MovesThe T2-MK1 target was moved from the beam
line to the target storage pit in position
4.  The target was measured to be 30mSv/hr
  
  106   Monday, March 24, 2014, 18:14 Isaac EarleStandard OperationTarget 2CoolingT2 Cooling Package & Air Amplifier StartedBill Rawnsley completed an electrical check
of the T2 profile monitor today from the
Meson Hall mezzanine - All OK.  
  
  110   Thursday, April 03, 2014, 10:19 Isaac EarleStandard OperationTarget 2CoolingT2 Cooling Package Resin Can ReplacedThe resin can was removed from the T2 cooling
package and transported to the warm cell.
 A replacement can with fresh resin
 T2_Conductivity.jpg 