Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 87 of 138  Not logged in ELOG logo
ID Date Author Categorydown Type Module Target/Number Subject
  1310   Tuesday, August 09, 2016, 10:05 Travis CaveITEStandard OperationTM4UC#17module moved

TM#4 with UC#17 is now in the east target station.

  1313   Wednesday, August 10, 2016, 11:30 David WangITEStandard OperationTM4UC#17TM4 has been connected at ITE

Dan and I connected TM4 in ITE yesterday. It is pumping down at ITE now. Everything is fine so far.

  1319   Monday, August 15, 2016, 10:08 David WangITEStandard OperationTM4UC#175 Shielding blocks have been transferred from ITW to ITE.

Dan and I transferred 5 shielding blocks from ITW to ITE. The ITE is configured to take proton beam.

  1356   Tuesday, September 20, 2016, 11:41 David WangITEStandard OperationTM4 TM4 has been disconnected in ITE.

TM4 has been disconnected in ITE. No water line purge on HS and 3 water circuits are looped after disconnection. The HALCW system resistivity is stable before and after this disconnection.

  1364   Tuesday, September 27, 2016, 09:13 Travis CaveITEStandard OperationTM4SiC#34module moved

TM#4 with SiC #34 has been moved to the east target station.

  1365   Wednesday, September 28, 2016, 13:43 David WangITEStandard OperationTM4 TM4 has been connected at ITE

All ITE turbo pumps have been started since yesterday afternoon. The ITE and TM4 pumping down is good so far.

  1368   Tuesday, October 04, 2016, 09:18 David WangITEStandard OperationTM4 5 Shielding blocks have been transferred from ITW to ITE.

The ITE is configured to take proton beam.

  1374   Thursday, October 20, 2016, 14:17 Anders MjosITERepairTM4SiC#34HV enclosure inspection

 The HV enclosure and module connections were inspected by David and Anders on Wednesday 19th in an attempt to find any HV problems causing the high leakage current. One cable was cable tied to a copper conductor in the chase. Some small pieces of loose material were removed. No obvious problems could be detected.

  1385   Tuesday, November 01, 2016, 14:53 David WangITEStandard OperationTM4 TM4 was disconnected at ITE

TM4 was disconnected at ITE this morning. It was moved to SHC  after. No alpha alarm issue has been happened during and after move. The ventilation pumping down procedure on ITE was fulfilled during the move.

  1386   Tuesday, November 01, 2016, 14:54 David WangITEStandard OperationTM4 TM4 was disconnected at ITE

TM4 was disconnected at ITE this morning. It was moved to SHC  after. No alpha alarm issue has been happened during and after move. The ventilation pumping down procedure on ITE was fulfilled during the move.

  1394   Tuesday, November 08, 2016, 10:23 Travis CaveITEStandard OperationTM4Ta#50module moved

TM#4 with Ta#50 has been moved to the east target station.

  1396   Tuesday, November 08, 2016, 14:45 David WangITEMaintenanceTM4 TM4 has been moved to ITE and connected there.

All ITE and TM4  turbo pumps are started. The east station pumping down is good so far.

  1422   Wednesday, January 18, 2017, 09:55 David WangITEStandard OperationTM4 ITE and TM4 2017 winter shut down leak check.

ITE and TM4 2017 winter shut down leak check are finished. All ITE primary, secondary vacuum vessel and TM4 water lines are good. No any leak has been found.

  1432   Wednesday, February 01, 2017, 12:23 David WangITEStandard OperationTM2 TM2 has been connected in ITE.

TM2 has been connected in ITE. The SST window water lines in ITE can not be connected properly to TM2. The water line connector on TM2 window is 90 degree CCW installed in direction comparing to TM4.This caused the problem. Solution: Two piece of flexible lines and extra male QC adapters have been used to fix this issue.  HV cover and HV fence in ITE work  with TM2. Other connections are good as well.

  1446   Tuesday, March 07, 2017, 14:41 David WangITEMaintenance  ITE dump plug water circuit is closed for ITE IG1S small surge.

It is closed @ 2:35PM by closing supply side valve first , the return side valve of ITE dump plug .

Opened ITE dump plug circuit valves @4:28PM. ITE IG1S still at 1XE-6. No change before and after of circuit closing and reopeneing.

  1447   Wednesday, March 08, 2017, 14:09 David WangITEMaintenanceTM2 ITE IG1S increasing.

By retrieving data further, It has been found no directly relationship between IG1S surging and dump plug water opening. Vacuum surging is 10minutes ahead dump water supply to circuit. SEE attachment 1. Also, The ITE IG1S start to behavior unusual in middle of Feburary. See attachment 2. Today,  ITE IG1S is still slowly climbing up. I decide to leak check ITE vacuum vessel. Before  leak check, for more information and trouble shooting. I closed water supply to ITE to see if vacuum has response on it. I will return water supply to ITE  tomorrow morning.

Water supply to ITE is returned this afternoon at 2: 10 PM.  Everything works fine so far

I leak checked ITE secondary vessel vacuum. A leak have been found in March 09th noon which is located between entrance module and TM2 top tank flange o-ring seal( on tank flange). It could not be confirm on which side of the o-ring the leak is from.

During last night, ITE IG1S reading went back to normal low E-7 range and stays in this range now. So I leak checked same area again this morning. The leak disappeared now. The o-ring works sometime , but not all the time. The plan for this issue: Change ITE target module side o-ring when TM2 is move out., and watch on the ITE IG1s when TM4 is moved back to ITE and pumped down.

  1464   Monday, March 27, 2017, 06:33 David WangITEStandard Operation  ITE clean up

ITE clean up is done.  HV cage inside is wiped.

  1473   Tuesday, April 04, 2017, 09:29 Travis CaveITEStandard OperationTM4UC#19module moved

TM#4 with UC#19 has been moved from the conditioning station to the east target station.

  1477   Tuesday, April 04, 2017, 14:40 David WangITEStandard OperationTM4 TM4 has been connected in ITE

all turbo-pumps are started. Everything looks fine so far.

  1479   Wednesday, April 05, 2017, 11:57 David WangITEMaintenance  ITE target module flange o-ring repalcement

ITE target module tank flange o-ring was replaced yesterday before TM4 moving. ITE: IG1S reading looks fine so far. 

ELOG V2.9.2-2455