  RH-ISAC, Page 80 of 140  Not logged in ELOG logo
ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2226   Wednesday, June 09, 2021, 10:48 David WangSouth Hot-CellStandard OperationTM2 TM2 containment box leak check. Chad installed containment box back to
TM2 yesterday. We leak checked VCR joints
on window line.    No leak.
  
  2227   Thursday, June 10, 2021, 14:54 David WangNorth Hot-CellStandard OperationTM2UCX33 UCX 33 on TM2 electical check at NHC.TM2 UCX33# electrical check and leak check
results. See attachment. 
 UCX33_TM2_electrical_check.pdf 
  2228   Friday, June 11, 2021, 10:36 David WangConditioning StationStandard OperationTM2UCX33#TM2 leak check at TCSLeak checked TM2 service cap at TCS. helium
pressure checked containment box window and
HS cooling lines.  No leak on service
  
  2229   Tuesday, June 22, 2021, 15:35 David WangITWStandard OperationTM2UCX33#TM2 has been connected it ITW. TM2 has been connected it ITW.  All
turbo pumps are started. 
  
  2238   Wednesday, August 04, 2021, 17:24 David WangNorth Hot-CellStandard OperationTM2UCx34#UCX 34# on TM2 electical check and HS leak check at NHC.The job is done with Matt at NHC. All TGHT
and TBHT bolts are torque wrench tight in
NHC. HS leak check result is good.
 UCX34_TM2_electrical_check.pdf 
  2248   Tuesday, September 21, 2021, 13:47 Travis CaveNorth Hot-CellStandard OperationTM2UC#34Module move TM#2 with UC#34 has been moved from
ITW to the north hot cell had the target
removed and then moved to the south west
  
  2251   Monday, September 27, 2021, 14:29 Travis CaveITWStandard OperationTM2Graphite #3Module move TM#2 with C#3 has been moved from
the north hot cell to ITW. Also for the up
coming site wide power outage, the ISAC Target
  
  2252   Monday, October 04, 2021, 09:27 Frank SongITWStandard OperationTM2C#3Module Connection TM2 been connected with new target
C#3 in ITW. 
 IMG_3711.jpgIMG_3712.jpgIMG_3713.jpgIMG_3714.jpg 
  2253   Monday, October 04, 2021, 09:33 Frank SongNorth Hot-CellStandard OperationTM2C#3TM2 with target connection test the test was done when TM2 sit on
NHC.
 IMG_3710.jpg 
  2262   Tuesday, November 09, 2021, 09:58 Frank SongITWStandard OperationTM2C#3module disconnection the module TM2 with target C#3 was
disconnected at ITW and is being remoted
moving to SHC.
 IMG_4315.jpg 
  2263   Tuesday, November 09, 2021, 14:35 Adam NewsomeSouth Hot-CellStandard OperationTM2UCX#36Module MoveTM#2 was moved from ITW to SHC,
then moved back to ITW.
  
  2264   Wednesday, November 10, 2021, 08:29 Frank SongSouth Hot-CellStandard OperationTM2UC#36electrical check An electrical check of TM2 with target
UC#36 and no external connections was finished
at SHC. 
 IMG_4322.JPG 
  2265   Wednesday, November 10, 2021, 08:32 Frank SongITWStandard OperationTM2UC#36Module Connection TM2 with target UC#36 was connected
at ITW.
 IMG_4323.JPG 
  2283   Wednesday, January 05, 2022, 12:45 Frank SongITWMaintenanceTM2UC#36TM2 SIS with Target and No external Connections electrical checked in ITW  TM2_with_UCx36.jpg 
  2284   Thursday, January 06, 2022, 10:37 David WangITWStandard OperationTM2 ITW vacuum vessel and TM2 internal cooling lines leak check in pit. Frank  and I finished ITW and TM2 leak
check. TM2 internal water-cooling lines 
are leak free. They passed 70 psi helium
  
  2287   Monday, January 10, 2022, 12:38 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from ITW to NHC.Travis and Nadia moved TM2 from ITW to
NHC this morning. The move is smooth and
successful.
  
  2289   Tuesday, January 11, 2022, 11:51 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from NHC to SMP.TM2( no target ) has been moved  from
NHC to SMP.  The moving is smooth and
successful. 
  
  2291   Monday, January 17, 2022, 10:44 Frank SongSouth Hot-CellStandard OperationTM2UC#36 (the target removed)TM2 electrical check without Target. An electric check was done right
after module moving from SMP to SHC. 
 TM2_without_UCx36_at_SHC_(2).jpg 
  2313   Monday, April 04, 2022, 21:04 Carla BabcockConditioning StationDevelopmentTM2 HV testing of IGLIS wires in TM2TM2 is in the TCS without containment box
for HV testing following the installation
of the IGLIS wiring.
  
  2314   Wednesday, April 13, 2022, 11:54 Carla BabcockSouth Hot-CellMaintenanceTM2 EZL cable changeChad changed the EZL cable and plugs on
TM2. New cable runs along the cable trays.
 MicrosoftTeams-image_(25).png 