Entry  Monday, December 01, 2014, 14:06, chad fisher, South Hot-Cell, Repair, TM2, , TM2 REFURB. WATER LOOP TEST TM2_20141201_01.JPGTM2_20141201_02.JPGTM2_20141201_03.JPGTM2_20141201_04.JPGTM2_20141201_05AC.jpg
Some issues with the turntable and having to wait for a decision on whether to remove TM2 from the hot cell so that TM4 with dead UCx target could be
put in this morning.
Progress on TM2:
Entry  Monday, December 01, 2014, 12:05, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 Maintenance 
F-308's have been serviced and are ready to be filled with spent targets. F-308's witch were serviced are #6,#13,#15,#16,and #19.
Entry  Friday, November 28, 2014, 13:06, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, module move 
TM#2 with no target or source tray has been moved from the north east silo to the south hot cell.
Entry  Wednesday, November 26, 2014, 11:11, Travis Cave, Spent Target Vault, Standard Operation, , Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29, Spent targets moved to mini storage 
The following targets have been moved to the mini storage from the target storage vault:

    Ta#38
    Nb#7
    TiC#3
    SiC#29
    NiO#2

These target will be removed from
the mini storage and placed into the F-308's on December 3rd.
Entry  Tuesday, November 25, 2014, 12:45, David Wang, ITE, Standard Operation, TM4, UCx11, 5 Shielding blocks have been transferred from ITW to ITE. 
5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam.
Entry  Tuesday, November 25, 2014, 11:33, David Wang, South Hot-Cell, Development, , , Remove UCX 11 target transfer stand from SHC back to TH. 
The stand was used for transferring UCX11 targte from TH to SHC. The stand wit target was craned down from TH into SHC last week and stayed there over
weekend. Chad and I removed the stand out of SHC yesterday. It was heavily contaminated. RPG and I spent more than 3 hours to clean this stand. See the
emails I pasted below for  detail information.
Entry  Friday, November 21, 2014, 10:40, Travis Cave, Spent Target Vault, Standard Operation, , Ta#44, Spent target move Vault_Storage_November_21_2014.pdf
The spent Ta#44 target has been removed from the south hot cell, it was placed in pail #121 and placed in spot 4A of the storage vault. It was 276mSv/hr
upon removal from the south hot cell.
Entry  Thursday, November 20, 2014, 14:13, David Wang, Conditioning Station, Standard Operation, TM4, UCx11, CS and TM4 was vented with Argon gas 
CS and TM4 was vented with Argon gas this morning before it was moved from CS to ITE.
Entry  Thursday, November 20, 2014, 14:12, David Wang, ITE, Standard Operation, TM4, UCx11, TM4 is connected in ITE. 
TM4 has been connected connect in ITE. Water is supplied to TM4 module only.
Entry  Thursday, November 20, 2014, 11:49, Travis Cave, ITE, Standard Operation, TM4, UC#11, module move 
TM#4 with UCx#11has been moved from the conditioning station to the east target station.
Entry  Wednesday, November 19, 2014, 11:12, David Wang, Conditioning Station, Standard Operation, TM4, , CS roughing pump is started.  
CS roughing pump is started for TM4 and UCX 11 target.
Entry  Wednesday, November 19, 2014, 09:18, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#11, Electrical check TM4_elec_check_UC11_SHC.PDF
TM#4 with UC#11 electrical check done. See attached PDF for the results.
Entry  Wednesday, November 19, 2014, 08:49, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#11, Ta#44 Removed Ucx#11 Installed 
Ta#44 has been removed from TM4 and UCx#11 has been installed and is ready for testing.
New fasteners were installed for all mounting and current connections.
High current fasteners were torqued to 130in lbs.
Entry  Tuesday, November 18, 2014, 11:15, David Wang, ITE, Standard Operation, TM4, Ta#44, TM4 has been disconnected in ITE. 
Dan and I disconnected TM4 in ITE.
Entry  Tuesday, November 18, 2014, 11:14, David Wang, South Hot-Cell, Standard Operation, , UCx11, crane down UCx 11 target into SHC from TH 
I craned down UCx11 target from TH into SHC. Chad was in SHC service area watching on it. The source tray moving jig was installed on the crane for this
moving.
Entry  Tuesday, November 18, 2014, 10:28, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#44, module move 
TM#4 with Ta#44 has been moved from the east target station to the south hot cell.
Entry  Monday, November 17, 2014, 13:45, chad fisher, South Hot-Cell, Repair, , , Jig for roof install of target Target_roof_install_20141117_01.jpgTarget_Roof_install_Jig_20141117_02.jpgTarget_roof_install_20141117_03.jpgTarget_roof_install_20141117_04.jpg
Jig for installation of target through hot cell roof has been assembled and placed in the target hall.
Entry  Monday, November 17, 2014, 11:38, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved from the conditioning station to the north west silo.
Entry  Thursday, November 13, 2014, 14:05, David Wang, ITE, Repair, TM4, , Dan and I replaced flow wheel on ITE HVC2 water flow sensor. 
Dan and I replaced flow wheel on ITE HVC2 water flow sensor. The old wheel did rotate smoothly inside its SST case. The new wheel works fine.
Entry  Thursday, November 13, 2014, 14:01, David Wang, ITW, Repair, TM1, , I replaced flow wheel and coil on ITW MSP water flow sensor. 
I replaced flow wheel and coil on ITW MSP water flow sensor which is located in ITW pit. Before replacement, I checked the signal strength and frequency
form e-board on this circuit. The signal was good in 10minutes watching. Still, I replaced them. The flow sensor works fine after replacement. I made a
comment  on Isac e-fault system about this issue.