Entry  Wednesday, January 07, 2015, 09:31, Anders Mjos, Conditioning Station, Development, TM2, , High Voltage Conditioning 
No Source Tray installed. Loop on cooling circuit D. All other circuits blanked off.
Voltages stated below are set point voltages. These corresponds reasonably well with the local read backs on the power supplies. The read back
voltages in EPICS are somewhat lower.
Entry  Tuesday, January 06, 2015, 11:21, Anders Mjos, Conditioning Station, Development, TM2, , He leak check of cooling circuits. 2015-01-06_He_leak_check_water_circuits.pdf
No leak detected on either He-detector (connected directly to Service Cap) or on RGA. See attached screen shots.
A vacuum increase (air only on RGA) was seen when de-pressurizing circuit I.
Entry  Tuesday, January 06, 2015, 11:14, David Wang, ITE, Standard Operation, TM4, , 4 Shielding blocks have been moved out of ITE . 
4 shielding blocks have been moved out of  ITE to block storage area. Fiona did the survey and with me during the move.
Entry  Monday, January 05, 2015, 15:01, Anders Mjos, Conditioning Station, Development, TM2, , RGA switched on 
 
Entry  Monday, January 05, 2015, 12:47, Anders Mjos, Conditioning Station, Development, TM2, , Cooling package started 
 by "enable staging" button. MP3 has to be turned off-on to open WPV1
Entry  Tuesday, December 23, 2014, 14:10, Anders Mjos, Conditioning Station, Development, TM2, , He leak check of the Service Cap using RGA 
The RGA showed no response to He-spray on the Service Cap. He stable at 3.5E-9 T partial pressure, water at 1.3E-6 T. IG1 at 9.9E-8 T
Entry  Monday, December 15, 2014, 15:55, Grant Minor, Conditioning Station, Repair, , , Access to ISAC TCS TK2 Expansion Tank - Fall Arrest TK2_Expansion_Tank_Elevation_ISAC1_Exp_Hall_15Dec2014.JPGTK2_Expansion_Tank_-_Fall_Arrest_Config_1_-_15Dec2014.JPGTK2_Expansion_Tank_-_Fall_Arrest_Config_2_-_15Dec2014.JPGTK2_Expansion_Tank_-_Fall_Arrest_Config_3_-_15Dec2014.JPG
Hello all,

Access was required this morning to the TCS TK2 Expansion Tank to     open a valve and re-fill the tank.
Entry  Monday, December 15, 2014, 08:50, Anders Mjos, Conditioning Station, Maintenance, TM2, , TK2 level below 15 in (secondary loop) 
 The level dropped below 15 in over the weekend. MP2 stopped, but MP3 condtinued pumping.
    Reply  Monday, December 15, 2014, 09:41, Anders Mjos, Conditioning Station, Maintenance, TM2, , Water leak found at the isolation transforer 


    
        
            Anders Mjos wrote:
        
        
            
             The level dropped below 15 in over the weekend. MP2 stopped, but MP3 condtinued pumping.
       Reply  Monday, December 15, 2014, 12:53, Anders Mjos, Conditioning Station, Maintenance, TM2, , TCSTK2 topped up 


    
        
            Anders Mjos wrote:
        
        
            
            
            
       Reply  Monday, December 15, 2014, 13:25, Anders Mjos, Conditioning Station, Maintenance, TM2, , BIASSW1 temperature and flow removed from interlock chain 


    
        
            Anders Mjos wrote:
        
        
            
            
            
Entry  Monday, December 08, 2014, 15:22, Anders Mjos, Conditioning Station, Development, TM2, , Circuit D water test TCS_Heater_Transmission_Power.xlsxCircuit_D_test_results_for_TM2_status_meeting_2014-12-11.pdfHeated_water_leak_test_plan.pdfHeated_water_leak_test_Circuit_D_RESULTS.docx
Monday, December 08, 2014, 14:00: Dan M and Anders connected the water supply to circuit D and installed the module cover.
Monday, December 08, 2014, 14:50: Circulating water on circuit D. IG1 vacuum stable at 3.1E-7 T. No response on mass 18 on RGA
Monday, December 08, 2014, 15:30: Test TGHT and TBHT PS. Can be switched on, but set points need to be corrected.
Entry  Friday, December 05, 2014, 13:46, Anders Mjos, Conditioning Station, Development, TM2, , Not able to start water system 
 TCS:WPV1 does not open when staging is enabled. Multiple attempts have been made, but the valve remains closed.
    Reply  Monday, December 08, 2014, 13:52, Anders Mjos, Conditioning Station, Development, TM2, , Fixed - Not able to start water system 


    
        
            Anders Mjos wrote:
        
        
            
             TCS:WPV1 does not open when staging is enabled. Multiple attempts have been made, but the valve
Entry  Friday, December 05, 2014, 15:41, Anders Mjos, Conditioning Station, Development, TM2, , RGA results 2014-12-05-14-25_TM2.png2014-12-05-14-25_TM2.txt
Measurement taken at 14:25. IG2 at ~7.7E-6 T
Entry  Friday, December 05, 2014, 11:58, David Wang, Conditioning Station, Development, TM2, , helium pressure test on TM2 tube heater +(D) water lines. 6x
At CS, The leak detector is hooked directly to the TM2 top service cap. The base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4torr. Applied 80 psi helium
to TM2 tube heater +(D) line . During 3 minutes applying time , I did  not see any tiny change on LD readings. The line is perfectly vacuum sealed. 
See attachment pictures.
Entry  Friday, December 05, 2014, 07:47, David Wang, Conditioning Station, Development, TM2, , TM2 at CS 
The pumping down on TM2 at CS was good overnight. However, the back up line pressure is still too high for LD to get to 0.0-E-9atm.cc/sec . It only could
get to 1.2xE-7 atm.cc/sec. It is not enough for a good leak check . I dont want to have any ambiguous situation on this" D" line leak check.
So,I am going to reconfigure the leak detector to the spare KF25 pot on the TM2 service cap. All pumps are stopped . The CS and TM2 will be vented soon.
Entry  Thursday, December 04, 2014, 16:37, David Wang, Conditioning Station, Development, TM2, , connected TM2 and CS vacuum system . 
I connected TM2 and CS vacuum system. All vacuum pumps on TM2 and CS are started .The pumping down is good so .far
Entry  Thursday, December 04, 2014, 09:57, Travis Cave, Spent Target Vault, Standard Operation, , , Spent target placed in F-308. 
Spent targets in the mini storage were placed into the F-308s yesterday, all F-308 have been removed from the the target hall and they no reside for
the time being in the hallway between the north and south hot cells.
Entry  Thursday, December 04, 2014, 09:54, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical check TM2_elec_check_no_source_traySHC.PDF
Results of electrical check of TM#2 with no source tray and no containment box attached. See PDF for results.
Entry  Thursday, December 04, 2014, 09:49, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, module move 
TM#2 has been moved from the south hot cell to the conditioning station.
Entry  Tuesday, December 02, 2014, 13:33, David Wang, South Hot-Cell, Development, TM2, , Leak check on TM2 tube heater +(D) at SHC 2014-12-02_003.JPG2014-12-02_001.JPG2014-12-02_004.JPG
Chad and I leak checked TM2 tube heater+(D) circuit at SHC with water bypass loop and new seals installed on the water block. The LD base LR 0.0xE-9
atm.cc/sec,base pressure0.0xE-4 torr. Chad sprayed helium on the leak check area in SHC for 5 seconds. No any response has been found on LD during 1minutes
waiting time. The test was repeated again and the result is same. NO LEAK at this stage!  After the TM2 is moved to CS , The D line will be pressured
Entry  Tuesday, December 02, 2014, 10:15, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Reburb. Loop Install TM2_20141202_01.jpg20141203_142215.jpg20141203_143530.jpg
Final polish, clean with methanol and clean compressed air.
Loop installed and torqued to 90 in lbs.
Minimum of approximately 1"  between loop and containment box at closest point.
Entry  Monday, December 01, 2014, 14:48, Travis Cave, Spent Target Vault, Standard Operation, , , F-308s moved 
The F-308s have been moved into the target hall,  for filling on wednesday.