ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
560
|
Friday, November 29, 2013, 11:54 |
chad fisher | South Hot-Cell | Repair | TM3 | | Steerer short investegation | Using in cell camera and transit the suspect
line on the steerers was inspected as best
as possible. An existing photo of the complete |
  |
561
|
Friday, November 29, 2013, 11:57 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Steerer short investegation |
|
|
563
|
Tuesday, December 03, 2013, 09:58 |
David Wang | ITW | Standard Operation | TM4 | | I moved 5 shielding blocks from ITW to block storage area. | I moved 5 shielding blocks from ITW to
block storage area. |
|
564
|
Tuesday, December 03, 2013, 10:35 |
Travis Cave | ITW | Standard Operation | | | fields above and in the target station with blocks off | The blocks have been removed from the west
target station. The fields at the top of
the target pit at the railing at waist level |
|
565
|
Tuesday, December 03, 2013, 14:14 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV conditioning | It was attempted to HV condition
TM2 to 55kV and leave it operating there
for an hour to demonstrate stability. Unfortunately |
|
568
|
Wednesday, December 04, 2013, 11:15 |
David Wang | ITE | Repair | TM4 | | New bolts are installed on ITE TP3. | I installed 8 new bolts(3/8-16 UNC x1.25
STL) on the ITE TP3. The ITE TP3 replacement
job is done. Everything is connected back |
|
573
|
Thursday, December 05, 2013, 14:55 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check on TM4 target heat shield | Chad and I leak checked TM4 heat shied
water circuit at SHC. The pumping down was
very good.Base leak rate 0.0xe-9 atm.cc/sec. |
|
574
|
Thursday, December 05, 2013, 14:57 |
David Wang | ITE | Standard Operation | TM4 | | Connected TM4 in ITW | I connected TM4 in ITE. All turbo pumps
have been started and wok fine including
new TP3. Everything is good so far. |
|
575
|
Friday, December 06, 2013, 15:09 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | TM2 no source tray 55kV 1 hour | Today 55kV was applied to TM2 and held
for over 1 hour with the EINZEL at 27.5kV.
There were 2 sparks and the current was unstable |
 |
577
|
Monday, December 09, 2013, 14:47 |
David Wang | ITE | Standard Operation | TM4 | | I moved 5 shielding blocks from block storage area to ITE. | I moved 5 shielding blocks to ITE. The
ITE is configured to take proton beam. |
|
578
|
Thursday, December 12, 2013, 11:14 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV Chase Electrical Test | While under vacuum Travis and I completed
diagnostics of the HV chase. Majority of
the lines showed OL at 1kV but there were |
|
579
|
Thursday, January 09, 2014, 11:07 |
chad fisher | South Hot-Cell | Maintenance | | | Field Level | I have managed to reduce the field at the
broken manipulator from 12 mSv/h to 400 uSv/h. |
|
580
|
Thursday, January 16, 2014, 10:36 |
chad fisher | South Hot-Cell | Repair | | | East Manipulator Repair | The repair/cable replacement on the east
manipulator is now complete.
Yesterday's initail cable replacement |
 |
581
|
Monday, January 20, 2014, 13:35 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks had been moved out of ITE | 5 SHIELDING BLOCKS HAD BEEN MOVED OUT OF
ITE.AIR SAMPLE AND SWIPED FIRST BLOCK AND
ITE PIT.NOTHING HAD BEEN FOUND ON ALPHA MONITOR |
|
582
|
Monday, January 20, 2014, 13:38 |
David Wang | ITE | Standard Operation | TM4 | | DISCONNECTED TM4 IN ITE. | I DISCONNECTED TM4 IN ITE. ALL WATER LINES
HAD BEEN PURGED OUT WITH PRESSURE AIR. |
|
586
|
Wednesday, January 22, 2014, 10:51 |
David Wang | ITE | Repair | | | Removed 4 shielding blocks located on top of preseperator in TH | Travis and I removed 4 shielding blocks
located on top of pre-seperator in
TH. This is a job for ITE harp 9 re-installation |
|
590
|
Monday, February 03, 2014, 14:45 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent targets to mini storage and the F-308s to the Target Hall | Targets NiO#1(101), Nb#5(85), TaC#1(92),
and ZrC#5(81) have been moved from the storage
vault and placed in the mini storage. The |
 |
591
|
Tuesday, February 04, 2014, 08:04 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line. | Chad and I leak checked TM2 tube heater(+)
water line yesterday afternoon. The water
line was difficult to pump down on base leak |
 |
592
|
Tuesday, February 04, 2014, 09:42 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. | Chad and I did a pressure test on TM2 tube
Heater+(D) water line.I pressurized the D
line with shop air from quick connectors(both |
10x |
593
|
Wednesday, February 05, 2014, 14:05 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line from inside service cap in TH. | Bevan and I did a leak check on TM2 tube
heater+ from inside service cap in TH. The
leak detector base leak rate 0.0xE-9 atm.cc/sec, |
  |