  RH-Meson Hall, Page 1 of 18  Not logged in ELOG logo
ID Date Authordown Category Type Specific Subject Text Attachments
  248   Friday, January 25, 2019, 10:53 maicodallavalleRepairOtherCyclotron electricalCyclotron Elevating system Motor electrical wire repairs2018 Cyclotron lid up problem. Station
#9 was  found to  have the motor
wires along the beam plain had damaged wire
  
  321   Thursday, March 02, 2023, 06:59 maicodallavalleMaintenanceTarget 1CoolingRefilled Expasion TankI have refilled the water package on T1
with DI water. The Expansion Tank is at 37cm.
This may change when pump is turned on.
  
  322   Thursday, March 02, 2023, 07:04 maicodallavalleMaintenanceTarget 2CoolingRefilled Expasion TankI have filled the water package on T2 with
DI water. The expansion tank is at 38.1cm.
This may change when the pump is turned on.
  
  121   Thursday, September 11, 2014, 15:36 Ron KuramotoRepairTarget 2Water Leak1A Tunnel T2 Cu-ALCW water leakOn Sep. 3rd
during the 6 hr maintenance day, Doug Preddy
 IMG_1007sm.JPGIMG_1009sm.JPG 
  122   Thursday, October 16, 2014, 17:44 Ron KuramotoRepairTarget 2Water Leak1A Tunnel T2 Cu-ALCW water leak repair 
 6x 
  123   Thursday, November 06, 2014, 17:18 Ron KuramotoRepairTarget 2Cooling1AT2 Collimator B, faulty Thermister water out temperature On 14Oct2014, the 1AT2 Collimator B water
outlet temperature rose to 100o
C. 
  
  124   Thursday, November 06, 2014, 17:22 Ron KuramotoRepairTarget 2Cooling1AT2, faulty Thermister water out temperture

    

       
            
  
  176   Friday, October 02, 2015, 17:25 Ron KuramotoStandard OperationTarget 1TargetRaise Target to lower Rad levels for 1AM7 repairToday the T1MK2 target was moved from Position
4 to Position 0 to lower the Rad fields for
the 1AM7 repair in the 1A Tunnel. The Rad
  
  259   Wednesday, March 04, 2020, 13:42 Ron KuramotoRepairOtherOtherB/L 1A vacuum air leak repair A 4” Marmon aluminum blank-off
flange and o-ring were replaced on the south
port of the T1 target monolith vacuum vessel. This
 1AT1_Vacuum_Leak_Repair-Feb2020.pdf 
  344   Thursday, February 15, 2024, 12:38 Riley SykesRepairOtherHot CellIndium Extruder Hand PumpFeb 1 2024
Hand Pump observed to be losing pressure
at full extension of cylinder, seals likely
  
  273   Wednesday, March 31, 2021, 16:15 Matthew GareauStandard OperationTarget 1TargetT1-MK1 target exchange March 29 Monday
- moved T1-MK1 target from beamline
to hotcell  (field from target 15mSv/hr
 IMG_20210330_140744.jpgIMG_20210330_141059.jpgIMG_20210330_141455.jpgT1-MK1_-_2021.pdf 
  274   Friday, April 09, 2021, 12:42 Matthew GareauMaintenanceTarget 2CoolingChanged the paddle wheel, o ring, and shaft in the Collimator A flow meter at the T2 packageWith the assistance of Maico we changed
the paddle wheel, o ring, and shaft in the
Collimator A flow meter (Q4) at the T2 package.
  
  276   Thursday, February 17, 2022, 13:03 Matthew GareauMaintenanceTarget 1TargetT1 MK2 wire scanner and protect monitor test removal and reattachment with pin straightening this Work was done on 09 Dec 2021.
Since Isaac Earle was leaving Triumf
he was giving us (maico, chad, adam, and
 IMG_20211207_140443.jpgIMG_20211207_140508.jpgIMG_20211207_140735.jpgIMG_20211207_122631.jpgIMG_20211207_142836.jpg 
  285   Wednesday, March 16, 2022, 14:16 Matthew GareauStandard OperationOtherCoolingT1/T2 water packages drained to B1A AWHT, tested, and released. Also solenoid valve SV1 broken The T1/T2 water packages were drained
into the B1AAWHT (280L), the water was sampled
and tested by RPG, results included in elog.
 11_Mar_2022_Tritium_Records_T1_T2_from_RPG.pdfsolenoid_valve_SV1.jpg 
  295   Wednesday, July 06, 2022, 12:49 Matthew GareauRepairOtherOtherHelium line damage, and hotcell window oil leakingToday myself and Adam Newsome started the
leak detection steps for a target exchange
and notice that the Helium line was not connected/broken
  
  303   Friday, September 23, 2022, 10:51 Matthew GareauStandard OperationTarget 2TargetTarget T2-MK2 moved to storage pitThe T2-MK2 target was transported from
the east hot cell to the storage pit at position
3.
 Storage_location_state_as_of_Sept_23_2022_(after_target_moves).jpg 
  224   Monday, July 10, 2017, 16:20 Keith C NgRepairTarget 2TargetT2 Heat Exchanger Secondary Side Solenoid Valve Failure The T2 heat exchanger secondary side solenoid
failed on July 9 at approximately 19:30 (EPICS
ID: B1A:T2CS:SVSEC).  The valve was
 20170710_t2_water_package_repair.pdf 
  227   Thursday, July 27, 2017, 09:34 Keith C NgDevelopmentOtherOthertest 2test 2   
  245   Thursday, October 25, 2018, 08:58 Keith C NgRepairOtherOtherT1 collimator valve solenoid coil replaced againOn
23rd October we restarted the T1 and T2 water
packages after the mini shutdown and after
  
  246   Thursday, November 01, 2018, 13:57 Keith C NgOtherOtherOthernuclear venillation in hot cells not workingRandomly checked on the nuclear ventilation
for the Meson Hall Hotcells and discovered
they were not running again (both magnahelic
  