Entry  Thursday, September 20, 2012, 08:45, Travis Cave, Conditioning Station, Standard Operation, TM1, Nb#7, Electrical check TM1_Nb7_Elec_chk_CS.PDF

Electrical check was done at the conditioning station this morning results are on the attached PDF.

Entry  Thursday, September 20, 2012, 09:16, David Wang, Conditioning Station, Standard Operation, TM1, Nb#7, TM1 Nb#7 target heat shield helium pressure check is done. 

Leak detector pumped down to base LR1.3xE-9 atm.cc/sec, and BP 8xE-3 torr. All high vacuum gauge readings at CS and TM1 are at low -6 range from 1.2xE-6torr to 4.6x E-6 torr. Applied 80 psi helium  to heat shield circuit for 5minutes and there is no any response on leak detector. The heat shield circuit is leak tight.

Entry  Tuesday, September 25, 2012, 10:34, Travis Cave, ITW, Standard Operation, TM1, Nb#7, module move 

TM#1 with Nb#7 moved from the conditioning station to the west target station. Move went well.

Entry  Tuesday, September 25, 2012, 14:33, David Wang, ITW, Standard Operation, TM1, Nb#7, TM1connected in ITW 

TM 1 is in ITW now. All connections are done. The turbo pumps had been started this afternoon. The vacuum looks good so far. The water interlock check which related to TM1 are done. They are good. All TM1 water signals are visually checked and they are strong.  The rest interlock check ( MCR XT page) will be finished before shielding blocks moving. The MAA is locked and ITE is ready for proton beam.        

Entry  Tuesday, October 02, 2012, 11:47, David Wang, ITW, Standard Operation, TM1, Nb#7, I moved 5 shielding blocks from ITE to ITW. 

5 shielding blocks have been moved from ITE to ITW. ITW is configured to take proton beam now.

Entry  Tuesday, November 06, 2012, 11:06, Travis Cave, ITW, Standard Operation, TM1, Nb#7, module move 

TM#1 with Nb#7 has been moved from the west target station to the south hot cell move went well.

Entry  Tuesday, November 06, 2012, 11:34, chad fisher, South Hot-Cell, Standard Operation, TM1, , Nb#7 Removal IMG_0797[1].JPGIMG_0798[1].JPGIMG_0799[1].JPG

Attached are pre-removal pictures of NB#7 and the inside face of the containment box cover before cleaning.

Entry  Tuesday, November 06, 2012, 12:08, David Wang, ITW, Standard Operation, TM1, Nb#7, TM1 disconnected in ITW 

Bevan and I disconnected TM1 in ITW this morning. The TM1 was moved to south hot cell later.   

Entry  Tuesday, November 06, 2012, 14:00, chad fisher, South Hot-Cell, Standard Operation, TM1, TiC#3, TiC#3 Installed 

TiC#3 sucessfully installed and ready for leak and electrical check.

Entry  Wednesday, November 07, 2012, 09:25, Travis Cave, South Hot-Cell, Standard Operation, TM1, TiC#3, Electrical check TM_1_TiC_3_Elec_check_SHC.PDF

TM#1 with TiC#3 target has had the electrical performed on it. See attached PDF for details.

Entry  Wednesday, November 07, 2012, 10:25, Travis Cave, Conditioning Station, Standard Operation, TM1, TiC#3, module move 

TM#1 with TiC#3 has been moved from the south hot cell to the conditioning station, move went well.

Entry  Wednesday, November 07, 2012, 11:09, David Wang, South Hot-Cell, Standard Operation, TM1, TiC , TM1 heat shield circuit leak check with TiC target at hot cell 

Chad and i did a leak check on TM1(Lp-TiC) heat shield water circuit at south hot cell. There is no leak had been found on it. The circuit  is leak tight at present. I will do  helium pressure check on this circuit at  conditioning station once the vacuum is good enough.

Entry  Thursday, November 08, 2012, 08:42, David Wang, Conditioning Station, Standard Operation, TM1, TiC #3, TM1 TiC #3 target heat shield helium pressure check is done. 

TM1 TiC #3 target  heat shield  helium pressure check  is done at conditioning station. Applied 80 psi helium to HS circuit for 5 minutes . There is no response had been found on leak detector. The leak detector base LR 0.0x E-9 atm.cc/sec, and BP 0.0xE-4 torr. CS and TM1 vacuum are at low E-6 torr range. The HS circuit is leak tight.

Entry  Thursday, November 08, 2012, 09:37, chad fisher, South Hot-Cell, Standard Operation, TM1, Nb#7, Nb#7 Autopsy 

Nb#7 was dismantled and ready for inspection.

Entry  Friday, November 09, 2012, 09:20, Travis Cave, Conditioning Station, Standard Operation, TM1, TiC#3, Electrical check TM_1_TiC_3_Elec_check_CS_Vac.PDF

Electrical check performed on TM#1 with TiC#3 at the conditioning station under vacuum. See PDF for details.

Entry  Tuesday, November 13, 2012, 10:55, Travis Cave, ITW, Standard Operation, TM1, TiC#3, module move 

TM#1 with TiC #3 moved from the conditioning station to the west target station,  move went well.

Entry  Wednesday, November 14, 2012, 10:57, David Wang, ITW, Standard Operation, TM1, , TM1connected in ITW 

I connected TM1 in ITW yesterday. Everything is good so far. Travis was with me when i did the job.

Entry  Wednesday, January 02, 2013, 12:11, David Wang, ITW, Standard Operation, TM1, , I moved 5 shielding blocks from ITW to block storage area 

I moved 5 shielding blocks from ITW  to block storage area for preparing the TM1 disconnection. Air sampled and swiped blocks and ITW and everything is fine.Fiona was with me all the time during the moving.

Entry  Thursday, January 03, 2013, 10:05, David Wang, ITW, Standard Operation, TM1, , Disconnected TM1 in ITW. 

TM1 has been disconnected in ITW. All  water lines had been purged. Travis was with me during the job.

Entry  Tuesday, January 08, 2013, 08:48, Travis Cave, South Hot-Cell, Standard Operation, TM1, TiC#3, Electrical check TiC#3_Elec_Check_Post_beam.PDF

TM#1 with TiC #3 post beam. See attached PDF for results.