Entry  Wednesday, September 23, 2015, 14:32, David Wang, Conditioning Station, Standard Operation, TM4, Ta#45, Helium pressure test on TM4 HS line at CS 
Entry  Wednesday, September 23, 2015, 14:35, David Wang, Conditioning Station, Standard Operation, TM4, Ta#46, TM4 has been connected at CS 
Entry  Thursday, September 24, 2015, 07:00, David Wang, Conditioning Station, Maintenance, TM4, Ta#46, Turned off TCS all vacuum pumps and water pumps. 
Entry  Friday, September 25, 2015, 07:56, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp
Entry  Monday, September 28, 2015, 10:10, David Wang, Conditioning Station, Standard Operation, TM4, Ta#46, Switched off CS vacuum pumps and water system 
Entry  Tuesday, September 29, 2015, 12:31, David Wang, ITE, Standard Operation, TM4, Ta#46, TM4 has been connected in ITE 
Entry  Tuesday, October 06, 2015, 12:50, David Wang, ITE, Standard Operation, TM4, Ta#46, 5 Shielding blocks have been transferred from ITW to ITE. 
Entry  Tuesday, October 06, 2015, 12:50, David Wang, ITE, Standard Operation, TM4, Ta#46, 5 Shielding blocks have been transferred from ITW to ITE. 
Entry  Tuesday, October 06, 2015, 13:00, David Wang, ITE, Repair, TM4, , spark on top of TM4 in ITE 
Entry  Tuesday, October 06, 2015, 13:25, David Wang, ITE, Standard Operation, TM4, , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdf
Entry  Thursday, October 08, 2015, 14:08, David Wang, South Hot-Cell, Standard Operation, TM3, Dummy target febiad., TM3 has been moved from SHC to NW silo 
Entry  Tuesday, October 13, 2015, 10:53, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp
Entry  Wednesday, October 14, 2015, 12:42, David Wang, ITW, Standard Operation, TM2, ZrC#7, TM2 has been disconnected in ITW  
Entry  Wednesday, October 14, 2015, 12:44, David Wang, ITW, Standard Operation, TM2, ZrC#7, TM2 has been moved from ITW to SHC 
Entry  Wednesday, October 14, 2015, 12:48, David Wang, South Hot-Cell, Standard Operation, TM2, ZrC#7, TM2 ZrC#7 after run electrical check at SHC. ZrC_#7_after_run_electrical_check.pdf
Entry  Wednesday, October 14, 2015, 14:49, David Wang, South Hot-Cell, Standard Operation, TM2, , Install new high current cables to TM2 TM2_Febiad_High_current_cables_047.JPGTM2_Febiad_High_current_cables_048.JPGTM2_Febiad_High_current_cables_049.JPG
Entry  Thursday, October 15, 2015, 08:07, David Wang, South Hot-Cell, Standard Operation, TM2, no target, TM2 no target electrical check at SHC. TM2_electrical_check_2015-10-16_no_target.pdf
Entry  Monday, November 16, 2015, 08:04, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp
Entry  Monday, November 16, 2015, 10:37, David Wang, Conditioning Station, Repair, TM3, , TM3 has been disconnected at TCS. 
Entry  Thursday, November 26, 2015, 06:25, David Wang, Conditioning Station, Standard Operation, TM4, UC#14, TM4 vacuum has been connected in TCS. 