ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
153
|
Tuesday, July 31, 2012, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#4 | UCx#4 Installed | Starting at 11:00 am and finishing at 12:10
Ucx#4 previous target was removed and UCx#4
installed and leak checked on TM1. |
|
154
|
Tuesday, July 31, 2012, 12:50 |
David Wang | South Hot-Cell | Standard Operation | TM1 | UC x | TM1 heat shield circuit leak check with UC x target | Chad and i did a leak check on TM1heat
shield with UCx target on.The circuit are
pumped down to the bottom leak rate |
|
155
|
Tuesday, July 31, 2012, 14:04 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#4 | module move | TM#1 with UCx#4 has been moved from the
south hot hell to the conditioning
station. No problems with the move. |
|
156
|
Wednesday, August 01, 2012, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#4 | Electrical check | TM#1 with UCx#4 electrical check done at
the conditioning station under vacuum, see
attached sheet for results. |
|
157
|
Thursday, August 02, 2012, 07:48 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx | TM1 UCx target heat shield helium pressure check is done. | Connected leak detector to TM1 and CS vacuum
system. The vacuum readings on TM1 and
CS:PNG4 3.6 xE-6 Torr, IG1 1.1xE-6torr, IG4(diagnostic |
|
160
|
Tuesday, August 14, 2012, 11:16 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#4 | module move | TM#1 with UCx#4 has been moved from the
conditioning station to the west target station
move went well. |
|
161
|
Tuesday, August 14, 2012, 11:16 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#4 | module move | TM#1 with UCx#4 moved from the conditioning
to the west target station move went well. |
|
162
|
Tuesday, August 14, 2012, 14:27 |
David Wang | ITW | Standard Operation | TM1 | UCx | TM1connection in ITW | Connected TM1 in ITW,started 6 turbo pumps,
and finished TM1 water interlock check .
Every thing is good so far. |
|
163
|
Monday, August 20, 2012, 12:28 |
David Wang | ITW | Standard Operation | TM1 | | I moved 5 shielding blocks from ITE to ITW, | I moved 5 shielding blocks from ITE
to ITW.ITW is configured to take proton beam
now. |
|
176
|
Wednesday, September 12, 2012, 11:59 |
David Wang | ITW | Standard Operation | TM1 | UCx | TM1 disconnected in ITW | I removed 5 shielding blocks from ITW to
block storage area, and disconnected TM1
in ITW. After UCx run, the radioactive |
|
177
|
Thursday, September 13, 2012, 11:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#4 | module move | TM#1 with UCx#4 has been moved from the
west target station to the south hot cell.
Move went well. |
|
178
|
Thursday, September 13, 2012, 13:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south hot
cell to the south west silo. Move went well. |
|
180
|
Tuesday, September 18, 2012, 09:13 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 moved from the south west silo to
the south hot cell, move went well. |
|
181
|
Tuesday, September 18, 2012, 13:41 |
David Wang | South Hot-Cell | Standard Operation | TM1 | Nb#7 | leak check heat shield circuit | Chad and i did a leak check on TM1 heat
shield circuit with new Nb#7 target installed.
It took about 5 mins pump down the circuit |
|
182
|
Tuesday, September 18, 2012, 13:47 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Nb #7 install Cover Baseline | Nb #7 was installed and tested today.
Inside face of the containment box
cover was cleaned with methanol and a baseline |
|
183
|
Wednesday, September 19, 2012, 11:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Electrical check | TM#1 with Nb#7 attached was electrically
checked at the south hot cell yesterday,
see attached pdf for details. Some notes |
|
184
|
Wednesday, September 19, 2012, 11:24 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Nb#7 | module move | TM#1 with Nb#7 was moved from the south
hot cell to the conditioning station. Move
went well. |
|
185
|
Thursday, September 20, 2012, 08:45 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Nb#7 | Electrical check | Electrical check was done at the conditioning
station this morning results are on the attached
PDF. |
|
186
|
Thursday, September 20, 2012, 09:16 |
David Wang | Conditioning Station | Standard Operation | TM1 | Nb#7 | TM1 Nb#7 target heat shield helium pressure check is done. | Leak detector pumped down to base LR1.3xE-9
atm.cc/sec, and BP 8xE-3 torr. All high
vacuum gauge readings at CS and TM1 are at |
|
187
|
Tuesday, September 25, 2012, 10:34 |
Travis Cave | ITW | Standard Operation | TM1 | Nb#7 | module move | TM#1 with Nb#7 moved from the conditioning
station to the west target station. Move
went well. |
|