  2432   Tuesday, April 18, 2023, 07:28 chad fisherNorth Hot-CellMaintenance  NHC entry summaryNHC was entered on April 17, 2023 for inspection
and maintenance. Summary :
Compressible and non-compressible
  
  1421   Tuesday, January 17, 2017, 13:45 Isaac EarleNorth Hot-CellDevelopment  NHC ducting installed The new ducting section connecting
the existing duct termination in the TCS
space to the NHC partition wall has been
 IMG_7688.JPGIMG_7716.JPGIMG_7723.JPGIMG_7721.JPG 
  1596   Wednesday, August 09, 2017, 16:39 Isaac EarleNorth Hot-CellDevelopment  NHC drain line into sump identified The NHC drain line was tested by
pouring approximately 10 gallons of water
through the drain grate at the base of the
  
  1761   Wednesday, August 01, 2018, 09:47 Isaac EarleNorth Hot-CellDevelopment  NHC diagnostic signals and control panel tested On July 30th the NHC diagnostic
signals were tested:
- 9 pin CPC: a shorting plug was
  
  1756   Thursday, July 19, 2018, 14:22 Isaac EarleNorth Hot-CellDevelopment  NHC diagnostic signals - connector and wiring detailsInstallation of the diagnostic connections
between the NHC hot and cold sides has been
completed.  The cable bundle was prepared
  
  1825   Thursday, November 22, 2018, 14:38 Isaac EarleNorth Hot-CellDevelopment  NHC design approved by High Voltage EngineerTo satisfy RS 101 from the NHC requirements
specification (Document-131915) Tomislav
Hurskovec was consulted regarding high voltage
 NHCHV.pdf 
  1847   Friday, January 04, 2019, 14:38 Isaac EarleNorth Hot-CellDevelopment  NHC cameras testedThe NHC module support flange cameras (4
total) as well as the NHCSA camera were tested
today and confirmed to be working properly. 
 NHC_flange_East_and_West_views.JPGNHC_flange_North_and_South_views.JPGCamera_view_through_operator_viewing_window.JPG 
  1577   Wednesday, July 05, 2017, 15:36 Isaac EarleNorth Hot-CellDevelopment  NHC and SHC nuclear ventilation flow sensors installed Installation of new flow sensors
and transmitters for the NHC and SHC duct
lines was completed in the target hall today.
 IMG_0264.JPGIMG_0265.JPG 
  1780   Wednesday, September 12, 2018, 15:22 Isaac EarleNorth Hot-CellDevelopment  NHC air and gas supply lines - test and leak checkTesting was completed today on the NHC
air and gas supply lines.  For each
line a Staubli plug was installed on the
  
  1345   Wednesday, September 07, 2016, 11:39 Isaac EarleNorth Hot-CellDevelopment  NHC North / South Wall Gap Measurements Measurements were taken today of
the NHC north/south wall gap at the location
where the NHC/TCS partition wall will be
  
  1353   Thursday, September 15, 2016, 11:05 Isaac EarleNorth Hot-CellDevelopment  NHC / SHC feedthrough panel removedThe sheet metal panel covering the NHC/SHC
feedthrough port was removed today using
a slide-hammer to pull out the concrete anchors
 original_panel.JPGpanel_removed.JPGtemp_panel.JPG 
  2391   Tuesday, November 22, 2022, 14:53 Carla BabcockNorth Hot-CellMaintenanceTM4 Multipin connector alignment pin on TM4 module looseThe pin on TM4 has become loose again,
making it very difficult to remove the multipin
connector with the last target, C#4. For
  
  65   Wednesday, January 04, 2012, 13:49 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.Well the first of this year's lucky winners
to win a fabulous one way trip to Chalk River
are as follows. UC#1, UC#2, Ta#25, Ta#26,
  
  113   Friday, May 25, 2012, 10:48 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.Five targets were moved to the mini storage
today in preparation for transfer of the
targets to the F308s later next week. The
 Mini_Vault_Storage_May_25_2012.pdfVault_Storage_May_25_2012.pdf 
  216   Wednesday, November 14, 2012, 11:51 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.Five spent targets have been moved from
the storage vault to the mini storage vault.
The five targets are as follows: SiC #25,
 Vault_Storage_November_14_2012.pdfMini_Vault_Storage_November_14_2012.pdf 
  933   Thursday, June 04, 2015, 07:44 Dan McDonaldAssembly/Bench TestDevelopmentTM2 Movement of TM2 source tray to alignment area in ISACOnce the test stand was vented and all
lines purged Anders Mjos and myself jigged
up the water blocks and proceeded to remove
  
  24   Wednesday, August 24, 2011, 16:35 Bevan MossSouth Hot-CellRepairTM1UCx#2Move, inspection and repair On August 22nd TM1 was vented with
Argon in the conditioning station. It had
been pumping with just the roughing pump
 2011-08-23-17-41-40.UCx_Leak_August_22_2011.jpg 
  35   Tuesday, October 04, 2011, 14:13 Travis CaveITWStandard OperationTM1TaC#1Move ot TM#1Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station.
  
  51   Tuesday, November 15, 2011, 13:08 Travis CaveConditioning StationStandard OperationTM1 Move ot TM#1TM#1 has been moved from the south hot
cell to the conditioning station. Move went
well.
  
  82   Thursday, April 12, 2012, 09:38 Travis CaveConditioning StationStandard OperationTM1no targetMove ot TM#1TM#1 has been moved from the NE silo to
the Conditioning Station.
  