1692
|
Wednesday, March 07, 2018, 10:18 |
David Wang | ITW | Standard Operation | | | Oil leak on target station vacuum primary back pump. |
I can not see oil in sight window of the primary pump during visual inspection. The aluminum tray underneath the pump is filled with oil. The performance on this pump start to drop by watching ITH CG4 reading. A fault report with suggestion is issued to vacuum group. Everything on secondary pump looks fine. |
1693
|
Wednesday, March 07, 2018, 10:36 |
David Wang | ITE/ITW Cooling | Development | | | HALCW resin can flow meter replacment |
HALCW resin can flow meter replacement is done. Less that 100 mL water was drained to a small tray during the job. RPG checked the water. Less than 20 counts. Water are dumped the high active sump. The HALCW MP1 is started. No leak on new gauges and fittings. Old gauge is labeled , bagged, and stored in TH. |
1694
|
Thursday, March 08, 2018, 14:10 |
David Wang | ITW | Maintenance | | | Two small water leak has been found in ITW. |
Two small water leaks have been found on ITW High active water system. One is from an unused 1/4" copper valve stem. another is on supply 1.5" supply line valve body top sealing. Both of them are seeping water from seal. 1/4" copper valve will be replaced with a new one. 1.5" supply line valve will be replaced by an old valve with all new seals. I have all spare parts in hand. At present, water supply to ITW are stooped to reduce leak rate. Two aluminum flat tray are put underneath leak valves to hold small amount leak water. Both leak will be fixed in April mostly. |
1696
|
Thursday, April 05, 2018, 11:29 |
David Wang | ITW | Maintenance | | | ITH MP1 replacement |
ITH MP1 is replaced today with a new style pump.The new pump is 0.75 inch higher than old pump on inlet and exhaust so a new solid inlet adapter (KF50-25) has to been used. For future secondary pump ITH MP1S replacement, we need a new adapter 0.75 inches shorter as well. The new pumps is started . Everything works fine. Old pumps is drained , bagged, and stored in TH B2 level. All radioactive garbage produced during the job are bagged , tagged, and stored in TH as well. |
1697
|
Monday, April 09, 2018, 06:36 |
David Wang | ITW | Standard Operation | | | ITW Turbo -pumps switch off |
I asked MCR to switch off ITW TP3,4 TP1s,2s this morning. |
1701
|
Tuesday, April 17, 2018, 11:05 |
David Wang | ITW | Repair | | | Disconnect ITW entrance module |
ITW entrance module has been disconnected. All connections are labelled before or during disconnection. The 24VDC electrical plug on ITW TP1S is broken . It will be replaced with a new plug. The lift yoke is installed onto module without difficulty. |
1710
|
Friday, May 04, 2018, 11:21 |
David Wang | ITW | Repair | | | 2A2 winodw leak check in TH |
Anders and I leak checked new 2A2 window seal on ITW side. Leak detector was connected to ITW TP4. Base leak rate 0.0Xe-9 atm.cc/sec. base pressure 0.0xe-4 torr. Sprayed 15-20 psi directly underneath 2A2 window by using exist 2a2 window leak check copper tube. The leak detector got response in 5 seconds when helium was applied. the leak rate was 5xe-6 atm.cc/sec. Once the helium source was closed, the leak rate dropped quickly back to base level. To confirm the leak is at window , I sprayed 15 psi helium around all top flange seals of TM and entrance module. There was no direct response during the spray( about 1.5- 2 minutes). There was a weak slow up response (up to 1.0 xe-7 atm.cc/sec) which was started after 1.5 minutes of spray. The weak response is cause by helium drift in my view. Our conclusion is the 2A2 window seal on ITW side is not perfectly sealed. The elak we saw on LD is ture , and it is located on window. The station will be vented soon for shielding plug moving back. . |
1712
|
Wednesday, May 09, 2018, 08:48 |
David Wang | ITW | Repair | | | 2A2 winodw leak check on ITW vacuum vessel. |
Leak detector is connected to ITW TP4. LD Base leak rate 0.0XE-09 atm.cc/sec. Helium line is connected to existing window leak check 1/8 " copper tube. Applied 18psi helium for 1 minute. No response on LD. The window seal is good on ITW vacuum vessel. |
1714
|
Tuesday, May 15, 2018, 10:21 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Tm4 water circles helium pressur test result |
Helium pressure test on TM4 water lines is done this morning. 70 psi helim , 1 minutes time to each circle. The result:
A(oven+): 0.00xE-9 atm.cc/sec
B(Oven -): 8.1Xe-7 atm.cc/sec
C(tube -): 0.00xE-9 atm.cc/sec
D(tube+): 1.0xE-5 atm.cc/sec
PQ(coil 2): capped on top. water lines were removed because of leak
RU(Coil1): 0.00xE-9 atm.cc/sec
EE: 0.00xE-9 atm.cc/sec
MSP: 0.00xE-9 atm.cc/sec
HS: No target, capped on top. It was fine on last target check in 2017 Oct.
window: Capped on top. Containment box is not installed.
The leak check on D line caused the IG1 small response during test.
B and D circle are double checked. The reasults are same.
D line leak is in E-5 atm.cc/sec range. It is possible to locate it by using helium spray method in SHC. The containment box is not on so it should be easy to do it.
Switch on IGA gauge at TCS and apply helium and water at certain psi to check the IGA response may give us more information on these leaks.
All lines were test in last year shut down. They were good.
|
1717
|
Friday, May 18, 2018, 09:34 |
David Wang | Conditioning Station | Repair | TM4 | | water leak on TM4 Tube heater - B line confirmed. |
At 8:50 AM today, I applied water to TM4 tube heater - (B) line at TCS. All high vacuum gauges got response on this action. Water is leaking through B line on TM4.
It should be D line . David 2018-06-05 |
Attachment 1: TM4_2018-05-18_Water_Leak.docx
|
1726
|
Wednesday, May 30, 2018, 09:51 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 water lines helium pressure test at TCS. |
I did a helium pressure test on TM2 water lines at TCS. We will remove the TM2 source tray soon so this test is a reference check for future new source. The result:
Helium 70 psi, 2 minutes to each circiut. Leak detector base LR.0.0x e-9atm.cc/sec, base pressure 0.0x e-4torr
Ta+(A) 0.0x e-9atm.cc/sec
Ta-(B) 0.0x e-9atm.cc/sec
Tu-(C) 7.8x e-7 atm.cc/sec
Tu+(D) 3.5x e-7 atm.cc/sec
Coil 2(PU) 0.0x e-9atm.cc/sec
Coil 1(RU) 0.0x e-9atm.cc/sec
EE 8.2 x e-9atm.cc/sec
MSP 0.0x e-9atm.cc/sec
Containment box window 0.0 xe-9atm.cc/sec
HS no target and opened. No test.
All water lines on module side in TM2 should be in good condition according to this test . The leak response we found on B and C lines are from water block seals mostly. |
1727
|
Wednesday, May 30, 2018, 09:55 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 and TCS vacuum pumps are switched off. |
I switched off TM2 and TCS vacuum pumps. The TCS and TM2 will be under vacuum without pumping. |
1737
|
Thursday, June 14, 2018, 11:37 |
David Wang | ITE | Standard Operation | TM4 | UC#22 | TM4 UC 22# checklist. |
See attachments |
Attachment 1: TM4_UCx_22#_check_list.pdf
|
|
1749
|
Tuesday, July 03, 2018, 14:38 |
David Wang | ITW | Standard Operation | | | ITW water signals interlock check. |
Annual ITW water signals interlock check are done. Everything works good. |
1750
|
Tuesday, July 03, 2018, 14:42 |
David Wang | ITW | Standard Operation | TM2 | Nb#8 | TM2 has been connected to ITW. |
TM2 has been connected to ITW. All turbo pumps are started. See attachment for connection checklist. |
Attachment 1: Nb#4_Module_connection_checklist.pdf
|
|
1764
|
Thursday, August 02, 2018, 07:57 |
David Wang | Conditioning Station | Standard Operation | | | Leak check on TM2 UCx #23 @ TCS and SHC. |
I did a helium pressure test on TM2 HS line at TCS. At 70psi helium, the leak rate is 2.5 xE-7 atm.cc/sec. I think this is the number that close to result before which is 1.7xE-9 atm.cc/sec. WE know there is a small leak on this water block seal. Chad and I did helium spray check yesterday at SHC. It was good at bottom scale. No much worry on this low E-7 range leak. |
1770
|
Tuesday, August 28, 2018, 14:19 |
David Wang | ITE | Standard Operation | TM4 | Ta#56 | TM4 Ta#56 disconenction. |
TM4 has been disconnected in ITE this morning. See attachment. |
Attachment 1: TM4_Ta#56_disconnection..pdf
|
|
1771
|
Thursday, August 30, 2018, 07:42 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been connected to TCS. |
TM4 has been connected to TCS. vacuum system and water system are started. Everything looks fine. |
1772
|
Thursday, August 30, 2018, 07:46 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 HS line leak check at TCS and SHC. |
Chad and I leak checked TM4 HS line after UCx 24 is installed. No leak at 5xE-9atm.cc/sec. Today, I did helium pressure test on HS line at TCS. No leak at 70 psi helium 0.0xE-9 atm.cc/sec. |
1775
|
Tuesday, September 04, 2018, 08:18 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 24# | Stppped TM4 and TCS vacuum and water system at TCS. |
I stopped TM4 and TCS vacuum system at TCS. TCS and TM4 is venting with argon now. |