ID Date Author Categorydown Type Module Target/Number Subject
  2100   Thursday, June 11, 2020, 11:49 David WangITEMaintenance  ITW and ITE thermocouple status.

  ITW - 2A2

o    2A2DSP-TC3 - not connected in El room

o    2A2COL-TC2 - does not work inside module

o    2A2COL-TC3 - does not work inside module

·         ITE - 2A3

o    2A3COL-TC3 - works, but plug needs repair in ITE pit

 Anders and I checked ITW and ITE thermocouple status. See result above.  Frank and I will fix the 2A3COL-TC3 loose cable to plug issue.

  2107   Thursday, June 18, 2020, 13:25 David WangITEStandard OperationTM4P2N test.Disconnect TM4 in ITE.

TM4 has been disconnected in ITE. Vacuum pumps and gauge are not disconnected yet.

  2108   Friday, June 19, 2020, 11:21 David WangITERepairTM4P2N test.ITE TP3 is replaced.

ITE TP3 is replaced. ITE is under vacuum again. All turbo pumps are started successfully. Current draw on pumps are normal so far.

  2113   Monday, June 29, 2020, 10:09 David WangITEStandard OperationTM4P2N test.ITE turbo pumps are stopped

ITE venting is in processing.

  2119   Friday, July 03, 2020, 14:08 Travis CaveITEStandard OperationTM4UC#30Module move

 TM#4 with UC#30 has been moved from the south hot cell to the east target station.

  2120   Monday, July 06, 2020, 07:54 David WangITEStandard OperationTM4UCx 30TM4 has been connected in ITE connection

TM4 has been connected in ITE. Vacuum pumping down is good so far.

Attachment 1: Tm4_UCx_30_connection_checklist.pdf
Tm4_UCx_30_connection_checklist.pdf Tm4_UCx_30_connection_checklist.pdf Tm4_UCx_30_connection_checklist.pdf Tm4_UCx_30_connection_checklist.pdf
  2123   Tuesday, July 07, 2020, 17:43 Carla BabcockITEDevelopmentTM4 RF tests on new IG-LIS wiring

Tested RF from RF driver into new IGLIS wires at ITE. Used 5V, 1MHz (2MHz setting because of internal halving issue).

As expected there was a very slight mismatch visible (original cable ~ 68 Ohms, new cable ~ 53 Ohms).

The matching resistor will be changed and it will be retested.

  2149   Tuesday, September 29, 2020, 12:12 David WangITERepairTM4 TM4 steerers staus after" left " grounding issue, and first stage investigation

Left (short) is switched with bottom. So on module:

"Top" is still top.

"Left" is bottom in module actually

"Bottom and Right" is Left and right in module actually.

 For the connection in ITE:

Left  cable is connected to "left" ( bottom  in module actually)

Top cable is connected to " Bottom and Right"( left and right in module actually)

Bottom and Right cable is connected to "Top" which is top in module.

Frank and I removed the panel, disconnected the "Left"cable  inside panel,  and checked  cable to ground resistance. "Left "is dead short to ground on ohmmeter check still. So the short could be on cable or inside source tray.  Further investigation is planned to confirm the short  location.

  2150   Tuesday, September 29, 2020, 12:29 Travis CaveITEStandard OperationTM4UC#31Module move

 Module move of TM#4 with UC#31 was finished to today at around 10:30AM.

  2153   Tuesday, October 13, 2020, 10:16 Travis CaveITERepairTM4UC#31Module move

 TM#4 is now in the south hot cell from the east target station.

  2154   Thursday, October 15, 2020, 12:48 Travis CaveITEStandard OperationTM4UC#31Module move

 TM#4 is now back in the east target station.

  2162   Thursday, November 05, 2020, 10:48 Travis CaveITEStandard OperationTM4Ta#61Module move

 TM#4 with Ta#61 has been moved from the south hot cell to the east target station.

  2176   Wednesday, January 06, 2021, 10:39 David WangITEStandard OperationTM4 ITE and TM4 annual leak check.

Frank and I finished ITE and TM4 primary and secondary  vacuum vessel  leak check. LD bease leak rate 0.0x-9atm.cc/sec. No leak has been found.Also, All TM4 water lines  have been pressurized with 70psi helium fro 3 minutes on each circuit. All water lines in TM4 are good. No resopne on LD during test. 

  2180   Friday, January 22, 2021, 12:34 David WangITEStandard Operation  ITE HV test.

ITE annual HV test is done. No module in station. The bias power supply has been ramped up to 49KV on control page. We still have voltage limit issue on this PS at 48KV so it only can go to 47.7 KV on PS panel. No major spark during test.. The test result is same as last year test which was did in March 2020. 

  2187   Friday, February 12, 2021, 07:07 David WangITEMaintenance  ITW and ITE clean up.

Vacuum cleaned ITW and ITE station. 

  2189   Thursday, February 18, 2021, 12:33 David WangITERepair  ITE:TP1S

ITE TP1S new pump is installed today. Reset pump life time on controller to 0 hr.

  2192   Thursday, February 25, 2021, 10:09 Frank SongITERepair  Disconnect Entrance Module in ITE

 David and I disconnected entrance module in ITE by following the procedure # 190510. And, the yoke was installed and left on for remote handling later. 

  2198   Thursday, March 11, 2021, 11:42 Frank SongITEMaintenance  ITE water flow wheels and coils replacement.

 ITE water flow wheels and coils are replaced. Wheels and coils on Oven, Tube, HS, EE, MSP, Febiad coil, containment box window, dump, dump plug, 2A window, and tank return circuits are replaced with new parts.

  2201   Wednesday, March 17, 2021, 09:10 Travis CaveITEStandard Operation  Entrance module move

 The east entrance module is now back at the east target station.

  2202   Wednesday, March 17, 2021, 11:43 Frank SongITERepair  Re-connect Entrance Module in ITE

 David and I re-connect Entrance module at ITE after the monitor been replaced at SHC. 

Attachment 1: job_done_by_following_#190510.pdf
job_done_by_following_#190510.pdf job_done_by_following_#190510.pdf job_done_by_following_#190510.pdf job_done_by_following_#190510.pdf job_done_by_following_#190510.pdf job_done_by_following_#190510.pdf job_done_by_following_#190510.pdf job_done_by_following_#190510.pdf