188
|
Tuesday, September 25, 2012, 14:33 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | TM1connected in ITW | TM 1 is in ITW now. All connections are
done. The turbo pumps had been started this
afternoon. The vacuum looks good so far. |
|
190
|
Tuesday, October 02, 2012, 11:47 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | I moved 5 shielding blocks from ITE to ITW. | 5 shielding blocks have been moved from
ITE to ITW. ITW is configured to take proton
beam now. |
|
202
|
Tuesday, November 06, 2012, 11:06 |
Travis Cave | ITW | Standard Operation | TM1 | Nb#7 | module move | TM#1 with Nb#7 has been moved from the
west target station to the south hot cell
move went well. |
|
203
|
Tuesday, November 06, 2012, 11:34 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | | Nb#7 Removal | Attached are pre-removal pictures of NB#7
and the inside face of the containment box
cover before cleaning. |
|
204
|
Tuesday, November 06, 2012, 12:08 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | TM1 disconnected in ITW | Bevan and I disconnected TM1 in ITW this
morning. The TM1 was moved to south hot cell
later. |
|
205
|
Tuesday, November 06, 2012, 14:00 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | TiC#3 | TiC#3 Installed | TiC#3 sucessfully installed and ready for
leak and electrical check. |
|
206
|
Wednesday, November 07, 2012, 09:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TiC#3 | Electrical check | TM#1 with TiC#3 target has had the electrical
performed on it. See attached PDF for details. |
|
207
|
Wednesday, November 07, 2012, 10:25 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | TiC#3 | module move | TM#1 with TiC#3 has been moved from the
south hot cell to the conditioning station,
move went well. |
|
208
|
Wednesday, November 07, 2012, 11:09 |
David Wang | South Hot-Cell | Standard Operation | TM1 | TiC | TM1 heat shield circuit leak check with TiC target at hot cell | Chad and i did a leak check on TM1(Lp-TiC)
heat shield water circuit at south hot cell.
There is no leak had been found on it. The |
|
209
|
Thursday, November 08, 2012, 08:42 |
David Wang | Conditioning Station | Standard Operation | TM1 | TiC #3 | TM1 TiC #3 target heat shield helium pressure check is done. | TM1 TiC #3 target heat shield
helium pressure check is done at conditioning
station. Applied 80 psi helium to HS circuit |
|
210
|
Thursday, November 08, 2012, 09:37 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Nb#7 Autopsy | Nb#7 was dismantled and ready for inspection. |
|
211
|
Friday, November 09, 2012, 09:20 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | TiC#3 | Electrical check | Electrical check performed on TM#1 with
TiC#3 at the conditioning station under vacuum.
See PDF for details. |
|
213
|
Tuesday, November 13, 2012, 10:55 |
Travis Cave | ITW | Standard Operation | TM1 | TiC#3 | module move | TM#1 with TiC #3 moved from the conditioning
station to the west target station,
move went well. |
|
214
|
Wednesday, November 14, 2012, 10:57 |
David Wang | ITW | Standard Operation | TM1 | | TM1connected in ITW | I connected TM1 in ITW yesterday. Everything
is good so far. Travis was with me when i
did the job. |
|
225
|
Wednesday, January 02, 2013, 12:11 |
David Wang | ITW | Standard Operation | TM1 | | I moved 5 shielding blocks from ITW to block storage area | I moved 5 shielding blocks from ITW
to block storage area for preparing the TM1
disconnection. Air sampled and swiped blocks |
|
226
|
Thursday, January 03, 2013, 10:05 |
David Wang | ITW | Standard Operation | TM1 | | Disconnected TM1 in ITW. | TM1 has been disconnected in ITW. All
water lines had been purged. Travis was with
me during the job. |
|
227
|
Tuesday, January 08, 2013, 08:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TiC#3 | Electrical check | TM#1 with TiC #3 post beam. See attached
PDF for results. |
|
228
|
Tuesday, January 08, 2013, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Electrical check | TM#1 was electrically check with out a
target see attached PDF for results. |
|
230
|
Monday, January 14, 2013, 14:09 |
Travis Cave | ITW | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south hot
hell to the west target station, move went
well. |
|
231
|
Tuesday, January 15, 2013, 10:49 |
David Wang | ITW | Standard Operation | TM1 | no target | TM1 vacuum system connection in ITW | I connected TM 1 vacuum system in ITW.
The TM1 and ITW will be pumped out for shut
down routine leak check. |
|