ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  659   Wednesday, May 07, 2014, 10:15 David WangITERepairTM3 ITE TM3, entrance module and BL2A3 window flange seals leak check..ITE TM3, entrance module, and 2A3 window
flange seals have been leak checked this
morning after 2 new seals replacement.The
  
  661   Thursday, May 15, 2014, 14:38 David WangITERepairTM3TM3Bias short on ITEAnders and I opened the HV cover in ITE
and did  a visual check inside ITE HV 
cover and top of TM3.Bill was with us and
  
  673   Monday, June 02, 2014, 11:59 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 HS water line with new UC9# target installedChad and I leak checked TM1 HS and UC9#
VCR fittings. No response had been found
on leak detector during the test. I will
  
  675   Monday, June 02, 2014, 15:40 David WangConditioning StationStandard OperationTM1 TM1 and CS turbo pumps have been startedTM1 and CS turbo pumps have been started.
The vacuum readings are fine on all gauges.
  
  676   Tuesday, June 03, 2014, 09:12 David WangConditioning StationStandard OperationTM1UC9#TM1 HS line helium pressure test and TM1 electrical check at CSTM1 HS line helium pressure test and TM1
electrical check at CS under vacuum are finished.
Everything is good. See attachment
 7x 
  677   Monday, June 09, 2014, 10:33 David WangConditioning StationStandard OperationTM1UC9#Stop TM1 and CS trubo pumps and ruff pump.The CS and TM1 is still under vacuum. They
will be vented with argon tomorrow mornig
  
  678   Tuesday, June 10, 2014, 07:57 David WangConditioning StationStandard OperationTM1UC#9 TM1 are vented with argon and disconnected at CS.TM1 will be moved to ITW this morning.   
  680   Tuesday, June 10, 2014, 14:02 David WangITWStandard OperationTM1UC9#TM1 and ITW turbo pumps have been started.TM1 has been connected to ITW. It is pumping
down in ITW with 6 turbo-pumps on.
  
  683   Tuesday, June 17, 2014, 10:46 David WangITWStandard OperationTM1UC#95 Shielding blocks have been transferred from ITE to ITW.5 shielding blocks have been transferred
from ITE to ITW. ITW is configured to take
proton beam. Argon venting system for ITW
  
  692   Thursday, June 26, 2014, 10:57 David WangSouth Hot-CellStandard OperationTM3 Leak check on TM3 HS water line with new target. installed.Chad and I leak checked the TM3 HS water
line with new target installed.  No
leak has been found during the check. Leak
  
  695   Friday, June 27, 2014, 10:16 David WangConditioning StationStandard OperationTM3  TM3 HS water lines helium pressure test. at CSTM3 HS water line helium pressure test
is done at CS. 70 psi helium , 3 minutes.Base
LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4
  
  698   Wednesday, July 02, 2014, 14:29 David WangITEStandard Operation  Reconnected TM3 in ITE.I reconnected TM3 in ITE. All turbo pumps
have been started. The water supply to TM3
only in ITE. The HV keys are back to electrical
  
  700   Tuesday, July 08, 2014, 09:57 David WangITEStandard OperationTM3 5 Shielding blocks have been transferred from ITW to ITE.5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam.
  
  702   Wednesday, July 16, 2014, 11:28 David WangITWStandard OperationTM1 TM1 had been dsiconnected in ITW.The TM1 and ITW  were vented with
argon gas last night. TM1 had been disconnected
in ITW this morning.
  
  708   Thursday, July 17, 2014, 10:13 David WangConditioning StationStandard OperationTM1 Leak check on TM1 HS water line with new target installedChad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure:
  
  709   Thursday, July 17, 2014, 11:49 David WangConditioning StationStandard OperationTM1 TM1 and CS turbo pumps have been startedI connected TM1 at CS. All turbo pumps
have been started. The pumping down is 
good so far.
  
  710   Monday, July 21, 2014, 13:11 David WangConditioning StationStandard OperationTM1 helium pressure test on TM1 HS water line at CS.The TM1 HS line is  pressure tested
this morning with 70 psi helium  at
CS. No response has been found on leak detector.
  
  711   Tuesday, July 22, 2014, 07:32 David WangConditioning StationStandard OperationTM1 Stop TM1 and CS turbo pumps and ruff pump.Stop TM1 and CS turbo pumps and ruff pump.
TM1 is disconnect at CS. It will be vented
tomorrow morning and moved to ITW.
  
  712   Wednesday, July 23, 2014, 13:36 David WangITWStandard OperationTM1 TM1 in ITW.  TM1 has been connected in ITW .
The new roughing pump replaced on last  Friday
works good. I started all turbo pumps in
  
  716   Monday, July 28, 2014, 14:37 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D)and -(C)water lines.
    TM2 installed in Conditioning
Station
    Varian Leak detector
connected directly to Target Module 2   
 7x 