2725
|
Tuesday, December 03, 2024, 10:10 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | module disconnection | TM2 with spent target TA#68 was disconnected
in ITE and is being moved to SHC. All water
lines are purged for module storage. |
|
|
2729
|
Wednesday, December 04, 2024, 08:05 |
Frank Song | ITE | Standard Operation | TM3 | UCx#47 | Module Connection | TM3 with new target UCx#47 was connected
in ITE right after be moved from TCS. |
|
|
2742
|
Tuesday, January 07, 2025, 12:05 |
David Wang | ITE | Standard Operation | TM3 | UCx #47 | ITE primary and secondary vacuum vessel leak check for 2025 shut down | ITE primary and secondary vacuum vessel
leak check for 2025 shut down have been done.
No leak. The TM3 waterlines helium |
|
|
2747
|
Monday, January 13, 2025, 10:36 |
Frank Song | ITE | Standard Operation | TM3 | UCx#47 | module disconnection | TM3 with spent target UCx#47 was
disconnected in ITE and will be moved to
SHC. |
|
|
2643
|
Wednesday, July 17, 2024, 15:06 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround Complete - SHC/NHC Area | A safety walkaround for July 2024 was completed
for the B2 level by A. Newsome. No deficiencies
to report. |
|
|
2704
|
Thursday, October 10, 2024, 12:20 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall | A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be |
|
|
2705
|
Friday, October 11, 2024, 15:59 |
Aaron Tam | Facilities | Repair | | | ISAC B2 North Hot Cell Phone Fixed | Resolution comment / Commentaire
de résolution:
|
|
|
2730
|
Wednesday, December 04, 2024, 09:00 |
David Wang | Facilities | Standard Operation | TM2 | | all water lines on TM2 have been purged. | all water lines on TM2 have been purged.
Refilled them(except HS ) with 60psi nitrogen
for module silo storage before next year |
|
|
2738
|
Friday, January 03, 2025, 09:59 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall | A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be |
|
|
2744
|
Thursday, January 09, 2025, 11:08 |
David Wang | Facilities | Maintenance | | | ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings | ITH:MP1 is deteriorating by watching on
ITH:CG1 and CG2 readings and investigation
in pit. A fault 17644 has been issued. this |
|
|
146
|
Friday, July 13, 2012, 16:33 |
Bevan Moss | Crane | Repair | | | Crane has stopped working | In the AM today David and I used the crane
to raise the ground plate sheet metal into
place. This afternoon when I attempted to |
|
|
147
|
Monday, July 16, 2012, 11:55 |
Bevan Moss | Crane | Repair | | | Crane has stopped working |
|
|
|
500
|
Tuesday, October 08, 2013, 18:12 |
Grant Minor | Crane | Repair | TM4 | | Target Hall Crane Stuck in East-West Direction - Update | Grant Minor wrote this e-mail today:
***
Hello all, |
|
|
501
|
Wednesday, October 09, 2013, 19:33 |
Grant Minor | Crane | Repair | TM4 | | Target Hall Crane not operational - likely controls / PLC hardware failure (not stuck wheel) |
|
|
|
503
|
Tuesday, October 15, 2013, 16:44 |
Grant Minor | Crane | Repair | | | Target Hall Crane - operational with temporary thermal sensor bypass | E-mail correspondence on the Target Hall
crane fault diagnosis between October 11th
and 15th: |
|
|
557
|
Tuesday, November 26, 2013, 14:10 |
Travis Cave | Crane | Maintenance | | | Thermal relay replaced | The bad thermal motor protection relay
for the crane has been replaced with a new
unit. Crane was tested in pendant(local) |
|
|
840
|
Friday, February 06, 2015, 08:06 |
David Wang | Crane | Repair | | | TH crane lost movement controls since last Friday. | Last Friday, During the crane per use check,
I found the main power supply to to crane
was shut off. I was told Don and Travis |
|
|
841
|
Friday, February 06, 2015, 12:27 |
David Wang | Crane | Repair | | | TH crane troubleshoot | Gordon crane technician started TH crane
trouble shooting this morning. The problem
is found that there is no 115VAC power supply |
|
|
843
|
Thursday, February 12, 2015, 09:11 |
David Wang | Crane | Repair | TM4 | | TH crane troubleshoot and annual inspection. | Gordon crane technicians continued their
troubleshooting on this Tuesday. They found
the crane up-limit protection switch which |
|
|
844
|
Monday, February 16, 2015, 11:57 |
David Wang | Crane | Repair | | | TH crane | Dave.Morris installed a new battery on
crane control PLC board and uploaded the
program. Travis, Dan and I tested the crane |
|