  RH-ISAC, Page 81 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  1102   Wednesday, October 14, 2015, 14:49 David WangSouth Hot-CellStandard OperationTM2 Install new high current cables to TM2I installed a set of new high current cables
for TM2 Febiad run. The top of TM2 
is configured to Febiad mode. See attachments
 TM2_Febiad_High_current_cables_047.JPGTM2_Febiad_High_current_cables_048.JPGTM2_Febiad_High_current_cables_049.JPG 
  1103   Thursday, October 15, 2015, 08:07 David WangSouth Hot-CellStandard OperationTM2no targetTM2 no target electrical check at SHC.I did a TM2 no target electrical check
at SHC this morning. A to RU at 500v 
is 250K which is low.   anode-
 TM2_electrical_check_2015-10-16_no_target.pdf 
  1124   Monday, November 16, 2015, 08:04 David WangConditioning StationStandard Operation  Target Hall schedule from Sep 08th 2015 to Dec 25th 2015Update TH schedule according to changes.
See attachment 1,2 .
update TH schedule weekly. See attachments
 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp 
  1127   Monday, November 16, 2015, 10:37 David WangConditioning StationRepairTM3 TM3 has been disconnected at TCS.I stopped the TM3 and TCS vacuum pumps
and water system. The TM3 is disconnected
and vented. It will be moved to silo this
  
  1138   Thursday, November 26, 2015, 06:25 David WangConditioning StationStandard OperationTM4UC#14TM4 vacuum has been connected in TCS.TM4 vacuum has been connected in TCS. All
vacuum pumps were started yesterday. The
pumping down of TM4 and TCS are good so far.
  
  1139   Thursday, November 26, 2015, 07:34 David WangConditioning StationStandard OperationTM4UC#14Helium pressure test on TM4 HS line at CS I did helium pressure test on TM4 HS line
at TCS this morning.  70psi helium 3
minutes, 0.0xE-9 atm.cc/sec base leak rate.
  
  1140   Thursday, November 26, 2015, 07:37 David WangConditioning StationStandard OperationTM4UC#14TM4 has been connected at CSTM4 has been connected at TCS. The water
system is started. The TCS HV cover for TM4
is installed also. Basically, The TM4 is
  
  1142   Monday, November 30, 2015, 11:46 David WangConditioning StationStandard Operation  Target Hall schedule from Sep 08th 2015 to Dec 25th 2015Weekly update TH schedule according to
changes. see attachment 1,2 .
Update TH schedule before the weekend.
 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp 
  1143   Tuesday, December 01, 2015, 06:41 David WangConditioning StationStandard OperationTM4UC#14Turned off TCS all vacuum pumps and water pumps.I turned off TCS vacuum and water pumps.
The TSC and TM4 are still under vacuum condition.
  
  1146   Tuesday, December 01, 2015, 14:30 David WangITEStandard OperationTM4UCx 13TM4 has been connected in ITETM4 has been connected in ITE. All turbo-pumps
are started. Everything is good so far.
  
  1153   Friday, January 22, 2016, 14:24 David WangSouth Hot-CellStandard Operation  2016 Winter Shut Down Target Hall Schedule (sketch)Post a sketch of 2016 winter shut down
target hall schedule. see attachment 1,2
 UPDATE THE SCHEDULE ACCORDING
 2016_winter_shut_down__target_hall_schedule.pdf2016_winter_shut_down__target_hall_schedule.mpp2016_winter_shut_down__target_hall_schedule.pdf2016_winter_shut_down__target_hall_schedule.mpp 
  1154   Friday, February 12, 2016, 13:00 David WangConditioning StationStandard Operation  2016 Winter Shut Down Target Hall Schedule 2016 Winter shut down target hall schedule.
See attachments1,2.
 update the schedule weekly.
 6x 
  1156   Thursday, February 25, 2016, 06:48 David WangITEStandard Operation  4 Shielding blocks have been transferred from ITE to block storage area.Dan and I transferred 4 shielding blocks
from ITE to block storage area. The ITE pit
is opened now.
  
  1157   Thursday, February 25, 2016, 06:52 David WangConditioning StationStandard Operation  stop CS vacuum pumps.I stopped the conditioning station vacuum
pumps. The CS is still under vacuum without
venting.
  
  1158   Thursday, February 25, 2016, 09:27 David WangITWStandard OperationTM2 TM2 has been disconnected in ITWTM2 has been disconnected in ITW (except
vacuum lines). The vacuum system is still
operating.
  
  1159   Thursday, February 25, 2016, 09:29 David WangITEStandard OperationTM4 TM4 has been disconnected in ITE.TM4 has been disconnect in ITE(except 
vacuum lines). The ITE vacuum system is still
operating.
  
  1160   Wednesday, March 02, 2016, 09:51 David WangITWStandard OperationTM2 all water lines on TM2 and TM4 are purged.All water lines on TM2 and TM4 are purged
for upcoming water lines helium pressure
test.
  
  1161   Wednesday, March 02, 2016, 10:04 David WangITWStandard OperationTM2 Leak check on ITW and TM2.Dan and I leak checked TM2 and ITW primary
vacuum vessel. It was found a 1X E-7 atm.cc/sec
leak on top T flange seal between TM2 and
  
  1162   Friday, March 04, 2016, 12:34 David WangITEStandard OperationTM4 TM4 ITE annual leak checkDan and I finished TM4 and ITE annual leak
check on primary and secondary vacuum vessel.
We found one leak on a KF25  blank off
  
  1163   Friday, March 04, 2016, 13:58 David WangConditioning StationStandard Operation  2016 Winter Shut Down Target Hall ScheduleUpdate Schedule according to changes.See
attachment1, 2.
 Re-post it after some minor
 8x 