Entry  Thursday, September 04, 2014, 11:19, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 is connected in CS. 
Entry  Friday, September 05, 2014, 07:15, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS. 
Entry  Monday, September 08, 2014, 13:44, David Wang, Conditioning Station, Standard Operation, TM1, ZrC#6, TM1 is disconnected at CS. 
Entry  Wednesday, September 10, 2014, 07:12, David Wang, ITW, Repair, TM1, , Removed ITW HS and COIL flow rate monitors. 
Entry  Wednesday, September 10, 2014, 11:47, David Wang, ITW, Standard Operation, TM1, , TM1 has been connected in ITW. 
Entry  Tuesday, September 16, 2014, 10:41, David Wang, ITW, Standard Operation, TM1, ZrC #4, 5 Shielding blocks have been transferred from ITE to ITW. 
Entry  Tuesday, September 23, 2014, 11:49, David Wang, ITE, Standard Operation, TM4, UCx #10, TM4 has been disconnected in ITE. 
Entry  Wednesday, September 24, 2014, 15:03, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#44, Leak check on TM4 HS water line with new Ta#44 target. at SHC 
Entry  Wednesday, September 24, 2014, 15:16, David Wang, ITE, Standard Operation, TM4, Ta#44, Reconnected TM4 in ITE. 
Entry  Friday, October 10, 2014, 10:47, David Wang, Conditioning Station, Development, TM3, , TM3 has been connected in CS 
Entry  Tuesday, October 14, 2014, 12:19, David Wang, ITW, Standard Operation, TM1, , TM1 was disconnected in ITW. 
Entry  Monday, October 20, 2014, 08:59, David Wang, Conditioning Station, Development, TM3, , Started TCS water system. 
Entry  Monday, October 20, 2014, 09:13, David Wang, Conditioning Station, Development, TM3, , TM3 TP2 failed 
Entry  Wednesday, October 22, 2014, 09:41, David Wang, Conditioning Station, Development, TM3, , TM3 has been disconnected at CS. 
Entry  Tuesday, November 04, 2014, 11:05, David Wang, South Hot-Cell, Standard Operation, TM1, ThO#1, Leak check on TM1 HS water line withThO#1 installed. 
Entry  Thursday, November 06, 2014, 08:07, David Wang, ITW, Standard Operation, TM1, ThO#1, TM1 has been connected in ITW. 
Entry  Thursday, November 06, 2014, 08:55, David Wang, ITW, Repair, TM1, ThO#1, primary vacuum back up pressureITH CG1 ,CG2,CG4A were high. 
Entry  Thursday, November 06, 2014, 13:43, David Wang, Conditioning Station, Development, TM3, , CS vacuum system has been connected to TM3. 
Entry  Thursday, November 13, 2014, 13:52, David Wang, ITW, Standard Operation, TM1, ThO#1, 5 Shielding blocks have been transferred from ITE to ITW. 
Entry  Thursday, November 13, 2014, 14:01, David Wang, ITW, Repair, TM1, , I replaced flow wheel and coil on ITW MSP water flow sensor. 