854
|
Thursday, March 05, 2015, 14:30 |
chad fisher | South Hot-Cell | Development | | | Dissection Box | Box for dissecting targets almost complete.
Should be done tomorrow. |
|
855
|
Monday, March 09, 2015, 09:42 |
chad fisher | South Hot-Cell | Development | | | Hot Cell Table Swiping | 3 swipes of the south hot cell table were
taken from the target hall through the roof
hatch (2 standard, 1 alpha). |
|
856
|
Monday, March 09, 2015, 14:01 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | ThO#1 removed | ThO#1 has been removed from TM1 and placed
into the plastic dissection box.
Containment box cover has been reinstalled |
|
865
|
Friday, March 20, 2015, 13:37 |
chad fisher | South Hot-Cell | Development | | | TM2 Optics Tray | Final assembly and alignment of TM2 optics
tray continued today. Front section is "aligned". |
|
867
|
Monday, March 23, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | | Ta#45 | Ta#45 inserted into hot cell | Ta#45 has been inserted into the hot cell.
Swipe taken of inner tool port area: 100000
counts/min. |
|
869
|
Tuesday, March 24, 2015, 09:47 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Ta#45 installed | Ta#45 has been installed onto TM4 and is
ready for leak and electrical check. High
current fasteners torqued to 130 in.lbs. |
|
871
|
Wednesday, March 25, 2015, 10:37 |
chad fisher | South Hot-Cell | Development | | | TM2 optics tray build | TM2 optics tray build is continuing. Going
well. Hope to have assembly and alignment
finished by Friday. |
|
879
|
Tuesday, March 31, 2015, 11:36 |
chad fisher | South Hot-Cell | Development | TM2 | | TM2 Optics Tray Complete | TM2 optics tray is complete.
Master alignment tray: 0 up/down,
0 left/right |
|
907
|
Friday, May 01, 2015, 08:27 |
chad fisher | South Hot-Cell | Repair | TM2 | | Containment Box Removal | Containment box has been removed in preparation
for wire replacement. |
|
910
|
Tuesday, May 05, 2015, 10:57 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Wiring | Old wiring was removed yesterday, new wiring
run thru the vacuum chase. Old IMG gauge
removed today, new cable trays installed |
|
915
|
Wednesday, May 13, 2015, 13:55 |
chad fisher | South Hot-Cell | Repair | TM2 | | Shutter removal | TM2 has been successfully de-shuttered.
All went pretty much according to
plan except I had to remove one fastener |
|
918
|
Tuesday, May 26, 2015, 14:34 |
chad fisher | South Hot-Cell | Repair | TM2 | | Shutter replacement | The shutter in TM2 was successfully replaced
today.
New lock washer and nut were installed |
|
924
|
Tuesday, June 02, 2015, 09:43 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 | SiC#31 installed | Ta #45 has been removed from TM4 and SIC#31installed. |
|
934
|
Thursday, June 04, 2015, 08:27 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray C-seal removal and inspection | Source tray for TM2 has been moved to the
alignment area by Dan and co.
This morning Dan removed the c-seals |
|
935
|
Monday, June 08, 2015, 14:40 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray Final Alignment Check | Final Alignment checks of the TM2 source
tray took place today.
Mater Jig: Front - 0,0 Back - 0 left, |
|
936
|
Tuesday, June 09, 2015, 09:49 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray Final Alignment Check | Final alignment continued this morning.
Steerers have been aligned to 0.001
low, 0.000 left/right wrt master jig. |
|
937
|
Tuesday, June 09, 2015, 14:36 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray Final Inspection | Final inspection took place with Pierre,
Grant, Friedhelm and Anders present.
Two action items were raised: |
|
942
|
Thursday, June 11, 2015, 13:11 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | Measurements beyween ground Plane and HV TM2 Source tary | I've taken measurements between HV and
ground circuit on TM2 source tray as instructed.
At their closest points: |
|
944
|
Friday, June 12, 2015, 07:49 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | New TM2 Source Tray Ground to HV Measurements | After bending and leak checking the new
measurements from ground to HV on the TM2
source tray are: |
|
947
|
Monday, June 15, 2015, 10:16 |
chad fisher | South Hot-Cell | Repair | TM2 | | C.B. off | As per scedule TM2 containment box has
been removed.
|
|