153
|
Tuesday, July 31, 2012, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#4 | UCx#4 Installed |
Starting at 11:00 am and finishing at 12:10 Ucx#4 previous target was removed and UCx#4 installed and leak checked on TM1.
During module move to the hot cell UCx#4 was housed in a bag under argon. |
154
|
Tuesday, July 31, 2012, 12:50 |
David Wang | South Hot-Cell | Standard Operation | TM1 | UC x | TM1 heat shield circuit leak check with UC x target |
Chad and i did a leak check on TM1heat shield with UCx target on.The circuit are pumped down to the bottom leak rate and base pressure is 3xE-3 torr on the leak detector. There are two VCR caps on heat shield circuit. Chad sprayed helium on both of them ( tested individually,2 seconds every time ) . The test repeated 1 time.There is no response on leak detector during 45 seconds waiting time on both time.Chad flushed helium around the target for 15 second. During 1 minutes waiting time , there is no response on leak detector.The heat shield circuit is leak tight at this stage. It will be helium pressure in CS later. |
155
|
Tuesday, July 31, 2012, 14:04 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#4 | module move |
TM#1 with UCx#4 has been moved from the south hot hell to the conditioning station. No problems with the move. |
156
|
Wednesday, August 01, 2012, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#4 | Electrical check |
TM#1 with UCx#4 electrical check done at the conditioning station under vacuum, see attached sheet for results. |
Attachment 1: TM#1_UC#4_under_vac.PDF
|
|
157
|
Thursday, August 02, 2012, 07:48 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx | TM1 UCx target heat shield helium pressure check is done. |
Connected leak detector to TM1 and CS vacuum system. The vacuum readings on TM1 and CS:PNG4 3.6 xE-6 Torr, IG1 1.1xE-6torr, IG4(diagnostic box) 3.4xE-6 Torr. Leak detector base pressure:0.0xE-4 torr, base leak rate: 0.0xE-9 atm.cc/sec. Applied 80 psi helium to heat shield circuit for 4 mins . There is no response on leak detector. The heat shield circuit is leak tight. |
160
|
Tuesday, August 14, 2012, 11:16 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#4 | module move |
TM#1 with UCx#4 has been moved from the conditioning station to the west target station move went well. |
161
|
Tuesday, August 14, 2012, 11:16 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#4 | module move |
TM#1 with UCx#4 moved from the conditioning to the west target station move went well. |
162
|
Tuesday, August 14, 2012, 14:27 |
David Wang | ITW | Standard Operation | TM1 | UCx | TM1connection in ITW |
Connected TM1 in ITW,started 6 turbo pumps, and finished TM1 water interlock check . Every thing is good so far. |
163
|
Monday, August 20, 2012, 12:28 |
David Wang | ITW | Standard Operation | TM1 | | I moved 5 shielding blocks from ITE to ITW, |
I moved 5 shielding blocks from ITE to ITW.ITW is configured to take proton beam now. |
176
|
Wednesday, September 12, 2012, 11:59 |
David Wang | ITW | Standard Operation | TM1 | UCx | TM1 disconnected in ITW |
I removed 5 shielding blocks from ITW to block storage area, and disconnected TM1 in ITW. After UCx run, the radioactive level around the turbo pumps and primary vacuum lines are pretty high. This affect the general field inside the ITW pit around working area.i took 15 minuts to finish the job and i got 0.1msvr dose. the general field around my working area is about 350 usv/h. |
177
|
Thursday, September 13, 2012, 11:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#4 | module move |
TM#1 with UCx#4 has been moved from the west target station to the south hot cell. Move went well. |
178
|
Thursday, September 13, 2012, 13:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move |
TM#1 has been moved from the south hot cell to the south west silo. Move went well. |
180
|
Tuesday, September 18, 2012, 09:13 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move |
TM#1 moved from the south west silo to the south hot cell, move went well. |
181
|
Tuesday, September 18, 2012, 13:41 |
David Wang | South Hot-Cell | Standard Operation | TM1 | Nb#7 | leak check heat shield circuit |
Chad and i did a leak check on TM1 heat shield circuit with new Nb#7 target installed. It took about 5 mins pump down the circuit to leak rate 0.0x E-9atm.cc/sec and 0.0x E-4 torr on leak detector.
All vacuum lines and joints which connected to the leak detector had been helium sprayed and they are leak tight. Chad sprayed helium on each VCR joints for 2 seconds every time. During 45sec waiting time, there is no any response on leak detector. Chad repeated same test again for double checking and we got same result. Chad finally flushed the helium around the target heat shield for 10 seconds.we waited for 45minute and found no response on the leak detector. The heat shield circuit is leak tight at this stage. I will do a helium pressure test on this circuit when TM1 is in CS and under vacuum.
|
182
|
Tuesday, September 18, 2012, 13:47 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Nb #7 install Cover Baseline |
Nb #7 was installed and tested today.
Inside face of the containment box cover was cleaned with methanol and a baseline picture taken in an effort to track deposits and marking as requested bty Anders. |
Attachment 1: IMG_3191.JPG
|
|
Attachment 2: IMG_3192.JPG
|
|
183
|
Wednesday, September 19, 2012, 11:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Electrical check |
TM#1 with Nb#7 attached was electrically checked at the south hot cell yesterday, see attached pdf for details. Some notes about this test the oven to the 60kV common is 2Mohm this was noticed on the target prior to installation on the module, and the 60kV common to chassis is low at 874Mohm (low as in a non infinite value). |
Attachment 1: TM1_Nb7_Elec_chk_SHC.PDF
|
|
184
|
Wednesday, September 19, 2012, 11:24 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Nb#7 | module move |
TM#1 with Nb#7 was moved from the south hot cell to the conditioning station. Move went well. |
185
|
Thursday, September 20, 2012, 08:45 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Nb#7 | Electrical check |
Electrical check was done at the conditioning station this morning results are on the attached PDF. |
Attachment 1: TM1_Nb7_Elec_chk_CS.PDF
|
|
186
|
Thursday, September 20, 2012, 09:16 |
David Wang | Conditioning Station | Standard Operation | TM1 | Nb#7 | TM1 Nb#7 target heat shield helium pressure check is done. |
Leak detector pumped down to base LR1.3xE-9 atm.cc/sec, and BP 8xE-3 torr. All high vacuum gauge readings at CS and TM1 are at low -6 range from 1.2xE-6torr to 4.6x E-6 torr. Applied 80 psi helium to heat shield circuit for 5minutes and there is no any response on leak detector. The heat shield circuit is leak tight. |
187
|
Tuesday, September 25, 2012, 10:34 |
Travis Cave | ITW | Standard Operation | TM1 | Nb#7 | module move |
TM#1 with Nb#7 moved from the conditioning station to the west target station. Move went well. |