116
|
Tuesday, June 05, 2012, 15:06 |
Bevan Moss | ITW | Standard Operation | TM1 | Nb#6 | Module move from ITW to SHC | TM1 has been moved from ITW to the
SHC. The move did encounter some issues,
one of the railings for preventing people |
|
117
|
Wednesday, June 06, 2012, 08:21 |
David Wang | ITW | Standard Operation | TM1 | | TM1 disconnected in ITW | I disconnected TM1 in ITW yesterday morning.The
general radioactive level in ITW over the
TM top (300mm) is about 350 usv/hr. contacting |
|
118
|
Wednesday, June 06, 2012, 13:36 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#38 | Target Change Nb#6 - Ta#38 | Nb#6 was removed from TM1...it looked very
clean.
Ta#38 was installed onto TM1...fit |
|
119
|
Wednesday, June 06, 2012, 14:33 |
David Wang | South Hot-Cell | Standard Operation | TM1 | Ta38 | leak check heat shield circuit | Chad and I did a leak check on heat shield
circuit after target is installed on TM1.The
leak detector pumping down is smooth. The |
|
120
|
Thursday, June 07, 2012, 11:58 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta38 | Module Move from SHC to TCS | TM1 was moved from SHC to the TCS. The
mode took roughly 1 hour. During the move
the north east corner of the containment |
|
121
|
Friday, June 08, 2012, 11:07 |
David Wang | Conditioning Station | Standard Operation | TM1 | Ta38 | conditioning staion and TM1 is under TP1 and TP2 pumping now. | I connected vacuum system to TM1 and conditioning
station and started two turbo pumps yesterday.
The pumping an d vacuum readings are |
|
122
|
Friday, June 08, 2012, 15:00 |
Don Jackson | South Hot-Cell | Standard Operation | TM1 | Nb#6 | Electrical Check Nb#6 at end of run | Megger check values were low but still
within operational range. |
|
123
|
Friday, June 08, 2012, 15:03 |
Don Jackson | South Hot-Cell | Standard Operation | TM1 | Ta38 | Electrical Check on new Ta38 at hot cell | Megger checks were exceptionally high (good).
Readings taken less than 2 hours after reading low
values from end of run on Nb#6. Tests |
|
125
|
Monday, June 11, 2012, 14:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#38 | Electrical check | Electrical check of TM#1 with Ta#38 at
the conditioning station under vacuum. See
attached file for details. |
|
126
|
Monday, June 11, 2012, 14:41 |
David Wang | Conditioning Station | Standard Operation | TM1 | Ta38 | Heat shield helium pressure test | Connected leak detector to TM1 and CS vacuum
system. The vacuum readings on TM1 and CS:PNG1
1.3 xE-6 Torr, IG1 4.7xE-7torr, IG4(diagnostic |
|
127
|
Tuesday, June 19, 2012, 10:35 |
Travis Cave | ITW | Standard Operation | TM1 | Ta#38 | module move | TM#1 with Ta#38 moved from the conditioning
station to the west target station. Move
went well. |
|
128
|
Tuesday, June 19, 2012, 16:18 |
David Wang | ITW | Standard Operation | TM1 | Ta38 | TM1connected in ITW |
Normal
0
|
|
151
|
Tuesday, July 31, 2012, 09:52 |
David Wang | ITW | Standard Operation | TM1 | Ta38 | TM1 disconnected in ITW | I disconnected TM1 in ITW. Heat shield
line has been purged . |
|
152
|
Tuesday, July 31, 2012, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#38 | module move | TM#1 with Ta#38 has been moved from the
west target station to the south hot cell,
no problems with the move. |
|
153
|
Tuesday, July 31, 2012, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#4 | UCx#4 Installed | Starting at 11:00 am and finishing at 12:10
Ucx#4 previous target was removed and UCx#4
installed and leak checked on TM1. |
|
154
|
Tuesday, July 31, 2012, 12:50 |
David Wang | South Hot-Cell | Standard Operation | TM1 | UC x | TM1 heat shield circuit leak check with UC x target | Chad and i did a leak check on TM1heat
shield with UCx target on.The circuit are
pumped down to the bottom leak rate |
|
155
|
Tuesday, July 31, 2012, 14:04 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#4 | module move | TM#1 with UCx#4 has been moved from the
south hot hell to the conditioning
station. No problems with the move. |
|
156
|
Wednesday, August 01, 2012, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#4 | Electrical check | TM#1 with UCx#4 electrical check done at
the conditioning station under vacuum, see
attached sheet for results. |
|
157
|
Thursday, August 02, 2012, 07:48 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx | TM1 UCx target heat shield helium pressure check is done. | Connected leak detector to TM1 and CS vacuum
system. The vacuum readings on TM1 and
CS:PNG4 3.6 xE-6 Torr, IG1 1.1xE-6torr, IG4(diagnostic |
|
160
|
Tuesday, August 14, 2012, 11:16 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#4 | module move | TM#1 with UCx#4 has been moved from the
conditioning station to the west target station
move went well. |
|