163
|
Monday, August 20, 2012, 12:28 |
David Wang | ITW | Standard Operation | TM1 | | I moved 5 shielding blocks from ITE to ITW, | I moved 5 shielding blocks from ITE
to ITW.ITW is configured to take proton beam
now. |
|
176
|
Wednesday, September 12, 2012, 11:59 |
David Wang | ITW | Standard Operation | TM1 | UCx | TM1 disconnected in ITW | I removed 5 shielding blocks from ITW to
block storage area, and disconnected TM1
in ITW. After UCx run, the radioactive |
|
177
|
Thursday, September 13, 2012, 11:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#4 | module move | TM#1 with UCx#4 has been moved from the
west target station to the south hot cell.
Move went well. |
|
178
|
Thursday, September 13, 2012, 13:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south hot
cell to the south west silo. Move went well. |
|
180
|
Tuesday, September 18, 2012, 09:13 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 moved from the south west silo to
the south hot cell, move went well. |
|
181
|
Tuesday, September 18, 2012, 13:41 |
David Wang | South Hot-Cell | Standard Operation | TM1 | Nb#7 | leak check heat shield circuit | Chad and i did a leak check on TM1 heat
shield circuit with new Nb#7 target installed.
It took about 5 mins pump down the circuit |
|
182
|
Tuesday, September 18, 2012, 13:47 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Nb #7 install Cover Baseline | Nb #7 was installed and tested today.
Inside face of the containment box
cover was cleaned with methanol and a baseline |
 |
183
|
Wednesday, September 19, 2012, 11:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Electrical check | TM#1 with Nb#7 attached was electrically
checked at the south hot cell yesterday,
see attached pdf for details. Some notes |
|
184
|
Wednesday, September 19, 2012, 11:24 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Nb#7 | module move | TM#1 with Nb#7 was moved from the south
hot cell to the conditioning station. Move
went well. |
|
185
|
Thursday, September 20, 2012, 08:45 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Nb#7 | Electrical check | Electrical check was done at the conditioning
station this morning results are on the attached
PDF. |
|
186
|
Thursday, September 20, 2012, 09:16 |
David Wang | Conditioning Station | Standard Operation | TM1 | Nb#7 | TM1 Nb#7 target heat shield helium pressure check is done. | Leak detector pumped down to base LR1.3xE-9
atm.cc/sec, and BP 8xE-3 torr. All high
vacuum gauge readings at CS and TM1 are at |
|
187
|
Tuesday, September 25, 2012, 10:34 |
Travis Cave | ITW | Standard Operation | TM1 | Nb#7 | module move | TM#1 with Nb#7 moved from the conditioning
station to the west target station. Move
went well. |
|
188
|
Tuesday, September 25, 2012, 14:33 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | TM1connected in ITW | TM 1 is in ITW now. All connections are
done. The turbo pumps had been started this
afternoon. The vacuum looks good so far. |
|
190
|
Tuesday, October 02, 2012, 11:47 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | I moved 5 shielding blocks from ITE to ITW. | 5 shielding blocks have been moved from
ITE to ITW. ITW is configured to take proton
beam now. |
|
202
|
Tuesday, November 06, 2012, 11:06 |
Travis Cave | ITW | Standard Operation | TM1 | Nb#7 | module move | TM#1 with Nb#7 has been moved from the
west target station to the south hot cell
move went well. |
|
203
|
Tuesday, November 06, 2012, 11:34 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | | Nb#7 Removal | Attached are pre-removal pictures of NB#7
and the inside face of the containment box
cover before cleaning. |
![IMG_0797[1].JPG IMG_0797[1].JPG](attachment.png) ![IMG_0798[1].JPG IMG_0798[1].JPG](attachment.png) |
204
|
Tuesday, November 06, 2012, 12:08 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | TM1 disconnected in ITW | Bevan and I disconnected TM1 in ITW this
morning. The TM1 was moved to south hot cell
later. |
|
205
|
Tuesday, November 06, 2012, 14:00 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | TiC#3 | TiC#3 Installed | TiC#3 sucessfully installed and ready for
leak and electrical check. |
|
206
|
Wednesday, November 07, 2012, 09:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TiC#3 | Electrical check | TM#1 with TiC#3 target has had the electrical
performed on it. See attached PDF for details. |
|
207
|
Wednesday, November 07, 2012, 10:25 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | TiC#3 | module move | TM#1 with TiC#3 has been moved from the
south hot cell to the conditioning station,
move went well. |
|