Entry  Friday, May 13, 2016, 10:08, David Wang, Conditioning Station, Standard Operation, TM2, , Helium pressure test on TM2 HS and window line at CS with new Lp Ta target 
Entry  Friday, May 13, 2016, 10:12, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 water lines, heaters, EE, and EL are connected at TCS. 
Entry  Monday, May 16, 2016, 11:16, David Wang, ITW, Standard Operation, TM1, , ITW, TM1 turbo-pumps are swithched off 
Entry  Friday, May 20, 2016, 08:13, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, I switched off TCS and TM2 water system 
Entry  Friday, May 20, 2016, 10:38, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, Helium pressure test on TM2 with new Lp Ta target 
Entry  Tuesday, May 24, 2016, 10:39, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, TM2 and TCS turbo-pumps have been switched off this morning. 
Entry  Tuesday, May 24, 2016, 10:42, David Wang, Conditioning Station, Standard Operation, TM2, , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep_2016.xlsxTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf
Entry  Wednesday, May 25, 2016, 14:08, David Wang, ITW, Standard Operation, TM2, Ta#48, TM2 has been connected in ITW 
Entry  Thursday, June 02, 2016, 11:59, David Wang, South Hot-Cell, Repair, TM3, , 5K mega test on TM3 5K_mega_check_on_TM3.pdf
Entry  Tuesday, June 07, 2016, 11:36, David Wang, ITE, Standard Operation, TM4, Ta#47, TM4 has been disconnected in ITE. 
Entry  Tuesday, June 07, 2016, 11:37, David Wang, ITE, Standard Operation, TM4, Ta#47, TM4 has been moved from ITE to SHC 
Entry  Tuesday, June 07, 2016, 11:42, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#47, electrical check on TM4 with old Ta target at SHC. electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdfelectrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf
Entry  Tuesday, June 07, 2016, 17:11, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 UCx16 electrical check and leak check at SHC UCX_16_electrical_test.pdfelectrical_check._TM4_UCx16_at_TCS..pdf
Entry  Tuesday, June 07, 2016, 17:14, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 target has been moved from SHC to TCS. 
Entry  Tuesday, June 07, 2016, 18:17, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 and TCS turbo pumps are started. 
Entry  Thursday, June 09, 2016, 08:37, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 helium pressure test at TCS TM4_withUCx16_helium_pressure_test_at_TCS.pdf
Entry  Thursday, June 09, 2016, 09:44, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been connected at TCS 
Entry  Thursday, June 09, 2016, 10:04, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf
Entry  Tuesday, June 14, 2016, 08:04, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been disconnected at TCS 
Entry  Tuesday, June 14, 2016, 11:20, David Wang, ITE, Standard Operation, TM4, , TM4 has been connected in ITE 