1853
|
Thursday, January 10, 2019, 09:26 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the south
hot cell to the conditioning station. |
|
1854
|
Thursday, January 10, 2019, 10:45 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 is under vacum at TCS. | TCS: TP1, TP2 and TP1S are started. |
|
1856
|
Friday, January 11, 2019, 13:17 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS and TM2 vacuum system are switched off for this Sunday power outage. | I will restart all pumps Monday morning.
|
|
1858
|
Monday, January 14, 2019, 07:07 |
David Wang | Conditioning Station | Maintenance | TM2 | | Restarted TCS vacuum system . | No issue. |
|
1861
|
Tuesday, January 22, 2019, 09:56 |
David Wang | ITW | Maintenance | TM2 | | ITW water system maintenance. | ITW water system maintenance is done. All
working paddle wheels and coils are replaced.
ITW water system polyurethane tubes are replaced |
|
1863
|
Monday, January 28, 2019, 10:41 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 water lines helium pressure test at TCS | leak detector base LR: 0.0Xe-9atm.cc/sec.
helium 70 psi. test time : 3 minutes for
each circuit.The results in atm.cc/sec are |
|
1866
|
Thursday, February 14, 2019, 07:13 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS vacuum pumps have been stopped. | Preparation on TM2 move from TCS to SHC. |
|
1867
|
Thursday, February 14, 2019, 14:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
1870
|
Tuesday, February 19, 2019, 10:20 |
chad fisher | South Hot-Cell | Repair | TM2 | | Containment box removed | Containment box has been removed from TM2
in preparation for source tray removal. I
will walk Aaron through removal of the optics |
|
1871
|
Tuesday, February 19, 2019, 11:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | Optics tray removal | Aaron has removed the optics tray in TM2
in preparation for source tray removal. |
|
1872
|
Wednesday, February 20, 2019, 09:07 |
chad fisher | South Hot-Cell | Repair | TM2 | | Module side waterblock jig | I have installed the module side water
block jig. |
|
1874
|
Friday, February 22, 2019, 10:31 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source tray removal | The source tray has been removed from TM2. |
6x |
1875
|
Monday, February 25, 2019, 09:44 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water block jig | module side water block jig has been removed
in preparation for electrical checks. |
|
1876
|
Tuesday, February 26, 2019, 08:51 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box | The containment box has been reinstalled
onto TM2 in prepatation for testing in the
conditioning station. |
|
1877
|
Tuesday, February 26, 2019, 10:33 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module move | TM#2 with no source tray has been
moved from the south hot cell to the conditioning
station. |
|
1878
|
Friday, March 01, 2019, 08:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | | Conditioning TM2 without source tray | BIAS and EZL connected. No water flowing
into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV |
 |
1879
|
Friday, March 01, 2019, 09:57 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source tray removal | TM4 optics tray was installed onto the
old TM2 source tray yesterday and tray filled
with non-active metal scrap. Tray inserted |
   |
1881
|
Tuesday, March 05, 2019, 07:20 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 HV test at TCS | Spark between HV cover vertical mesh plate
and HS 60KV bias connecting clamp 90degree
angle at 55 KV on TM2 top. HV cover is removed |
|
1884
|
Thursday, March 07, 2019, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 move from TCS to SHC. | TM2 has been moved from TCS to SHC. The
move is smooth. |
|
1885
|
Thursday, March 07, 2019, 12:02 |
chad fisher | South Hot-Cell | Repair | TM2 | | Box Off water block jig on | The containment box has been removed from
TM2 and the water block jig installed in
preparation for water block polishing. |
|