324
|
Friday, April 26, 2013, 14:31 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 refurb E.O.D. | Service tray side of the waterblock jig
is installed and all locking tabs enagaed
save the heat shield circuit. Locking tab |
|
|
325
|
Monday, April 29, 2013, 15:58 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Source Tray Removal | Chad removed the source tray from TM3 today,
see attached picture (video was also taken).
There was some interference between the window |
|
|
326
|
Tuesday, April 30, 2013, 07:47 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Source Tray Removal | The source tray has sucessfully been removed
from TM3.
I will put a report in the TM3 rev |
|
|
327
|
Tuesday, April 30, 2013, 07:51 |
chad fisher | South Hot-Cell | Repair | TM3 | | Coil line flow check | David and I checked circuits p and q (the
water cooled coil ciruit) for flow this morning
as, with the source tray still in the module, |
|
|
328
|
Thursday, May 02, 2013, 10:09 |
chad fisher | South Hot-Cell | Repair | TM3 | | Service tray water block leak check | David and I preformed a helium leak check
on the service tray waterblocks and verify
that no damage had been done during jig installation. |
|
|
329
|
Friday, May 03, 2013, 09:53 |
chad fisher | South Hot-Cell | Repair | TM3 | | 9 pin connector wiring | With the aid of nic new manipulator snap
fingers made by Maico the peek cable ties
restraining the 9 pin connector wiring to |
|
|
330
|
Monday, May 06, 2013, 15:45 |
Bevan Moss | Conditioning Station | Repair | TM3 | | 55 pin connector removed | Travis and I removed the 55 pin connector
from the service cap today. The feed through
was left in place as a new design for the |
|
|
331
|
Tuesday, May 07, 2013, 12:07 |
David Wang | ITW | Standard Operation | TM1 | | I moved 5 shielding blocks from ITE to ITW. | Water interlock check on ITW is done.
All water signals are strong on EL panel.
ITW is configured to take proton beam. |
|
|
332
|
Wednesday, May 08, 2013, 10:12 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 9 pin wiring removal | The 9 pin wiring has successfully been
removed from TM3. |
|
|
333
|
Wednesday, May 08, 2013, 13:48 |
chad fisher | South Hot-Cell | Repair | TM3 | | IMG wiring check | Checks of the wiring for the IMG are complete
and have passed. |
|
|
334
|
Thursday, May 09, 2013, 10:13 |
chad fisher | South Hot-Cell | Development | | | Mock-up Progress | The source tray for the mock-up has been
setup for waterline bending and soldering/brazing.
Thanks to Travis for finding the |
|
|
335
|
Thursday, May 09, 2013, 14:23 |
chad fisher | South Hot-Cell | Repair | TM3 | | Water Block Jig Removal | The source tray side of the water block
jig has been removed in preparation for moving
the module to the conditioning station |
|
|
336
|
Friday, May 10, 2013, 09:26 |
chad fisher | South Hot-Cell | Repair | TM3 | | Containment box reinstalled | the containment box has been reinstalled
onto TM3. After electrical checks it is ready
to move to the conditioning station...for |
|
|
343
|
Wednesday, May 15, 2013, 10:00 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | HS had been purged. The ITE is under venting.
The TM4 will be moved to SH on next Tuesday
which is May 21th. |
|
|
345
|
Wednesday, May 15, 2013, 10:20 |
Bevan Moss | Conditioning Station | Repair | | | Roof top chiller failed | I have been getting a fault on the roof
top chiller for the 2 tandem 7.5 ton chillers.
I have checked and we have water flow and |
|
|
346
|
Wednesday, May 15, 2013, 10:25 |
Bevan Moss | Conditioning Station | Repair | | | ONICON flow meter | Scott Adair from Riada sales came
to site to complete diagnostics on the ONICON
flow meter. He could not determine the problem |
|
|
347
|
Wednesday, May 15, 2013, 16:21 |
Bevan Moss | Conditioning Station | Repair | | | BIAS Current readings off by a factor of 5 | A special thanks to Kazuya, Jane
and Ray who jumped on this issue right away!
The limit of the BIAS PS was set as 20000uA |
|
|
349
|
Wednesday, May 15, 2013, 17:32 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | | TM3 in place but not connected | To confirm that the sparking was
coming from the module rather than the conditioning
station TM3 was grounded and the conditioning |
|
|
351
|
Friday, May 17, 2013, 10:04 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair | Manipulator has been sucessfully repaired.
Recieved 0.19 mSv. Took Approx. 10-20 minutes |
|
|
352
|
Friday, May 17, 2013, 12:02 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | | module move | TM#3 with no target or source trays has
been moved from the conditioning station
to the NE silo. |
|