  513   Friday, October 18, 2013, 15:55 Bevan MossConditioning StationStandard OperationTM4 Turbo Pumps are on The Turbo pumps are now running on
TCS
  
  514   Monday, October 21, 2013, 10:52 Bevan MossConditioning StationStandard OperationTM4 Cooling On and Electrical Connections Made The electrical connection have been
made and cooling package was started at ~10:50am
today
  
  515   Monday, October 21, 2013, 12:29 Bevan MossConditioning StationRepairTM4 BIAS Canbus There is something wrong with the
BIAS canbus controller. It says that it is
not alive and has timed out. I have tried
  
  518   Tuesday, October 22, 2013, 16:52 Bevan MossConditioning StationRepair  Canbus base card for BIAS  The base card in the canbus BIAS
module was determined to be faulty. Dave
Morris removed a card VECC to repair the
  
  519   Tuesday, October 22, 2013, 17:04 Bevan MossConditioning StationStandard OperationTM4 HV testing This afternoon TM4 with the coil
removed was tested with HV. The EINZEL LENS
was first tested independently while the
 22102013_TM4_Coil_removed_EL_testing_(1).txt 
  520   Tuesday, October 22, 2013, 17:07 Bevan MossConditioning StationStandard Operation  services shut down The turbo pump, roughing pump, have
been turned off and the valves for venting
opened. The cooling package has also been
  
  527   Friday, October 25, 2013, 06:58 David WangSouth Hot-CellStandard OperationTM4 Leak check on TM4 target heat shieldMaico and I leak checked HS circuit after
Chad installed the target. The circuit was
a little bit difficult o pump down because
  
  531   Thursday, October 31, 2013, 10:36 David WangITWStandard OperationTM4 I moved 5 shielding blocks from ITE to ITW.I moved 5 shielding blocks from ITW to
ITE. The ITW  is configured to take
proton beam.
  
  534   Monday, November 04, 2013, 10:46 chad fisherSouth Hot-CellRepairTM2 TM2 ExplorationTM2 is now in the hot cell with the containment
box off for inspection and eventual blank
off off the water blocks.
 TM2_20131104.jpg 
  535   Tuesday, November 05, 2013, 10:37 chad fisherSouth Hot-CellRepairTM2 Thermocouple wire removalThe old thermocouple wire has been sucessfully
removed from the module.
Thanks Bevan, Travis and David.
  
  536   Wednesday, November 06, 2013, 10:41 David WangSouth Hot-CellRepairTM2 Installed 2 turbopumps on TM2Bevan and I installed 2 turbo pumps on
TM2. The o- ring flanges on TM2 had been
cleaned before the installation.
  
  537   Tuesday, November 12, 2013, 09:51 David WangITEStandard OperationTM3 TM3 disconnectionTM3 has been disconnected this morning
and  purged all HV water lines. I found
the power plug for all turbo pump fans wasnt
  
  538   Tuesday, November 12, 2013, 10:59 Bevan MossSouth Hot-CellStandard OperationTM2 Electrical Test Don Jackson and Myself completed
started an electrical test on TM2. All lines
passed the with OL to ground. When testing
 tm2_elec_test.pdf 
  539   Tuesday, November 12, 2013, 12:43 Bevan MossConditioning StationStandard OperationTM2 TM2 moved from SHC to TCS TM2 was moved by myself and David
from the SHC to the TCS. Move went well.
Curiously the fields on the module were measured
  
  540   Tuesday, November 12, 2013, 14:31 Bevan MossConditioning StationStandard OperationTM2 Turbo pumps started The turbo pumps have been started
on TM2 and the conditioning station.
  
  541   Tuesday, November 12, 2013, 14:33 Bevan MossConditioning StationRepair  Cooling manifold returned The cooling manifold for the conditioning
station high power water cooled lines has
been returned. The cooling package can once
  
  542   Wednesday, November 13, 2013, 10:01 David WangConditioning StationRepairTM2 TM2 leak check at conditioning stationI leak checked TM2 at conditioning station
this morning. All air to vacuum seals  on
the top of the module are good. All water
 TM2_leak_check_at_CS_2013-11-13.pdf 
  543   Thursday, November 14, 2013, 08:08 chad fisherSouth Hot-CellRepairTM2 TM2 Blank off and jig removalFirday, November 8 all water blocks (excluding
I and K) were blanked off and vacuum leak
checked. No responses were found. (First
 TM2_20131108.jpgTM2_20131112.jpg 
  544   Friday, November 15, 2013, 16:48 Bevan MossConditioning StationStandard OperationTM2 HV Testing High voltage testing was started
on TM2 with no source tray today. The maximum
stable for 1 minute voltage reached was 47.5kV
 TM2_conditioning_15112013.JPG15112013_TM2_No_source_tray_HV_test.txt 
  545   Monday, November 18, 2013, 11:54 Bevan MossConditioning StationRepairTM2 Fault on TCS Chill This morning when I went to start
HV conditioning CP2 and CP3 both had faults
and the temperature of the water was ~27C.
  