1733
|
Friday, June 08, 2018, 11:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Removal Progress | The containment box has been removed from
TM2, the Enzel lens and steerers disconnected
and optics tray removal has commenced. |
|
|
1734
|
Friday, June 08, 2018, 14:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
|
1735
|
Monday, June 11, 2018, 11:30 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box on | Tm2 containment box has been re-installed
onto TM2. |
|
|
1736
|
Tuesday, June 12, 2018, 11:26 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM4 Optics Tray | I have "slung" the TM4 optics
tray in preparation for its removal. |
|
|
1743
|
Wednesday, June 27, 2018, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM2 has been moved from the silo
to the south hot cell. |
|
|
1745
|
Friday, June 29, 2018, 10:15 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | | TM2 work and target install | On Thursday, June 29th the containment
box of TM2 was removed and the optics tray
re-installed and reconnected. The box was |
|
|
1747
|
Friday, June 29, 2018, 13:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Nb#8 | Electrical Check | The results of the various electrical
checks performed on the TM#2 with and without
the Nb#8 target attached. |
  |
|
1748
|
Tuesday, July 03, 2018, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | Nb#8 | Module move | TM#2 with Nb#8 has been moved from
the south hot cell to the west target station. |
|
|
1750
|
Tuesday, July 03, 2018, 14:42 |
David Wang | ITW | Standard Operation | TM2 | Nb#8 | TM2 has been connected to ITW. | TM2 has been connected to ITW. All turbo
pumps are started. See attachment for connection
checklist. |
|
|
1751
|
Wednesday, July 11, 2018, 15:06 |
Anders Mjos | ITW | Standard Operation | TM2 | Nb#8 | Block move | Maico and Travis moved blocks from ITE
to ITW yesterday |
|
|
1752
|
Wednesday, July 11, 2018, 15:09 |
Anders Mjos | ITW | Maintenance | TM2 | Nb#8 | Uncovered ITW to toubleshoot 2A2M19 | The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were |
|
|
1758
|
Wednesday, July 25, 2018, 13:21 |
Anders Mjos | ITW | Repair | TM2 | Nb#8 | Leak check of ITW | ITW Entrance Module was leak checked yesterday
with the support of Vacuum Group (Dimo &
Edi). The leak detector was connected to |
|
|
1759
|
Tuesday, July 31, 2018, 10:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Nb#8 | Module move | TM#2 with Nb#8 has been moved from
ITW to the south hot cell. |
|
|
1762
|
Wednesday, August 01, 2018, 14:48 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#23 | Spent Target Move | TM#2 with UC#23 has been moved from
the south hot cell to the conditioning station. |
|
|
1763
|
Wednesday, August 01, 2018, 15:12 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | UC#23 | Target mounted - water leak on HS line | The heat shield water lines were not purged
ahead of target exchange in the hot cell.
This resulted in water leaking onto the new |
|
|
1767
|
Tuesday, August 14, 2018, 10:27 |
Travis Cave | ITW | Standard Operation | TM2 | UC#23 | Module move | Both the West Entrance and TM#2 with
UC#23 have been moved back into their places
in the west target station. The Entrance |
|
|
1768
|
Monday, August 20, 2018, 09:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#56 and UC#23 | Electrical Check | Electrical Checks of the last two
targets Ta#56 and UC#23 |
  |
|
1784
|
Tuesday, September 18, 2018, 12:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#23 | Module move | TM#2 with UC#23 has been moved from
ITW to the south hot cell. The shield plug
was also installed remotely as well. |
|
|
1785
|
Thursday, September 20, 2018, 08:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check | Results of the electrical check on
TM#2 with no target after Chad cleaned out
the bolt hole on the module where the target |
|
|
1786
|
Thursday, September 20, 2018, 14:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | nSiC#1 | Electrical Check | TM#2 with the nSiC#1 target had its
check done on it at the south hot cell see
attached for results. |
|