Entry  Tuesday, July 31, 2012, 12:24, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#4, UCx#4 Installed 
Starting at 11:00 am and finishing at 12:10 Ucx#4 previous target was removed and UCx#4 installed and leak checked on TM1.
During module move to the hot cell UCx#4 was housed in a bag under argon.
Entry  Tuesday, July 31, 2012, 12:50, David Wang, South Hot-Cell, Standard Operation, TM1, UC x, TM1 heat shield circuit leak check with UC x target 
Chad and i did a leak check on TM1heat shield with UCx target on.The circuit are pumped  down to the bottom leak rate and base  pressure is 3xE-3
torr on the leak detector. There are two VCR caps on heat shield  circuit. Chad sprayed helium on both of them   ( tested individually,2  seconds
every time ) . The test repeated 1 time.There is no response on leak detector during 45  seconds waiting time on both time.Chad flushed helium around the
Entry  Tuesday, July 31, 2012, 14:04, Travis Cave, Conditioning Station, Standard Operation, TM1, UCx#4, module move 
TM#1 with UCx#4 has been moved from the south  hot hell to the conditioning station. No problems with the move.
Entry  Wednesday, August 01, 2012, 09:14, Travis Cave, Conditioning Station, Standard Operation, TM1, UCx#4, Electrical check TM#1_UC#4_under_vac.PDF
TM#1 with UCx#4 electrical check done at the conditioning station under vacuum, see attached sheet for results.
Entry  Thursday, August 02, 2012, 07:48, David Wang, Conditioning Station, Standard Operation, TM1, UCx, TM1 UCx target heat shield helium pressure check is done. 
Connected leak detector to TM1 and CS vacuum system. The vacuum readings   on TM1 and CS:PNG4 3.6 xE-6 Torr, IG1 1.1xE-6torr, IG4(diagnostic   box) 3.4xE-6
Torr. Leak detector base pressure:0.0xE-4 torr, base leak   rate: 0.0xE-9 atm.cc/sec. Applied 80 psi helium to heat shield circuit   for 4 mins . There
is no response on leak detector. The heat shield   circuit is leak tight.
Entry  Tuesday, August 14, 2012, 11:16, Travis Cave, ITW, Standard Operation, TM1, UCx#4, module move 
TM#1 with UCx#4 has been moved from the conditioning station to the west target station move went well.
Entry  Tuesday, August 14, 2012, 11:16, Travis Cave, ITW, Standard Operation, TM1, UCx#4, module move 
TM#1 with UCx#4 moved from the conditioning to the west target station move went well.
Entry  Tuesday, August 14, 2012, 14:27, David Wang, ITW, Standard Operation, TM1, UCx, TM1connection in ITW 
Connected TM1 in ITW,started 6 turbo pumps, and finished TM1 water interlock check . Every thing is good so far.
Entry  Monday, August 20, 2012, 12:28, David Wang, ITW, Standard Operation, TM1, , I moved 5 shielding blocks from ITE to ITW, 
I moved 5 shielding blocks from ITE  to ITW.ITW is configured to take proton beam now.
Entry  Wednesday, September 12, 2012, 11:59, David Wang, ITW, Standard Operation, TM1, UCx, TM1 disconnected in ITW 
I removed 5 shielding blocks from ITW to block storage area, and disconnected TM1 in ITW. After UCx run,  the radioactive level around the turbo
pumps and primary vacuum lines are pretty high. This affect the general field inside the ITW pit around working area.i took 15 minuts to finish the job
and i got 0.1msvr dose. the general field around my working area is about 350 usv/h.
Entry  Thursday, September 13, 2012, 11:03, Travis Cave, South Hot-Cell, Standard Operation, TM1, UCx#4, module move 
TM#1 with UCx#4 has been moved from the west target station to the south hot cell. Move went well.
Entry  Thursday, September 13, 2012, 13:27, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 
TM#1 has been moved from the south hot cell to the south west silo. Move went well.
Entry  Tuesday, September 18, 2012, 09:13, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 
TM#1 moved from the south west silo to the south hot cell, move went well.
Entry  Tuesday, September 18, 2012, 13:41, David Wang, South Hot-Cell, Standard Operation, TM1, Nb#7, leak check heat shield circuit 
Chad  and i did a leak check on TM1 heat shield circuit with new Nb#7 target  installed. It took about 5 mins pump down  the circuit to leak rate 0.0x
E-9atm.cc/sec and 0.0x E-4 torr on leak  detector.
All vacuum lines and joints which connected to the leak detector had  been helium sprayed and they are leak  tight. Chad sprayed helium on
Entry  Tuesday, September 18, 2012, 13:47, chad fisher, South Hot-Cell, Standard Operation, TM1, Nb#7, Nb #7 install Cover Baseline IMG_3191.JPGIMG_3192.JPG
Nb #7 was installed and tested today.
Inside face of the containment box cover was cleaned with methanol and a baseline picture taken in an effort to track deposits and marking as requested
bty Anders.
Entry  Wednesday, September 19, 2012, 11:23, Travis Cave, South Hot-Cell, Standard Operation, TM1, Nb#7, Electrical check TM1_Nb7_Elec_chk_SHC.PDF
TM#1 with Nb#7 attached was electrically checked at the south hot cell yesterday, see attached pdf for details. Some notes about this test the oven to
the 60kV common is 2Mohm this was noticed on the target prior to installation on the module, and the 60kV common to chassis is low at 874Mohm (low as in
a non infinite value).
Entry  Wednesday, September 19, 2012, 11:24, Travis Cave, Conditioning Station, Standard Operation, TM1, Nb#7, module move 
TM#1 with Nb#7 was moved from the south hot cell to the conditioning station. Move went well.
Entry  Thursday, September 20, 2012, 08:45, Travis Cave, Conditioning Station, Standard Operation, TM1, Nb#7, Electrical check TM1_Nb7_Elec_chk_CS.PDF
Electrical check was done at the conditioning station this morning results are on the attached PDF.
Entry  Thursday, September 20, 2012, 09:16, David Wang, Conditioning Station, Standard Operation, TM1, Nb#7, TM1 Nb#7 target heat shield helium pressure check is done. 
Leak detector pumped down to base LR1.3xE-9 atm.cc/sec, and BP 8xE-3 torr. All  high vacuum gauge readings at CS and TM1 are at low -6 range from 1.2xE-6torr
to 4.6x E-6 torr. Applied 80 psi helium  to heat shield  circuit for 5minutes and there is no any response on leak detector. The  heat shield circuit
is leak tight.
Entry  Tuesday, September 25, 2012, 10:34, Travis Cave, ITW, Standard Operation, TM1, Nb#7, module move 
TM#1 with Nb#7 moved from the conditioning station to the west target station. Move went well.