Monday, March 03, 2014, 11:55, Isaac Earle, Repair, Target 2, Target, T2 Protect Monitor Moved to HC  
|
Thursday, February 13, 2014, 14:27, Isaac Earle, Standard Operation, Target 2, Target, T2 Target Moves
|
Thursday, February 06, 2014, 17:05, Isaac Earle, Standard Operation, Target 1, Cooling, T1 & T2 Cooling Package Filters Changed
|
Wednesday, January 22, 2014, 15:41, Isaac Earle, Standard Operation, Target 2, Water Leak, Water Drained From Suck Tube Released
|
Monday, January 20, 2014, 11:51, Isaac Earle, Repair, Target 2, Water Leak, Water Leak from Meson Hall Mezzanine Near T2
|
Friday, January 17, 2014, 15:41, Isaac Earle, Standard Operation, Target 1, Target, Water Purged from T1 & T2 Targets
|
Friday, January 17, 2014, 10:10, Isaac Earle, Standard Operation, Target 1, Cooling, T1/T2 Cooling Packages & Air Amplifier Shut Off
|
Wednesday, January 15, 2014, 15:38, Isaac Earle, Standard Operation, Target 2, Water Leak, Suck Tube Drained and Rinsed    
|
Thursday, January 09, 2014, 15:21, Isaac Earle, Repair, Target 2, Target, T2-MK2 Electrical Check
|
Monday, January 06, 2014, 15:55, Isaac Earle, Repair, Target 2, Target, T2-MK2 Repair   
|
Tuesday, November 26, 2013, 10:33, Isaac Earle, Repair, Target 2, Target, T2-MK2 Water Flush
|
Saturday, November 23, 2013, 18:37, Isaac Earle, Repair, Target 2, Target, T2-MK1 Installation
|
Friday, November 22, 2013, 20:26, Grant Minor, Repair, Target 2, Water Leak, T2 Water Leak - Target Assembly Removed and Water Sucked Out of B/L   
|
Tuesday, November 12, 2013, 11:49, Isaac Earle, Repair, Target 1, Target, MH Hot Cell Lab Manipulator Overhaul
|
Wednesday, October 23, 2013, 15:30, Isaac Earle, Development, Target 1, Cooling, T1 & T2 High Temp Safety Switch Tested
|
Wednesday, September 25, 2013, 14:05, Isaac Earle, Standard Operation, Target 1, Active Sump, RH Lab Active Sump Level Sensor Inspected
|
Wednesday, September 11, 2013, 16:13, Isaac Earle, Repair, Target 2, Cooling, T2 Cooling Package Water Leak Repair
|
Monday, September 09, 2013, 16:22, Isaac Earle, Repair, Target 1, Cooling, T1 P1 Transducer Replaced
|
Monday, September 09, 2013, 16:13, Isaac Earle, Repair, Target 2, Cooling, Drop in T2 Cooling Package Water Level
|
Friday, August 23, 2013, 10:39, Isaac Earle, Repair, Target 1, Cooling, T1 Cooling Package Inlet Pressure (P1) Sensor 
|
|