  580   Thursday, January 16, 2014, 10:36 chad fisherSouth Hot-CellRepair  East Manipulator RepairThe repair/cable replacement on the east
manipulator is now complete.
Yesterday's initail cable replacement
 Manip_repair_20140114.jpgManip_repair_20140115.jpg 
  581   Monday, January 20, 2014, 13:35 David WangITEStandard OperationTM4 5 shielding blocks had been moved out of ITE5 SHIELDING BLOCKS HAD BEEN MOVED OUT OF
ITE.AIR SAMPLE AND SWIPED FIRST BLOCK AND
ITE PIT.NOTHING HAD BEEN FOUND ON ALPHA MONITOR
  
  582   Monday, January 20, 2014, 13:38 David WangITEStandard OperationTM4 DISCONNECTED TM4 IN ITE.I DISCONNECTED TM4 IN ITE. ALL WATER LINES
HAD BEEN PURGED OUT WITH PRESSURE AIR.
  
  586   Wednesday, January 22, 2014, 10:51 David WangITERepair  Removed 4 shielding blocks located on top of preseperator in THTravis and I removed 4 shielding blocks
located on top of pre-seperator  in
TH. This is a job for ITE harp 9 re-installation
  
  590   Monday, February 03, 2014, 14:45 Travis CaveSpent Target VaultStandard Operation  Spent targets to mini storage and the F-308s to the Target HallTargets NiO#1(101), Nb#5(85), TaC#1(92),
and ZrC#5(81) have been moved from the storage
vault and placed in the mini storage. The
 Vault_Storage_February_3_2014.pdfMini_Vault_Storage_February_3_2014.pdf 
  591   Tuesday, February 04, 2014, 08:04 David WangSouth Hot-CellRepairTM2 Leak check TM2 tube heater (+) water line.Chad and I leak checked TM2 tube heater(+)
water line yesterday afternoon. The water
line was difficult to pump down on base leak
 IMG_0012.JPGIMG_0013.JPG 
  592   Tuesday, February 04, 2014, 09:42 David WangSouth Hot-CellRepairTM2 pressure test on TM2 tube heater +(D) water line.Chad and I did a pressure test on TM2 tube
Heater+(D) water line.I pressurized the D
line with shop air from quick connectors(both
 10x 
  593   Wednesday, February 05, 2014, 14:05 David WangSouth Hot-CellRepairTM2 Leak check TM2 tube heater (+) water line from inside service cap in TH.Bevan and I did a leak check on TM2 tube
heater+ from inside service cap in TH. The
leak detector base leak rate 0.0xE-9 atm.cc/sec,
 005.JPG008.JPG005.JPG 
  594   Wednesday, February 05, 2014, 14:12 Travis CaveSpent Target VaultStandard Operation  Targets moved from mini storage to F-308sAll targets in the mini storage (4) have
been moved from there and placed into the
F-308s and those have been moved to the mech
  
  595   Friday, February 07, 2014, 10:29 chad fisherSouth Hot-CellRepairTM2 TM2 C.B. and circuit DContainment box has been removed and the
blank off from circuit D has been removed
for inspection of both the blank off and
 TM2_20140207_1.jpgTM2_20140207_2.jpg 
  596   Tuesday, February 11, 2014, 13:56 chad fisherSouth Hot-CellRepairTM2 waterblock cleaningNew cleaning and polishing pads have been
inserted onto the hot cell as well as rubber
bungs and a new blank off.
 TM2_20140207_2.jpgTM2_20140211_2.jpg 
  597   Thursday, February 13, 2014, 09:24 David WangSouth Hot-CellRepairTM2 Leak check TM2 tube heater (+) water line with rubber insert blocked WB in SHCChad and I  did the Leak checked TM2
tube heater (+) water line  with rubber
insert plugged water block on " D" 
 001.JPG002.JPG003.JPG004.JPG 
  598   Thursday, February 13, 2014, 13:30 David WangSouth Hot-CellRepairTM2 pressure test on TM2 tube heater +(D) water line.Chad and I did the pressure test on TM2tube
heater+(D) water  line at SHC with shop
air.We tested from 30psi to 80psi on both
  
  599   Thursday, February 13, 2014, 14:15 David WangSouth Hot-CellRepairTM2 pressure test on TM2 tube heater +(D) water line.

    

       
            
 007.JPG008.JPG013.JPG 
  600   Thursday, February 13, 2014, 14:23 David WangSouth Hot-CellRepairTM2 Leak check on TM2 tube heater (+) water line with blank off(elastic seal) installed on WB.Chad and I did the leak check on TM2 tube
heater (+) water line  with blank off(
+ elastic o ring seal) installed on "D" 
 005.JPG001.JPG 
  601   Monday, February 17, 2014, 09:32 David WangConditioning StationRepairTM2 helium pressure test on TM2 tube heater +(D) water line.I did the helium pressure test on Tube
heater+ line this morning. The  vacuum on
CS and TM2 are very good. The base lake rate
 6x 
  602   Tuesday, February 18, 2014, 11:26 David WangConditioning StationRepairTM2 I stopped turbo pumps and disconnected vacuum system on TM 2 and CSI stopped turbo pumps and disconnected
vacuum system on TM2 and CS. The TM2 will
be moved to SHC for C seal installation on
  
  604   Thursday, February 20, 2014, 11:04 chad fisherSouth Hot-CellRepairTM2 Readying TM2 for C-Seal Leak CheckContainment box has been removed and water
block jig installed.
 TM2_20140220_01.jpg 
  605   Monday, February 24, 2014, 11:05 chad fisherSouth Hot-CellRepairTM2 Circuit D blank offThe blank off with the o-ring has been
removed, manipulator fixed, circuit D water
block sealinhg surfaces cleaned and blank
  
  606   Monday, February 24, 2014, 12:09 chad fisherSouth Hot-CellRepairTM2 C-seal blank off testCircuit D has passed the vacuum leak check.
Jig has been removed and containment box
re-installed for move to conditioning station.
 TM2_20140224_1.jpg 