  1881   Tuesday, March 05, 2019, 07:20 David WangConditioning StationRepairTM2 TM2 HV test at TCS

Spark between HV cover vertical mesh plate and HS 60KV  bias connecting clamp 90degree angle at 55 KV on TM2 top. HV cover is removed to test above  55KV. The spark triggered TH and SHC ventilation secondary alarm.

  1884   Thursday, March 07, 2019, 09:12 David WangConditioning StationStandard OperationTM2 TM2 move from TCS to SHC.

TM2 has been moved from TCS to SHC. The move is smooth.

  1893   Monday, March 18, 2019, 07:23 David WangConditioning StationRepairTM2 TM2 window line helium test

New seals with a blank off cap are installed on TM2 window line water block.   The seals are checked at TCS with 70 psi helium for 5 minutes with LD at 0.0xE-9atm/cc.sec. No response on LD during test. Seals are good.

  1894   Monday, March 18, 2019, 07:25 David WangConditioning StationMaintenanceTM3 TCS vacuum pumps have been stopped.

 The TCS will be vented soon for TM2 move.

  1901   Thursday, March 28, 2019, 10:27 David WangConditioning StationRepairTM2dummy febiad test targetTM2 new source tray helium pressure test at TCS.

Helium pressure test on TM2 all water circuits is done. 70 psi helium , 10 minutes test time. Leak detector :base leak rate 0.0XE-9 atm.cc/sec, base pressure 0.0Xe-4torr. No any response on LD during the test. All TM2 water circuit are leak free.

  1920   Monday, May 13, 2019, 11:22 David WangITWRepair  ITW entrance module has been connnected.

Entrance module has been connected back to ITW. Everything is normal.

  1927   Wednesday, May 22, 2019, 11:50 David WangITEStandard OperationTM4 TM2 has been connected in ITE.

TM2 has been connected in ITE. high active water system and vacuum pumps are started. The pumping down on TM2 and ITE is good  so far.

See attachment for connection checklist.

  1928   Wednesday, May 22, 2019, 11:52 David WangConditioning StationMaintenanceTM1 TM1 inpsection.

TM1 shielding plates and their holding bolts are inspected. No corrosion.  TM1 is located at TCS now. Both TP1 and TP2 are started.

  1932   Tuesday, June 04, 2019, 08:46 David WangITEStandard OperationTM2 ITE water signal interlock check.

ITE water signal interlock check is done. Everything is good. Coil 2   circuit no longer used in ITE . PQRU are looped as one circuit fro coil 1 circuit on Module since now.

  1935   Friday, June 07, 2019, 13:11 David WangConditioning StationDevelopmentTM4 TCS and TM4.

TM4 has been connected at TCS for HV test. TCS water system and vacuum pumps are switched on.

  1942   Thursday, June 13, 2019, 10:55 David WangConditioning StationRepairTM4 TM4 HV test at TCS without source tray.

I brought up TCS bias to 57.5 KV on TM4 without source tray at TCS. It was kept at this level about 1.0 hours. Some intermediate sparks. No spark trip on devices. 57.5KV is very close to the HV up limit of this module.

  1943   Friday, June 14, 2019, 08:15 David WangITEStandard OperationTM2 5 shielding blocks are moved to ITE.

ITE is configured to take proton beam.

  1945   Friday, June 21, 2019, 07:16 David WangSouth Hot-CellDevelopmentTM4 TM4 new source tray leak check at SHC.

New source tray was installed on TM4 yesterday. LD was used to pump down all water lines. Tube heater +D circuit has a big leak  around water block area. At base LR5.5 XE-5 atm.cc/sec, base pressure 170 mtorr, When Chad  moved this helium probe close to  water block area, The leak rate on LD went to maximum level right away. When the probe was moved out of water block area, the LR went back to base level. The test repeated again with same result. Also, Before helium spray test, I applied 80 psi air into the circuit. The air pressure can not be held in the circuit. The pressure drop on the line is quick. This shows a big leak on  D line as well. The rest water lines are fine. I pumped all of them down to LD bottom scale without problem. Chad and I helium sprayed window and MSP water blocks. No leak has been found.  The only line we have problem is the D line.

D line is still leak after repair and installation. We suspected the c-seals issue on this module. So, all water lines have been sprayed with helium for leak check.  Found "B" line target oven negative  is also leak. The rest line are good on helium spray leak check.  The further investigate on thi issue is taken place now.

  1950   Monday, July 15, 2019, 13:29 David WangConditioning StationDevelopmentTM4 Vacuum surge when TM4 B line iwas supplied with water.

Yesterday, TM4 B line was supplied with water at TCS for testing.  TCS: IG1 and IG2 had big response on it. See attachment. The water was disconnected right away, and line was purged. Vacuum recovered after overnight pump.

  1953   Friday, July 26, 2019, 11:28 David WangSouth Hot-CellStandard OperationTM4 TM4 move from SHC to TCS.

Tm4 has been moved from SHc to TCS without containment box. It is a new source tray on TM4.  A layer of plastic sheet was put on TH floor on module pass route during the move.

  1954   Friday, July 26, 2019, 11:41 David WangSouth Hot-CellStandard OperationTM4 TM4 with spare target electrical check and leak check.

Electrical check on TM4 with spare test target. PQ is still shorted to RU. But, The short between 60KV bias and PQRU which we found last time is gone.  Target to PQRU at 250V mega measurement: 22.08 M. All conductivity between ABCD are about 5.0 m ohm which are good. All other ohm meter and Mega measurements are OL. Helium spray leak check on HS target VCR fittings is passed. Two blank offs are installed on source tray window cool lines. They passed  leak checked at SHC as well. 

  1961   Wednesday, August 14, 2019, 08:55 David WangITEStandard OperationTM2 TM2 has been disconnected in ITE.

TM2 has been disconnected in ITE. The bias jumper between U and T was burned out during the last beam time.

  1965   Friday, August 16, 2019, 08:46 David WangITEStandard OperationTM4ZrC #8.TM2 has been connected in ITE.

TM2 has been connected in ITE. turbo pumps have been started. ITE  and TM2 vacuum are good.

  1966   Friday, August 16, 2019, 08:51 David WangConditioning StationRepairTM4 TM4 waterlines helium pressure test at TCS.

LD base leak rate, 0.0Xe-9atm.cc/sec. Helium pressure, 70psi. 5 minutes each circuit. No response on all water line except containment box window which has a VCR leak issue now. Window line leak rate, 2.3Xe-4 atm.cc/sec.

  1967   Friday, August 16, 2019, 08:52 David WangConditioning StationStandard OperationTM4 TM4 is moved from TCS to SW silo.

TM4 is moved from TCS to SW silo this morning. The move is good.