ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1748   Tuesday, July 03, 2018, 09:57 Travis CaveITWStandard OperationTM2Nb#8Module move TM#2 with Nb#8 has been moved from
the south hot cell to the west target station.
  
  1750   Tuesday, July 03, 2018, 14:42 David WangITWStandard OperationTM2Nb#8TM2 has been connected to ITW.TM2 has been connected to ITW. All turbo
pumps are started. See attachment for connection
checklist.
 Nb#4_Module_connection_checklist.pdf 
  1751   Wednesday, July 11, 2018, 15:06 Anders MjosITWStandard OperationTM2Nb#8Block moveMaico and Travis moved blocks from ITE
to ITW yesterday
  
  1752   Wednesday, July 11, 2018, 15:09 Anders MjosITWMaintenanceTM2Nb#8Uncovered ITW to toubleshoot 2A2M19The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were
  
  1758   Wednesday, July 25, 2018, 13:21 Anders MjosITWRepairTM2Nb#8Leak check of ITWITW Entrance Module was leak checked yesterday
with the support of Vacuum Group (Dimo &
Edi). The leak detector was connected to
 Entrance_Module_Leak_2018-07-25.docx 
  1759   Tuesday, July 31, 2018, 10:20 Travis CaveSouth Hot-CellStandard OperationTM2Nb#8Module move TM#2 with Nb#8 has been moved from
ITW to the south hot cell.
  
  1762   Wednesday, August 01, 2018, 14:48 Travis CaveConditioning StationStandard OperationTM2UC#23Spent Target Move TM#2 with UC#23 has been moved from
the south hot cell to the conditioning station.
  
  1763   Wednesday, August 01, 2018, 15:12 Anders MjosSouth Hot-CellStandard OperationTM2UC#23Target mounted - water leak on HS lineThe heat shield water lines were not purged
ahead of target exchange  in the hot cell.
This resulted in water leaking onto the new
 20180801_180130904_iOS.jpg 
  1767   Tuesday, August 14, 2018, 10:27 Travis CaveITWStandard OperationTM2UC#23Module move Both the West Entrance and TM#2 with
UC#23 have been moved back into their places
in the west target station. The Entrance
  
  1768   Monday, August 20, 2018, 09:55 Travis CaveSouth Hot-CellStandard OperationTM2Ta#56 and UC#23Electrical Check Electrical Checks of the last two
targets Ta#56 and UC#23
 Electrical_Check_TM4_Ta56_SHC.pdfElectrical_Check_TM2_UC23_CS.pdfElectrical_Check_TM2_UC23_SHC.pdf 
  1784   Tuesday, September 18, 2018, 12:59 Travis CaveSouth Hot-CellStandard OperationTM2UC#23Module move TM#2 with UC#23 has been moved from
ITW to the south hot cell. The shield plug
was also installed remotely as well.
  
  1785   Thursday, September 20, 2018, 08:36 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check Results of the electrical check on
TM#2 with no target after Chad cleaned out
the bolt hole on the module where the target
 Electrical_Chk_TM2_no_tgt_Sept-20-2018.pdf 
  1786   Thursday, September 20, 2018, 14:35 Travis CaveSouth Hot-CellStandard OperationTM2nSiC#1Electrical Check TM#2 with the nSiC#1 target had its
check done on it at the south hot cell see
attached for results.
 Electrical_Chk_TM2_SHC_nSiC#1_Sept-20-2018.pdf 
  1787   Thursday, September 20, 2018, 14:36 Travis CaveITWStandard OperationTM2nSiC#1Module move TM#2 with nSiC#1 has been moved from
the south hot cell to the west target station.
  
  1788   Friday, September 21, 2018, 10:06 David WangITWStandard OperationTM2UCx23TM2 was disconnected in ITW.TM2 was disconnected in ITW this Tuesday.
See attachment for checklist.
 TM2_UCx_23#_disconnection_in_ITW..pdf 
  1789   Friday, September 21, 2018, 10:07 David WangITWStandard OperationTM2SiC nanoTM2 with SiC nano target was has been connected in ITW.Tm2 with SiC nano has been connected in
ITW. See attachment for checklist
 TM2_with_SiC_nano_connection_in_ITW..pdf 
  1790   Monday, September 24, 2018, 10:21 Anders MjosSouth Hot-CellStandard OperationTM2UC#23Post Irradiation Examination (PIE)UC#23 experienced short between target
and heat shield as it was heated during operation.
The inspection of the target after irradiation
 20180924_161322929_iOS.jpg 
  1793   Tuesday, September 25, 2018, 08:01 chad fisherSouth Hot-CellStandard OperationTM2nSiC#1nSiC#1 installOn September 18th installation of nSiC#1
was attempted on TM2. As usual, new fasteners
were tested previous to insertion into hot
 20180919_132304.jpg20180919_143535.jpg 
  1806   Tuesday, October 23, 2018, 10:45 David WangITWStandard OperationTM2SiC nanoTM2 was disconnected in ITW.TM2(SiC nano) has been disconnected in
ITW. See attachment
 TM2_SiC_nano_disconnection_in_ITW.pdf 
  1812   Tuesday, October 30, 2018, 10:50 Travis CaveITWStandard OperationTM2nSiC#1Modules moved Modules were moved, ITW EX2 was moved
from the conditioning station to the west
target station and TM#2 ,with nSiC#1, 
  