746
|
Wednesday, September 10, 2014, 11:47 |
David Wang | ITW | Standard Operation | TM1 | | TM1 has been connected in ITW. | TM1 has been connected in ITW. ITW
and TM1 turbo pumps have been started. Water
is supplied to TM1 only. Everything is good |
|
749
|
Tuesday, September 16, 2014, 10:41 |
David Wang | ITW | Standard Operation | TM1 | ZrC #4 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 Shielding blocks have been transferred
from ITE to ITW. The ITW is configured to
take proton beam |
|
751
|
Tuesday, September 23, 2014, 11:49 |
David Wang | ITE | Standard Operation | TM4 | UCx #10 | TM4 has been disconnected in ITE. | TM4 has been disconnected and moved to
SHC from ITE. ITE was vented with argon before
move. |
|
755
|
Wednesday, September 24, 2014, 15:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#44 | Leak check on TM4 HS water line with new Ta#44 target. at SHC | This morning Chad and I leak checked TM4
HS line with new Ta#44 target installed.
I calibrated LD before the check. Before |
|
756
|
Wednesday, September 24, 2014, 15:16 |
David Wang | ITE | Standard Operation | TM4 | Ta#44 | Reconnected TM4 in ITE. | TM4 has been reconnected back to ITE. I
started all turbo pumps on ITE and TM4. The
ITE TP4s was extremely difficult to start. |
|
759
|
Friday, October 10, 2014, 10:47 |
David Wang | Conditioning Station | Development | TM3 | | TM3 has been connected in CS | TM3 has been connected in CS. All water
supplies are bypassed theTM3 on the top of
the service cap. TM3 TP2 was difficult to |
|
762
|
Tuesday, October 14, 2014, 12:19 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW. | TM1 was disconnected in ITW this morning.
Heat shield circuit is purged. |
|
768
|
Monday, October 20, 2014, 08:59 |
David Wang | Conditioning Station | Development | TM3 | | Started TCS water system. | I started TCS water system this morning
to check if the chillers work properly. |
|
769
|
Monday, October 20, 2014, 09:13 |
David Wang | Conditioning Station | Development | TM3 | | TM3 TP2 failed | TM3 TP2 stopped working this morning at
4:00 AM. I tried to start it but failed.
On normal start mode , It could not pass |
|
773
|
Wednesday, October 22, 2014, 09:41 |
David Wang | Conditioning Station | Development | TM3 | | TM3 has been disconnected at CS. | TM3 has been disconnected at CS. It is
vented and ready to move. |
|
778
|
Tuesday, November 04, 2014, 11:05 |
David Wang | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Leak check on TM1 HS water line withThO#1 installed. | Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec, |
|
782
|
Thursday, November 06, 2014, 08:07 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | TM1 has been connected in ITW. | TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to |
|
783
|
Thursday, November 06, 2014, 08:55 |
David Wang | ITW | Repair | TM1 | ThO#1 | primary vacuum back up pressureITH CG1 ,CG2,CG4A were high. | I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20 |
|
784
|
Thursday, November 06, 2014, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | CS vacuum system has been connected to TM3. | CS vacuum system has been connected
to TM3 for control system test(Dave.Morris). |
|
785
|
Thursday, November 13, 2014, 13:52 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | 5 Shielding blocks have been transferred from ITE to ITW. | Dan and I transferred 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam. |
|
786
|
Thursday, November 13, 2014, 14:01 |
David Wang | ITW | Repair | TM1 | | I replaced flow wheel and coil on ITW MSP water flow sensor. | I replaced flow wheel and coil on ITW MSP
water flow sensor which is located in ITW
pit. Before replacement, I checked the signal |
|
787
|
Thursday, November 13, 2014, 14:05 |
David Wang | ITE | Repair | TM4 | | Dan and I replaced flow wheel on ITE HVC2 water flow sensor. | Dan and I replaced flow wheel on ITE HVC2
water flow sensor. The old wheel did rotate
smoothly inside its SST case. The new wheel |
|
791
|
Tuesday, November 18, 2014, 11:14 |
David Wang | South Hot-Cell | Standard Operation | | UCx11 | crane down UCx 11 target into SHC from TH | I craned down UCx11 target from TH into
SHC. Chad was in SHC service area watching
on it. The source tray moving jig was installed |
|
792
|
Tuesday, November 18, 2014, 11:15 |
David Wang | ITE | Standard Operation | TM4 | Ta#44 | TM4 has been disconnected in ITE. | Dan and I disconnected TM4 in ITE. |
|
795
|
Wednesday, November 19, 2014, 11:12 |
David Wang | Conditioning Station | Standard Operation | TM4 | | CS roughing pump is started. | CS roughing pump is started for TM4 and
UCX 11 target. |
|