  854   Thursday, March 05, 2015, 14:30 chad fisherSouth Hot-CellDevelopment  Dissection BoxBox for dissecting targets almost complete.
Should be done tomorrow.
 20150305_142144.jpg 
  855   Monday, March 09, 2015, 09:42 chad fisherSouth Hot-CellDevelopment  Hot Cell Table Swiping3 swipes of the south hot cell table were
taken from the target hall through the roof
hatch (2 standard, 1 alpha).
  
  856   Monday, March 09, 2015, 14:01 chad fisherSouth Hot-CellStandard OperationTM1ThO#1ThO#1 removedThO#1 has been removed from TM1 and placed
into the plastic dissection box.
Containment box cover has been reinstalled
  
  865   Friday, March 20, 2015, 13:37 chad fisherSouth Hot-CellDevelopment  TM2 Optics TrayFinal assembly and alignment of TM2 optics
tray continued today. Front section is "aligned".
 20150320_113132[2].jpg20150320_113018_1[1].jpg 
  867   Monday, March 23, 2015, 14:03 chad fisherSouth Hot-CellStandard Operation Ta#45Ta#45 inserted into hot cellTa#45 has been inserted into the hot cell.
Swipe taken of inner tool port area: 100000
counts/min.
  
  869   Tuesday, March 24, 2015, 09:47 chad fisherSouth Hot-CellStandard OperationTM4Ta#45Ta#45 installedTa#45 has been installed onto TM4 and is
ready for leak and electrical check. High
current fasteners torqued to 130 in.lbs.
  
  871   Wednesday, March 25, 2015, 10:37 chad fisherSouth Hot-CellDevelopment  TM2 optics tray buildTM2 optics tray build is continuing. Going
well. Hope to have assembly and alignment
finished by Friday.
 20150325_101718.jpg20150325_101735.jpg20150325_102024.jpg 
  879   Tuesday, March 31, 2015, 11:36 chad fisherSouth Hot-CellDevelopmentTM2 TM2 Optics Tray CompleteTM2 optics tray is complete.
Master alignment tray: 0 up/down,
0 left/right
 20150331_OPTICS_FRONT.jpg20150331_OPTICS_MIDDLE.jpg20150331_OPTICS_BACK.jpg 
  907   Friday, May 01, 2015, 08:27 chad fisherSouth Hot-CellRepairTM2 Containment Box RemovalContainment box has been removed in preparation
for wire replacement.
  
  910   Tuesday, May 05, 2015, 10:57 chad fisherSouth Hot-CellRepairTM2 TM2 WiringOld wiring was removed yesterday, new wiring
run thru the vacuum chase. Old IMG gauge
removed today, new cable trays installed
 TM2_New_Wiring_20150504_13.jpgTM2_Wiring_20150505_10.jpg 
  915   Wednesday, May 13, 2015, 13:55 chad fisherSouth Hot-CellRepairTM2 Shutter removalTM2 has been successfully de-shuttered.
All went pretty much according to
plan except I had to remove one fastener
 TM2_20150513_131339.jpgTM2_20150513_134232.jpg 
  918   Tuesday, May 26, 2015, 14:34 chad fisherSouth Hot-CellRepairTM2 Shutter replacementThe shutter in TM2 was successfully replaced
today.
New lock washer and nut were installed
 Shutter.jpg 
  924   Tuesday, June 02, 2015, 09:43 chad fisherSouth Hot-CellStandard OperationTM4SiC#31SiC#31 installedTa #45 has been removed from TM4 and SIC#31installed.   
  934   Thursday, June 04, 2015, 08:27 chad fisherAssembly/Bench TestRepairTM2 TM2 Source Tray C-seal removal and inspectionSource tray for TM2 has been moved to the
alignment area by Dan and co.
This morning Dan removed the c-seals
 TM2_20150604_01.jpgTM2_20150604_02.jpgTM2_20150604_03.jpgTM2_20150604_04.jpgTM2_20150604_05.jpg 
  935   Monday, June 08, 2015, 14:40 chad fisherAssembly/Bench TestRepairTM2 TM2 Source Tray Final Alignment CheckFinal Alignment checks of the TM2 source
tray took place today.
Mater Jig: Front - 0,0 Back - 0 left,
  
  936   Tuesday, June 09, 2015, 09:49 chad fisherAssembly/Bench TestRepairTM2 TM2 Source Tray Final Alignment CheckFinal alignment continued this morning.
Steerers have been aligned to 0.001
low, 0.000 left/right wrt master jig.
  
  937   Tuesday, June 09, 2015, 14:36 chad fisherAssembly/Bench TestRepairTM2 TM2 Source Tray Final InspectionFinal inspection took place with Pierre,
Grant, Friedhelm and Anders present.
Two action items were raised:
 20150609_132818.jpg20150609_132825.jpg20150609_132833.jpg20150609_132839.jpg20150609_132851.jpg 
  942   Thursday, June 11, 2015, 13:11 chad fisherAssembly/Bench TestRepairTM2 Measurements beyween ground Plane and HV TM2 Source taryI've taken measurements between HV and
ground circuit on TM2 source tray as instructed.
At their closest points:
  
  944   Friday, June 12, 2015, 07:49 chad fisherAssembly/Bench TestRepairTM2 New TM2 Source Tray Ground to HV MeasurementsAfter bending and leak checking the new
measurements from ground to HV on the TM2
source tray are:
  
  947   Monday, June 15, 2015, 10:16 chad fisherSouth Hot-CellRepairTM2 C.B. offAs per scedule TM2 containment box has
been removed.
 
 20150615_101043_1.jpg 