  28   Wednesday, September 28, 2011, 09:07 Travis CaveITEStandard OperationTM4Ta#36Move of TM#4 from East target station to south hot cell.Move of TM#4 with Ta#36 from East target
station to south hot cell, move went well.
  
  67   Monday, January 09, 2012, 14:44 David WangITEMaintenanceTM4 ITE and TM4 2012 winter shut down leak check is completed.I did a vacuum leak check on all ITE primary
vacuum vessel and secondary vessel.I also
did a helium pressure test(80psi ) on all
  
  70   Thursday, January 12, 2012, 14:32 David WangITERepairTM4 TP2 on TM4 has been replaced TP2 on TM4 has been replaced with a new
turbo pump , I didnt  reset the controller
in electrical room.So this new pump start
  
  71   Monday, January 16, 2012, 09:30 David WangITEMaintenance  Changed all old inducion coils for flow sensors in ITEI had changed all old induction coils for
flow sensors in ITE .I checked all ITE water
signals on control boards in electrical room.They
  
  81   Thursday, April 05, 2012, 10:30 David WangITEStandard OperationTM4 I moved 5 shielding blocks back to ITE this morning. MAA is secured .The ITE and MAA are
ready for taking proton beam now.
  
  95   Thursday, April 26, 2012, 09:23 David WangITERepairTM4 changed flow wheel on ITE TM4 contaiment box water circuitThe the magnetic field on ITE TM4 flow
wheel  was gone yesterday.So there is
no water signal on this circuit. The water
  
  96   Thursday, April 26, 2012, 13:01 David WangITERepairTM4 Replaced TM4 EE water flow wheel in ITE.Due to weak magnetic field on TM4 EE water
flow wheel, we have two times  intermittent
water signal on this circuit this morning.
  
  98   Tuesday, May 08, 2012, 10:28 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.I disconnected TM4 in ITE. The heat shield
water circuit is purged. I  closed the
water supply to ITE.Now, the water system
  
  99   Monday, May 14, 2012, 12:37 Travis CaveITEStandard OperationTM4SiC#26module moveTM#4 with SiC #26 was moved from the East
Station to the South Hot Cell. Bevan was
at the helm of the PLC. There was no issue
  
  110   Tuesday, May 22, 2012, 10:50 Travis CaveITEStandard OperationTM4SiC#27module movedModule has been moved from conditioning
station to the east target station. Move
went well.
  
  111   Tuesday, May 22, 2012, 12:36 David WangITEStandard OperationTM4sic 27TM4 connection in ITEAll TM4 connections in ITE is done. The
station and TM4 is under roughing now.
  
  112   Tuesday, May 22, 2012, 15:19 David WangITEStandard OperationTM4sic 27TM4 in ITE under pumping

Normal
0





  
  114   Monday, May 28, 2012, 13:05 David WangITEStandard Operation  I moved 5 shielding blocks from ITW to ITE .5 shielding blocks have  been transferred
from  ITW to ITE. ITE ventilation is
opened, and ITW closed. All ITE water 
  
  136   Tuesday, July 03, 2012, 10:50 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.I disconnected TM4 in ITE this morning.
The window circuit and heat shield circuit
had been purged. The general field inside
  
  144   Monday, July 09, 2012, 10:51 Travis CaveITEStandard OperationTM4UO#3module moveTM#4 with UO#3 from the conditioning station
to the east target station. Move went well.
  
  145   Monday, July 09, 2012, 16:08 David WangITEStandard OperationTM4UO#3ITM4 in ITE connected and pumping down
 

 Normal
  0

 
   
  
  150   Thursday, July 26, 2012, 08:33 David WangITEStandard OperationTM4 I moved 5 shielding blocks from ITW to ITE thisTuesday morning .  All water interlock checks for ITE
had been done. The ITE water signals  strength
and frequency(Espcially on MSP circuit) had
  
  165   Thursday, August 30, 2012, 13:57 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.I disconnected TM 4 in ITE on AUG 29th
morning.The vacuum lines stay untouched and
they will be disconnected on SEP 04th.
  
  175   Wednesday, September 12, 2012, 07:00 David WangITEStandard OperationTM4NiO #1ITM4 in ITE connected and pumping downTM4 had been connected in ITE. Six turbo
pump had been started . thepumpming diwn
is very good so far. The water interlock
  
  189   Thursday, September 27, 2012, 09:13 David WangITERepairTM4 ITE MSP water circuit flow wheel had been replaced ITE MSP water circuit flow wheel was replaced
yesterday due to poor performance. 
  