422
|
Monday, August 19, 2013, 10:08 |
Anders Mjos | ITE | Repair | TM4 | SiC#29 | Leak Check | All water circuits except Coil 1 were leak
checked by David and Anders. No obvious signals
were detected except some small possible |
|
451
|
Thursday, September 12, 2013, 09:29 |
Travis Cave | ITW | Standard Operation | TM4 | SiC#29 | module move | TM#4 with SiC#29 has been moved to the
south hot cell move went well. |
|
452
|
Thursday, September 12, 2013, 10:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check | TM#4 with SiC#29 post beam electrical check
in the south hot cell see PDF for details. |
|
454
|
Friday, September 13, 2013, 08:05 |
David Wang | South Hot-Cell | Repair | TM4 | | TM4 coil 1 leak check in SHC | Leak checked TM4 coil1 in SHC with Isaac
. The leak detector only can pump down to
1.5xE-7 atm.cc/sec. The leak detector got |
|
479
|
Monday, September 30, 2013, 15:59 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Module move from SW Silo to SHC | TM4 was move by myself and Grant.
Move went smoothly, no hang ups. |
|
483
|
Tuesday, October 01, 2013, 10:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check | TM#4 with SiC#29 electrical check post
beam see pdf for details. |
|
486
|
Wednesday, October 02, 2013, 13:44 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | | Right Coil is leaking | Today Maico and Travis completed
and electrical test to determine the right
and left coil on TM4. The left coil is the |
|
487
|
Wednesday, October 02, 2013, 14:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check | Electrical check done on TM#4 with no target,
see PDF. |
|
488
|
Thursday, October 03, 2013, 10:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target has been moved from
the south hot cell to the south west silo. |
|
498
|
Tuesday, October 08, 2013, 14:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target was to be moved today
but the move was aborted when the crane failed
to move in the East - West direction. The |
|
500
|
Tuesday, October 08, 2013, 18:12 |
Grant Minor | Crane | Repair | TM4 | | Target Hall Crane Stuck in East-West Direction - Update | Grant Minor wrote this e-mail today:
***
Hello all, |
|
501
|
Wednesday, October 09, 2013, 19:33 |
Grant Minor | Crane | Repair | TM4 | | Target Hall Crane not operational - likely controls / PLC hardware failure (not stuck wheel) |
|
|
504
|
Wednesday, October 16, 2013, 10:12 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target has been moved from
the south west silo to the south hot cell. |
|
506
|
Thursday, October 17, 2013, 10:24 |
chad fisher | South Hot-Cell | Repair | TM4 | | Coil Line Removal | The containment box was removed from TM4
earlier this morning in preparation for removal
of the C2 circuit water lines, their |
|
509
|
Friday, October 18, 2013, 13:43 |
chad fisher | South Hot-Cell | Repair | TM4 | | C2 Circuit Removal | The C2 circuit (coil 2) water lines and
blocks have been revoed from TM4.
Water block jig could not be used |
|
510
|
Friday, October 18, 2013, 14:33 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | | Module move | TM4 without a source tray was moved
from the SHC to the TCS. All went well. |
|
511
|
Friday, October 18, 2013, 14:37 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Roughing Started | The roughing pump has been started. |
|
512
|
Friday, October 18, 2013, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check | With the coil line removed an electrical
check was done on TM#4 at the South Hot Cell
see attached pdf. |
|
513
|
Friday, October 18, 2013, 15:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Turbo Pumps are on | The Turbo pumps are now running on
TCS |
|
514
|
Monday, October 21, 2013, 10:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Cooling On and Electrical Connections Made | The electrical connection have been
made and cooling package was started at ~10:50am
today |
|