98
|
Friday, January 17, 2014, 10:10 |
Isaac Earle | Standard Operation | Target 1 | Cooling | T1/T2 Cooling Packages & Air Amplifier Shut Off | In preparation for Edi to vent the
BL1A vacuum volume, the T1 and T2 cooling
packages were both shut off. They will |
|
|
97
|
Wednesday, January 15, 2014, 15:38 |
Isaac Earle | Standard Operation | Target 2 | Water Leak | Suck Tube Drained and Rinsed | The suck tube vessel was drained, rinsed,
and transported to the active sink area in
the Meson Hall Hot Cell Lab. There |
|
|
96
|
Thursday, January 09, 2014, 15:21 |
Isaac Earle | Repair | Target 2 | Target | T2-MK2 Electrical Check | An electrical check was performed
on the T2-MK2 profile monitor by Bill Rawnsley.
All signals produced the expected response, |
|
|
95
|
Monday, January 06, 2014, 15:55 |
Isaac Earle | Repair | Target 2 | Target | T2-MK2 Repair | The leaking 10cm Be target was removed
from position 3 on the T2-MK2 target ladder
and the water ports were blanked-off with |
|
|
94
|
Tuesday, November 26, 2013, 10:33 |
Isaac Earle | Repair | Target 2 | Target | T2-MK2 Water Flush | The T2-MK2 target in the hot cell
was flushed with water and then purged with
air so that stagnant water is not left sitting |
|
|
93
|
Saturday, November 23, 2013, 18:37 |
Isaac Earle | Repair | Target 2 | Target | T2-MK1 Installation | - T2-MK1 target transported from the storage
area by Isaac and Grant and installed at
the T2 monolith. All services were |
|
|
92
|
Friday, November 22, 2013, 20:26 |
Grant Minor | Repair | Target 2 | Water Leak | T2 Water Leak - Target Assembly Removed and Water Sucked Out of B/L | T2 target water leak was identified earlier
this morning.
Isaac Earle, Ron Kuramoto and Keith |
|
|
91
|
Tuesday, November 12, 2013, 11:49 |
Isaac Earle | Repair | Target 1 | Target | MH Hot Cell Lab Manipulator Overhaul | Complete overhaul of all manipulators
in the Remote Handling Hot Cell Lab in the
Meson Hall was performed by Peter Dudley |
|
|
90
|
Wednesday, October 23, 2013, 15:30 |
Isaac Earle | Development | Target 1 | Cooling | T1 & T2 High Temp Safety Switch Tested | An end-to-end test was performed
on the new T1 and T2 high temperature safety
switches yesterday during the maintenance |
|
|
89
|
Wednesday, September 25, 2013, 14:05 |
Isaac Earle | Standard Operation | Target 1 | Active Sump | RH Lab Active Sump Level Sensor Inspected | A notification was received that the RH
lab active sump level sensor is due for annual
inspection. The sensor was tested and |
|
|
88
|
Wednesday, September 11, 2013, 16:13 |
Isaac Earle | Repair | Target 2 | Cooling | T2 Cooling Package Water Leak Repair | The T2 cooling package was uncovered
this morning and a leak was found coming
from the Swagelok ball valve on the 3/4" |
|
|
87
|
Monday, September 09, 2013, 16:22 |
Isaac Earle | Repair | Target 1 | Cooling | T1 P1 Transducer Replaced | The BL1A tunnel was accessed today
to assess a faulty reading from the T1 cooling
package inlet pressure transducer (T1P1). |
|
|
86
|
Monday, September 09, 2013, 16:13 |
Isaac Earle | Repair | Target 2 | Cooling | Drop in T2 Cooling Package Water Level | On September 9th in the morning Ron
Kuramoto noticed that the T2 cooling package
expansion tank level was reading NOT OK for |
|
|
85
|
Friday, August 23, 2013, 10:39 |
Isaac Earle | Repair | Target 1 | Cooling | T1 Cooling Package Inlet Pressure (P1) Sensor | The T1 cooling package inlet pressure
(P1) has been dropping since approximately
May 5, 2013 from the regular operating pressure |
|
|
84
|
Tuesday, June 04, 2013, 13:42 |
Isaac Earle | Repair | Target 1 | Target | T1 and T2 Power Supply Fans Replaced | Replacement of the power supply fans
for the T1 Power Supply, T2 Power Supply,
as well as an additional power supply in |
|
|
83
|
Friday, May 31, 2013, 16:07 |
Isaac Earle | Repair | Target 1 | Target | Power Supply Fan Failure | Today (May 31, 2013) I was contacted
regarding a burning smell and high temperatures
around the T1/T2 controls racks. Erwin |
|
|
82
|
Tuesday, May 14, 2013, 13:26 |
Isaac Earle | Development | Target 1 | Target | T1 & T2 Profile Scan | The T1 and T2 profile monitors were used
during today's development shift. Target
ladder movement for T1 was done at the panel |
|
|
81
|
Friday, April 19, 2013, 09:55 |
Isaac Earle | Development | Target 1 | Cooling | T1&T2 cooling package safety/standards compliance upgrade complete (SASP0120) | Yesterday (April 18th) the T1 and T2 cooling
package PRV outlet lines were routed to the
active drain in the 1A tunnel. All |
|
|
80
|
Wednesday, April 17, 2013, 16:45 |
Isaac Earle | Standard Operation | Target 1 | Target | T1-MK1 Target Leak Checked | The T1-MK1 target was leak checked
on April 15th at the T1 monolith by Ron Kuramoto
and Edi Dalla Valle. No leaks were |
|
|
79
|
Wednesday, April 17, 2013, 16:43 |
Isaac Earle | Standard Operation | Target 2 | Target | T2 target installed; Vacuum leak-tight; Monitors OK; T2 ready for beam | The T2-MK2 target was transferred from
the storage pit to the beam line yesterday
(April 16th). The field was measured |
|