782
|
Thursday, November 06, 2014, 08:07 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | TM1 has been connected in ITW. | TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to |
|
|
783
|
Thursday, November 06, 2014, 08:55 |
David Wang | ITW | Repair | TM1 | ThO#1 | primary vacuum back up pressureITH CG1 ,CG2,CG4A were high. | I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20 |
|
|
784
|
Thursday, November 06, 2014, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | CS vacuum system has been connected to TM3. | CS vacuum system has been connected
to TM3 for control system test(Dave.Morris). |
|
|
785
|
Thursday, November 13, 2014, 13:52 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | 5 Shielding blocks have been transferred from ITE to ITW. | Dan and I transferred 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam. |
|
|
786
|
Thursday, November 13, 2014, 14:01 |
David Wang | ITW | Repair | TM1 | | I replaced flow wheel and coil on ITW MSP water flow sensor. | I replaced flow wheel and coil on ITW MSP
water flow sensor which is located in ITW
pit. Before replacement, I checked the signal |
|
|
787
|
Thursday, November 13, 2014, 14:05 |
David Wang | ITE | Repair | TM4 | | Dan and I replaced flow wheel on ITE HVC2 water flow sensor. | Dan and I replaced flow wheel on ITE HVC2
water flow sensor. The old wheel did rotate
smoothly inside its SST case. The new wheel |
|
|
791
|
Tuesday, November 18, 2014, 11:14 |
David Wang | South Hot-Cell | Standard Operation | | UCx11 | crane down UCx 11 target into SHC from TH | I craned down UCx11 target from TH into
SHC. Chad was in SHC service area watching
on it. The source tray moving jig was installed |
|
|
792
|
Tuesday, November 18, 2014, 11:15 |
David Wang | ITE | Standard Operation | TM4 | Ta#44 | TM4 has been disconnected in ITE. | Dan and I disconnected TM4 in ITE. |
|
|
795
|
Wednesday, November 19, 2014, 11:12 |
David Wang | Conditioning Station | Standard Operation | TM4 | | CS roughing pump is started. | CS roughing pump is started for TM4 and
UCX 11 target. |
|
|
797
|
Thursday, November 20, 2014, 14:12 |
David Wang | ITE | Standard Operation | TM4 | UCx11 | TM4 is connected in ITE. | TM4 has been connected connect in ITE.
Water is supplied to TM4 module only. |
|
|
798
|
Thursday, November 20, 2014, 14:13 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx11 | CS and TM4 was vented with Argon gas | CS and TM4 was vented with Argon gas this
morning before it was moved from CS to ITE. |
|
|
800
|
Tuesday, November 25, 2014, 11:33 |
David Wang | South Hot-Cell | Development | | | Remove UCX 11 target transfer stand from SHC back to TH. | The stand was used for transferring UCX11
targte from TH to SHC. The stand wit target
was craned down from TH into SHC last week |
|
|
801
|
Tuesday, November 25, 2014, 12:45 |
David Wang | ITE | Standard Operation | TM4 | UCx11 | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
|
808
|
Tuesday, December 02, 2014, 13:33 |
David Wang | South Hot-Cell | Development | TM2 | | Leak check on TM2 tube heater +(D) at SHC | Chad and I leak checked TM2 tube heater+(D)
circuit at SHC with water bypass loop and
new seals installed on the water block. The |
|
|
812
|
Thursday, December 04, 2014, 16:37 |
David Wang | Conditioning Station | Development | TM2 | | connected TM2 and CS vacuum system . | I connected TM2 and CS vacuum system. All
vacuum pumps on TM2 and CS are started .The
pumping down is good so .far |
|
|
813
|
Friday, December 05, 2014, 07:47 |
David Wang | Conditioning Station | Development | TM2 | | TM2 at CS | The pumping down on TM2 at CS was good
overnight. However, the back up line pressure
is still too high for LD to get to 0.0-E-9atm.cc/sec |
|
|
814
|
Friday, December 05, 2014, 11:58 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D) water lines. | At CS, The leak detector is hooked directly
to the TM2 top service cap. The base LR 0.0xE-9
atm.cc/sec, base pressure 0.0xE-4torr. Applied |
6x |
|
827
|
Tuesday, January 06, 2015, 11:14 |
David Wang | ITE | Standard Operation | TM4 | | 4 Shielding blocks have been moved out of ITE . | 4 shielding blocks have been moved out
of ITE to block storage area. Fiona
did the survey and with me during the move. |
|
|
830
|
Thursday, January 08, 2015, 08:04 |
David Wang | ITE | Standard Operation | TM4 | | TM4 water lines have been disconnected in ITE and purged. | TM4 waterlines have been disconnected and
purged in ITE. The TM4 vacuum system is still
in operation. |
|
|
840
|
Friday, February 06, 2015, 08:06 |
David Wang | Crane | Repair | | | TH crane lost movement controls since last Friday. | Last Friday, During the crane per use check,
I found the main power supply to to crane
was shut off. I was told Don and Travis |
|